|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
| 3 | Ordinary Rock |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of soil |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material.All kinds of soil. |
| 6 | Ordinary rock |
| 7 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared |
| 8 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions of Engineer Incharge, all inclusive |
| 9 | Engagement of Labourer (Skilled) |
| 10 | Engagement of Labourer (UnSkilled) |
| 11 | Engagement of Shikara Boat along with boatman. |
| 12 | Engagement of Boat (Kutch) along with boatman. |
| 13 | Cutting saw machine (wood cutter) Including POL and Operator (Complete) |
| 14 | Engagement of JCB including POL and driver complete. (During work) |
| 15 | Hire charges of contract carrier (vehicle) like Sumo/scorpio/Taweera during day or night along with licensed commercial driver for site inspection/ Emergency situations/ movement of officials within the Divisional jurisdiction including Driver and POL on need basis only. (complete) |
| 16 | Engagement of vehicles (Tractors) for different nature of works incl. cost of service of operating staff, cost of POL and all other comsumable for the machinery at site as directed by in charge engineer complete job. |
| 17 | Removing/Fixing of Gauge plates on existing channel including cost of nuts bolts and geyser bolts, welding/drilling of holes where ever required including all types of carriages upto site of work including necessary arrangements of boats, ladders and returning of damaged rotten gauge plates to Divisional store. Complete Job at site of different sizes, viz1.5*0.15m/1.50*0.20m |
| 18 | Placing/Fixing/supply of gauge plates of Fibre glass reinforced plastic (FRP) 5mm thick sheet very sturdy, gel coat finish composite material, sandwich with MS strip by contact moulding process, engraved moulded bandwidth and figures with computerized gauge marking with reflective radium pasting, spray lamination with polyurethane chemical for surface protection. Including cost of nuts and bolts and geyser bolts, welding/ drilling of holes where ever required including all types of carriages upto site of work including necessary arrangement of boats,ladders. 1.50*0.15m/1.50*0.20m |
| 19 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (1:3:6) |
| 20 | (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size) (1:2:4) |
| 21 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 22 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 23 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. |
| 24 | Nut bolts |
| 25 | Electric Welding |
| 26 | 12 Volt 26 Ah Battery for AWLR of approved Brand Quality |
| 27 | Solar Panel for AWLR of 60 Watt or more of approved brand quality |
| 28 | Carriage of materials from Approved source up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport. Sand/20mm agg./stone dust avg. lead of upto 01 kms |
| 29 | Sand/20mm agg./stone dust avg. lead of upto 02 kms |
| 30 | Sand/20mm agg./stone dust avg. lead of upto 03 kms |
| 31 | Sand/20mm agg./stone dust avg. lead of upto 04 kms |
| 32 | Sand/20mm agg./stone dust avg. lead of upto 05 kms |
| 33 | Steel/cement avg. lead of upto 01km |
| 34 | Steel/cement avg. lead of upto 02km |
| 35 | Steel/cement avg. lead of upto 03km |
| 36 | Steel/cement avg. lead of upto 04km |
| 37 | Steel/cement avg. lead of upto 05km |
| 38 | Carriage of material from dumping site to actual site of work, including loading, unloading and stacking etc. complete by manual labour.Sand/20mm agg./Stone dust for an avg. lead upto 50 mtr |
| 39 | Steel for an avg. lead upto 50 mtr |
| 40 | Cement for an avg. lead upto 50 mtr Please Enable Macros to View BoQ information |