| 1 | Providing Stay for LT poles incl. digging & back filling pit. |
| 2 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductor in roll. |
| 3 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 4 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 5 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 6 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 7 | Repairing/changing WP wire 3 - phase |
| 8 | Repairing/changing Damaged WP wire |
| 9 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 10 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 11 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 12 | Erecting one LT RSJ Pole in position incl. digging & back filling pit. |
| 13 | Loading LT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 14 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. |
| 15 | Renewal of existing damaged/old LT Strut with new PSC strut in place and refitting of all items incl. conveyance (except pole). |
| 16 | Renewal of existing damaged/old LT TW/RSJ/Rail (Sph line) pole with new PSC pole in place and refitting of all items incl. conveyance (except pole). |
| 17 | Straightening one Slanted LT pole after unbinding the line and rebinding the line after work. |
| 18 | DSR 2018 13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work |
| 19 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 20 | Centering and shuttering including strutting,propping etc. and removal of form for all heights for lintels,beams and plinth beams including cost of all materials labour etc complete as per the standard specifications and direction of board staff. |
| 21 | Cement concrete i,:2:4 using 20mm nominal size aggregate, laying to lines and levels at all elevations, consolidating curing, including cost of all materials and labor charges, etc. complete including the cost of cement. as per the direction of the departmental officers. |
| 22 | Plastering with cement mortar 1:4, (1 cement : 4 fine sand) 12 mm thick one coat, floated hard and trowelled smooth for outside walls up to 10 m height including cost of all materials and labour etc. complete as per the standard specifications and direction of Board staff. ( DSR 2018 rate ) |
| 23 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 24 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 25 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 26 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 27 | Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. |
| 28 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 29 | Installation of Insulation piercing connector for main to service line main :50-150 sqmm, Tap : 4-35 sqmm |
| 30 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm |
| 31 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 32 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 33 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 34 | Installation of Pre-insulated straight through joints for 70 sq mm cable |
| 35 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 36 | Providing End Caps |
| 37 | Providing Cable Tie |
| 38 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 39 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 40 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 41 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 42 | Erection of suspension clamp for LT ABC of any size Please Enable Macros to View BoQ information |