| 1 | Slice No: 1:-Providing Barricading Reception and Protective Arrangements in Counting Hall, Strong room and other Amenities in the counting centre for 188,189 Madurai East and Melur Assembly Constituency - 2026 in Tamilnadu Agriculture college at Madurai |
| 2 | Hire charges for providing barricading arrangements using casurina props of 4\\" to 5\\" dia upto 12 ft height. The spacing between vertical post are being 0.90 m and horizotal post being 0.90m with 0.50 m overlap on either sides and cross braces at required interval etc. in complete shape using coir and nails and as directed by the Departmental Officers. The rate inclusive of labour charges for fixing, transportation of required material, removing the same after completion of specified work.[The hire charges is fixed for the maximum period of 30 days] |
| 3 | inside the building for a height of 3.60m above ground level or as directed by the Departmental officers. The rate inclusive of earthwork excavation to withstand the barricade fixed above. [The hire charges is fixed for the maximum period of 30 days] |
| 4 | Outside the building for a height of 1.80m above ground level or as directed by the Departmental officers. The rate inclusive of earthwork excavation to withstand the barricade fixed above. [The hire charges is fixed for the maximum period of 30 days] |
| 5 | Hire charges for providing Weld mesh for partitionarrangements.Weld mesh gauge 7.5 x 2.50cm.10gauge with outer frames and M.S.Angle of Size 35x35x5mm for outer frames Stiffeners with 32x6mm M.S flats is provided at 90cm intervals for counting hall partition and way partition. For a Maximum period of 30 days |
| 6 | Hire Charges for GI sheet partition for closing the windows, ventilators etc., and storage room outside including cost of labour charges casurina props and nails etc., complete. for a maximum period of 30 days. |
| 7 | Hire charges for Providing GI Sheet Shed including all labour charges and conveyance charges and removing the same after counting is over etc, For a Maximum period of 30 days |
| 8 | Hire charges for providing White Curtain cloth using best quality for counting hall and VIP stage area etc., complete and removing the same after the function is over etc., complete complying with standard specifications and as directed by the departmental officers etc., complete. for a maximum period of 30 days. |
| 9 | Hire charges for Providing Platform 30cm ht using plywood sheet of 19mm thickness. Including cost of fixing, labours, loading unloding charges, For a maximum period of 30 days only. |
| 10 | Hire charges for providing Red carpet arrangements using best quality for VIP stage & VIP area in pandal and removing the same after the function is over etc., complete complying with standard specifications and as directed by the departmental officers etc., complete. for a maximum period of 30 days. |
| 11 | Supply and Fixing sign board of required size with square tubular pipe frame.The pipe are positioned to make required sign board shape including cutting, welding, loading, unloading and Fixing charges etc.complete. For a maximum period of 30 days only. |
| 12 | Engaging labour of Cleaning the work site before and after couting as dircted by the departmental officers. |
| 13 | Maz door Class - II |
| 14 | Carpenter Class - II |
| 15 | Hire Charges for manufacturing, supplying and fixing in position of postal vote collecting shelf of size 2.40mx 1.20m x0.30m made out of 8mm thick ply wood board for outer bottom,top and side. Inner side partition using 6mm thick particle board for making into 32 equal size compartments. The rate for hire charges inclusive of cost of material provided, labour charges, fixing in position, transportation etc. and as directed by the Departmental officers.[The hire charges is fixed for the maximum period of 30 Days] |
| 16 | Hire charges for supplying and fixing of SS Table for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc., For a Maximum period of 30 days |
| 17 | Hire charges for supplying and fixing of Plastic Chairs for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc., For a Maximum period of 30 days |
| 18 | Hire charges for Movable barricarding including cost of water and transportation charges etc., complete |
| 19 | Slice No: 2:- External work of Barricading and Shed arrangements for Political parties and officials for 190, Solavanthan (SC) and 197 , Usilampatti Legislative Assembly Constituency in Anna University at Madurai for the Tamil Nadu Legislative Assembly Election held in the year 2026 |
| 20 | Hire charges for providing G,I sheet for partition work with the support using casurina props of 4\\" to 5\\" dia .the casurina props and cross braces are to be provided at the required interval and firmly fixed in postion using nails and coir as directed by the departmental officers the rate inclusive of fixing partition upto ceiling height and directed by the departmental officers, hire charges for material provided labour charges for fixing, transportation, removing the same after completion of work and rediong the same to the orginal condition (The hire charges is fixed for the maximum period of 30 days) |
| 21 | Hire charges for Providing Platform 30cm ht using plywood sheet of 19mm thickness. Including cost of fixing, labours, loading unloding charges, For a maximum period of 30 days only. |
| 22 | Hire charges for providing White Curtain cloth using best quality for counting hall and VIP stage area etc., complete and removing the same after the function is over etc., complete complying with standard specifications and as directed by the departmental officers etc., complete. for a maximum period of 30 days. |
| 23 | Hire charges for providing barricading arrangements using casurina props of 4\\" to 5\\" dia upto 12 ft height. The spacing between vertical post are being 0.90 m and horizotal post being 0.90m with 0.50 m overlap on either sides and cross braces at required interval etc. in complete shape using coir and nails and as directed by the Departmental Officers. The rate inclusive of labour charges for fixing, transportation of required material, removing the same after completion of specified work.[The hire charges is fixed for the maximum period of 30 days] |
| 24 | Levelling the site and jungle clearance with JCB & Dozer etc |
| 25 | Hire Charges for providing lift arrangements with generator for shifting EVM Control unit and VVPATfrom Ground Floor to Second floor including cost of Diesel and forming steel outer frame work in the platform with steel angles, welding etc., complete (During storing in strong room and after counting removing from strong room) for a maximum period of 30 days |
| 26 | Supply and Fixing sign board of required size with square tubular pipe frame.The pipe are positioned to make required sign board shape including cutting, welding, loading, unloading and Fixing charges etc.complete. For a maximum period of 30 days only. |
| 27 | Engaging labour of Cleaning the work site before and after couting as dircted by the departmental officers. |
| 28 | Maz door Class - II |
| 29 | Carpenter class - II |
| 30 | Hire Charges for manufacturing, supplying and fixing in position of postal vote collecting shelf of size 2.40mx 1.20m x0.30m made out of 8mm thick ply wood board for outer bottom,top and side. Inner side partition using 6mm thick particle board for making into 32 equal size compartments. The rate for hire charges inclusive of cost of material provided, labour charges, fixing in position, transportation etc. and as directed by the Departmental officers.[The hire charges is fixed for a maximum period of 30 Days] |
| 31 | Hire charges for supplying and fixing of SS Table for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc., for a maximum period of 30 days |
| 32 | Hire charges for supplying and fixing of Plastic Chairs for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc.,for a maximum period of 30 days |
| 33 | Slice No: 3:- Providing Barricading Reception and Protective Arrangements in Counting Hall, Strong room and other Amenities in the counting centre for 191,192 Madurai North and Madurai South Assembly Constituency - 2026 in Thiyagarajar Engineering College at Madurai District. |
| 34 | Hire charges for providing barricading arrangements using casurina props of 4\\" to 5\\" dia upto 12 ft height. The spacing between vertical post are being 0.90 m and horizotal post being 0.90m with 0.50 m overlap on either sides and cross braces at required interval etc. in complete shape using coir and nails and as directed by the Departmental Officers. The rate inclusive of labour charges for fixing, transportation of required material, removing the same after completion of specified work.[The hire charges is fixed for the maximum period of 30 days |
| 35 | inside the building for a height of 3.60m above ground level or as directed by the Departmental officers. The rate inclusive of earthwork excavation to withstand the barricade fixed above. [The hire charges is fixed for the maximum period of 30 days] |
| 36 | Outside the building for a height of 1.80m above ground level or as directed by the Departmental officers. The rate inclusive of earthwork excavation to withstand the barricade fixed above. [The hire charges is fixed for the maximum period of 30 days] |
| 37 | Hire charges for Providing Weld mesh partition arrangements.Using Weld mesh 7.5 x 2.5cm. 10 Gauge with outer frames and M.S. angles of size 35x35x5mm for the outer frames stiffeners with 32 x 6mm M.S flat is provided at 90cm intervals for Counting hall partition and way partition etc., including cost of nails, screws, binding wire and labour charges etc., and removing the same after counting is over, for a maximum period of 30 days. |
| 38 | Hire Charges for GI sheet partition for closing the windows, ventilators etc., and storage room outside including cost of labour charges casurina props and nails etc., complete. for a maximum period of 30 days. |
| 39 | Hire charges for Providing GI Sheet Shed including all labour charges and conveyance charges and removing the same after counting is over etc, For a maximum period of 30 days only. |
| 40 | Hire charges for providing White Curtain cloth using best quality for counting hall and VIP stage area etc., complete and removing the same after the function is over etc., complete complying with standard specifications and as directed by the departmental officers etc., complete. for a maximum period of 30 days. |
| 41 | Hire charges for Providing Platform 30cm ht using plywood sheet of 19mm thickness. Including cost of fixing, labours, loading unloding charges, For a maximum period of 30 days only. |
| 42 | Hire charges for providing Red carpet arrangements using best quality for VIP stage & VIP area in pandal and removing the same after the function is over etc., complete complying with standard specifications and as directed by the departmental officers etc., complete. for a maximum period of 30 days. |
| 43 | Supply and Fixing Flex sign board of required size with square tubular pipe frame.The pipe are positioned to make required sign board shape including cutting, welding, loading, unloading and Fixing charges etc.complete. For a maximum period of 30 days only. |
| 44 | Engaging labour of Cleaning the work site before and after couting as dircted by the departmental officers. |
| 45 | Maz door Class - II |
| 46 | Carpenter Class - II |
| 47 | Leveling the site and jungle clearance with JCB & Dozzar etc. |
| 48 | Hire Charges for manufacturing, supplying and fixing in position of postal vote collecting shelf of size 2.40mx 1.20m x0.30m made out of 8mm thick ply wood board for outer bottom,top and side. Inner side partition using 6mm thick particle board for making into 32 equal size compartments. The rate for hire charges inclusive of cost of material provided, labour charges, fixing in position, transportation etc. and as directed by the Departmental officers.[The hire charges is fixed for a maximum period of 30 Days only] |
| 49 | Hire charges for supplying and fixing of SS Table for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc.,For a maximum period of 30 days only. |
| 50 | Hire charges for supplying and fixing of Plastic Chairs for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc.,For a maximum period of 30 days only. |
| 51 | Hire charges for Movable barricarding including cost of water and transportation charges etc., complete, For a maximum period of 30 days only. |
| 52 | Slice No: 4:- Providing Barricading Reception and Protective Arrangements in Counting Hall, Strong room and other Amenities in the counting centre for 193,194 Madurai Central and West Assembly Constituency - 2026 in Madura college at Madurai |
| 53 | Hire charges for providing barricading arrangements using casurina props of 4\\" to 5\\" dia. The spacing between vertical post are being 0.90 m and horizontal post being 0.90m with 0.50 m overlap on either side and cross braces at required interval etc. in complete shape using coir and nails and as directed by the Departmental Officers. The rate inclusive of labor charges for fixing, transportation of required material, removing the same after completion of specified work.[The hire charges is fixed for the maximum period of 30 days] |
| 54 | inside the building for a height of 3.60m above ground level or as directed by the Departmental officers. The rate inclusive of earthwork excavation to withstand the barricade fixed above. [The hire charges is fixed for the maximum period of 30 days] |
| 55 | Outside the building for a height of 1.80m above ground level or as directed by the Departmental officers. The rate inclusive of earthwork excavation to withstand the barricade fixed above. [The hire charges is fixed for the maximum period of 30 days] |
| 56 | Hire charges for Providing Weld mesh partition arrangements.Using Weld mesh 7.5 x 2.5cm. 10 Gauge with outer frames and M.S. angles of size 35x35x5mm for the outer frames stiffeners with 32 x 6mm M.S flat is provided at 90cm intervals for Counting hall partition and way partition etc., including cost of nails, screws, binding wire and labour charges etc., and removing the same after counting is over, for a maximum period of 30 days. |
| 57 | Hire Charges for GI sheet partition for closing the windows, ventilators etc., and storage room outside including cost of labour charges casurina props and nails etc., complete. for a maximum period of 30 days. |
| 58 | Hire charges for Providing GI Sheet Shed including all labour charges and conveyance charges and removing the same after counting is over etc, For a Maximum period of 30 days |
| 59 | Hire charges for providing White Curtain cloth using best quality for counting hall and VIP stage area etc., complete and removing the same after the function is over etc., complete complying with standard specifications and as directed by the departmental officers etc., complete. for a maximum period of 30 days. |
| 60 | Hire charges for Providing Platform 30cm ht using plywood sheet of 19mm thickness. Including cost of fixing, labours, loading unloding charges, For a maximum period of 30 days only. |
| 61 | Hire charges for providing Red carpet arrangements using best quality for VIP stage & VIP area in pandal and removing the same after the function is over etc., complete complying with standard specifications and as directed by the departmental officers etc., complete. for a maximum period of 30 days. |
| 62 | Supply and Fixing sign board of required size with square tubular pipe frame.The pipe are positioned to make required sign board shape including cutting, welding, loading, unloading and Fixing charges etc.complete.For a Maximum period of 30 days. |
| 63 | Engaging labour of Cleaning the work site before and after couting as dircted by the departmental officers. |
| 64 | Maz door Class - II |
| 65 | Carpenter Class - II |
| 66 | Leveling the site and jungle clearance with JCB & Dozzar etc. |
| 67 | Hire Charges for manufacturing, supplying and fixing in position of postal vote collecting shelf of size 2.40mx 1.20m x0.30m made out of 8mm thick ply wood board for outer bottom,top and side. Inner side partition using 6mm thick particle board for making into 32 equal size compartments. The rate for hire charges inclusive of cost of material provided, labour charges, fixing in position, transportation etc. and as directed by the Departmental officers.[The hire charges is fixed for the maximum period of 30 Days] |
| 68 | Hire charges for supplying and fixing of SS Table for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc., For a Maximum period of 30 days |
| 69 | Hire charges for supplying and fixing of Plastic Chairs for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc., For a Maximum period of 30 days |
| 70 | Slice No: 5:- External work of Barricading and Shed arrangements for Political parties and officials for 196, Thirumangalam and 195 , Thiruparankundram Legislative Assembly Constituency in Government Arts and Science College at Kappalur, Thirumangalam for the Tamil Nadu Legislative Assembly Election held in the year 2026 |
| 71 | Hire Charges for GI sheet partition for closing the windows, ventilators etc., and storage room outside including cost of labour charges casurina props and nails etc., complete. for a maximum period of 30 days. |
| 72 | Hire charges for Providing Platform 30cm ht using plywood sheet of 19mm thickness. Including cost of fixing, labours, loading unloding charges, For a maximum period of 30 days only. |
| 73 | Hire charges for providing White Curtain cloth using best quality for counting hall and VIP stage area etc., complete and removing the same after the function is over etc., complete complying with standard specifications and as directed by the departmental officers etc., complete. for a maximum period of 30 days. |
| 74 | Hire charges for providing barricading arrangements using casurina props of 4\\" to 5\\" dia upto 12 ft height. The spacing between vertical post are being 0.90 m and horizotal post being 0.90m with 0.50 m overlap on either sides and cross braces at required interval etc. in complete shape using coir and nails and as directed by the Departmental Officers. The rate inclusive of labour charges for fixing, transportation of required material, removing the same after completion of specified work.[The hire charges is fixed for the maximum period of 30 days] |
| 75 | Levelling the site and jungle clearance with JCB & Dozer etc |
| 76 | Supply and Fixing sign board of required size with square tubular pipe frame.The pipe are positioned to make required sign board shape including cutting, welding, loading, unloading and Fixing charges etc.complete. For a maximum period of 30 days only. |
| 77 | Engaging labour of Cleaning the work site before and after couting as dircted by the departmental officers. |
| 78 | Mazdoor Class - II |
| 79 | Carpenter class - II |
| 80 | Hire Charges for manufacturing, supplying and fixing in position of postal vote collecting shelf of size 2.40mx 1.20m x0.30m made out of 8mm thick ply wood board for outer bottom,top and side. Inner side partition using 6mm thick particle board for making into 32 equal size compartments. The rate for hire charges inclusive of cost of material provided, labour charges, fixing in position, transportation etc. and as directed by the Departmental officers.[The hire charges is fixed for a maximum period of 30 Days only] |
| 81 | Hire charges for supplying and fixing of SS Table for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc.,For a maximum period of 30 days only. |
| 82 | Hire charges for supplying and fixing of Plastic Chairs for Two Constituency and outer side of Counting centre, including loading, unloading, labour charges and conveyance charges etc.,For a maximum period of 30 days only. |
| 83 | Hire Charges for providing lift arrangements with generator for shifting EVM Control unit and VVPATfrom Ground Floor to Second floor including cost of Diesel and forming steel outer frame work in the platform with steel angles, welding etc., complete (During storing in strong room and after counting removing from strong room) for a maximum period of 30 days |
| 84 | GST 18 % Please Enable Macros to View BoQ information |