| 1 | (B-3/3.1.6) P&L in position Cement Concrete incl. Curing compaction etc. of specified Grade Excl. the cost of Centering & Shuttering all works up to Plinth level 1:4:8 (1 cement: 4 coarse sand : 8 graded stone aggregate 40mm nominal size) |
| 2 | (B-4/4.9) Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. |
| 3 | (S-3/3.16.3) P&F rigid PVC pipe (IS 4985 mark) class IInd /4 Kg P.SqCM ) approved quality / make including jointing the pipe with solvent cement rubber ring and lubricant 110mm dia |
| 4 | (B-1/1.28) Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil |
| 5 | (G-2/293+G-58/4.2.14) Supply and stacking 40 mm single size aggregate/ballast free from kutch stones, organic matter and vegetationncluding loading ,unloading& transportation with in a lead of 40 km complete in all respect as per dirction of engineer incharge |
| 6 | (R-16/16.76) Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately) |
| 7 | (R-4/4.1.ii) Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading II Material |
| 8 | R-3/3.4(i)+17.45(i).13 Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 20.0km as per MoRTH |
| 9 | (R-16.35.5) Supply & fixing of M-20 grade precast cement concrete Kerb or Dand upto 60 cm length over 20 mm thick base of cement mortar 1:6 including jointing earth work, pointing & jointing with cement mortar 1:4 of size (22.5 x 25)/2 x 30 cm |
| 10 | (R-6/6.3.ii.b) Providing and Laying of Interlocking M-30 grade Concrete Block Pavements having thickness 60 mm as per drawings and as per IS 15658:2006.and materials conforming to MoRTH Specification Clause 602 with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks. Category 'B' : Dentated only two side like I,Z,T shape as per IRC:SP:63-2004 |
| 11 | Labour charges for spreading of available 20 to 63 mm nominal size hand/ crushed broken stone aggrageta in uniform layer on 100 mm thickness in yard of any substation (charged/uncharged GSS) with manual/ Mechanical means, as permitted by engineer in charge with due care, as per safety norms of substations, complete in all respect with all lead anf lift (Payment shall be done as per stack measurment, after deduction of voided, as per norms. Please Enable Macros to View BoQ information |