|
| 1 | Material and labour for preparation of old surfaces of ceiling including cornicess plaster etc for lime wash (white washing) and applying one coat of white wash on ceiling complete all as specified and as directed. |
| 2 | Material and labour for preparation of old surfaces of wall including cornicess plaster etc for lime wash (white washing) and applying one coat of white wash on wall complete all as specified and as directed. |
| 3 | Material and labour for preparation of old distempered wall surfaces by washing, rubbing down and stopping the surfaces and applying one coat of oil bound distemper to interior walls complete and filling the imperfaction surfaces even such as holes, dirt, fine cracks are to be filled with 2-3 layer wall care putty (whereverrequired as directed by Engr-in-charge) all as specified and as directed. |
| 4 | Material and labour for preparation of old decorated steel surfaces of any description exceeding 10 cm width or grith not otherwise specified and applying one coat of Epoxy paint on steel surfaces complete all as per manufactures instruction and directed by Engr-in-charge. |
| 5 | Material and labour for preparation of old wooden surfaces of any description exceeding 10 cm width or grith not otherwise specified and applying one coat of syntheic enemal paint complete all as specified and as directed. |
| 6 | Material and labour for preparation of old decorated surfaces of wall by washing, rubbing down scraping, rubbing down and stopping of painted surfaces and applying one coat of first quality weather proof acrylic paint exterior grade on external surfaces complete and filling the imperfaction surfaces such as holes, fine cracks are to be filled with cement and fine sand ratio (1:3) (whereever required as directed by Engr-in-charge) complete all as per manufactures and directed by Engr-in-charge. Make : Berger(Weather coat all guards) Asian (apex ultima )/ Dulex (weather shield Maz/Ulta Nerolac (Excel top Guard) NOTE : Paint make and shade/colour (border and other area) as approved by GE |
| 7 | Taking down cement plaster of any description including raking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. |
| 8 | Material and Labour for 15mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar 1:4 finished even and smooth with out using extra cement complete all as specified and as directed. |
| 9 | Material and Labour for 10mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar 1:6 finished even and smooth with out using extra cement complete all as specified and as directed. |
| 10 | Material and labour for preparation of New plastered surfaces and applying two coat of first quality weather proof acrylic paint exterior grade on external surfaces complete and complete all as per manufactures and directed by Engr-in-charge. Make : Berger(Weather coat all guards) Asian (apex ultima )/ Dulex (weather shield Maz/Ulta Nerolac (Excel top Guard) NOTE : Paint make and shade/colour (border and other area) as approved by GE |
| 11 | Material and labour for preparation of new plastered surfaces of wall and applying two coats of oil bound distemper over a coat of alkali resistant priming paint incl 1mm thick wall care putty complete all as specified and as directed. |
| 12 | M&L for preparation of old treated concrete or plasterd surfaces exc 10cm width or girth of Dispersal bay/taxi track and applying one coat epoxy paint (water based)of approved manufacture,complete all as specified and directed by Engr-in Charge. |
| 13 | Complete removal of existing treatment from old plastered/pointed surfaces(Dry distember,white / lime wash etc ) and Applying two coats of Oil bound distember/water based distemper over a coat of primer including applying 3mm thick wall putty to filling nail holes,cracks etc upto smooth ,also finished even and smooth complete all as specified and directed by Engr-in Charge. Please Enable Macros to View BoQ information |
| 14 | Complete removal of existing treatment from old plastered/pointed surfaces(Dry distember,white / lime wash etc ) and Applying two coats of Oil bound distember/water based distemper over a coat of primer including applying 3mm thick wall putty to filling nail holes,cracks etc upto smooth ,also finished even and smooth complete all as specified and directed by Engr-in Charge. Please Enable Macros to View BoQ information |