| 1 | Lump sum amount worked out by the contractor for \\"BUILDINGS & STRUCTURES\\" as listed in Schedule 'A' Part-I. |
| 2 | Lump sum amount worked out by the contractor for \\"PILE FOUNDATION\\" as listed in Schedule 'A' Part-II. |
| 3 | Lump sum amount worked out by the contractor for \\"DEMOLITION/DISMANTLING\\" as listed in Schedule 'A' Part-III. |
| 4 | Lump sum amount worked out by the contractor for \\"SITE CLEARANCE/ AREA DEVELOPMENT/ EARTH WORK\\" as listed in Schedule 'A' Part-IV. |
| 5 | Lump sum amount worked out by the contractor for \\"CIVIL REPAIR WORKS/ ADDITION/ ALTERATION\\" as listed in Schedule 'A' Part-V. |
| 6 | Lump sum amount worked out by the contractor for \\"AREA DRAINAGE\\" as listed in Schedule 'A' Part-VI. |
| 7 | Lump sum amount worked out by the contractor for \\"SEWAGE DISPOSAL\\" as listed in Schedule 'A' Part-VII. |
| 8 | Lump sum amount worked out by the contractor for \\"COMPOUND WALL & FENCING\\" as listed in Schedule 'A' Part-VIII. |
| 9 | Lump sum amount worked out by the contractor for \\"ROAD, PATH, HARD STANDING & CULVERT\\" as listed in Schedule 'A' Part-IX. |
| 10 | Lump sum amount worked out by the contractor for \\"INTERNAL WATER SUPPLY\\" as listed in Schedule 'A' Part-X. |
| 11 | Lump sum amount worked out by the contractor for \\"INTERNAL ELECTRIFICATION\\" as listed in Schedule 'A' Part-XI. |
| 12 | Lump sum amount worked out by the contractor for \\"EXTERNAL WATER SUPPLY\\" as listed in Schedule 'A' Part-XII. B24:B25 |
| 13 | Lump sum amount worked out by the contractor for \\"EXTERNAL ELECTRIFICATION\\" as listed in Schedule 'A' Part-XIII. |
| 14 | Lump sum amount worked out by the contractor for \\"AIR CONDITIONING & REFRIGERATION\\" as listed in Schedule 'A' Part-XIV. |
| 15 | Lump sum amount worked out by the contractor for \\"LIFT\\" as listed in Schedule 'A' Part-XV. |
| 16 | Lump sum amount worked out by the contractor for \\"FIRE ALARM AND DETECTION SYSTEM\\" as listed in Schedule 'A' Part-XVI. |
| 17 | Lump sum amount worked out by the contractor for \\"EXTERNAL FIRE FITTING SYSTEM\\" as listed in Schedule 'A' Part-XVII. |
| 18 | Lump sum amount worked out by the contractor for \\"LIGHTNING PROTECTION\\" as listed in Schedule 'A' Part-XVIII. |
| 19 | Schedule \\"A\\" Part - XIX: [Miscellaneous Items] [PILE FOUNDATION, INTERNAL WATER SUPPLY, CIVIL REPAIR WORKS, INTERNAL ELECTRIFICATION, EXTERNAL WATER SUPPLY, EXTERNAL ELECTRIFICATION, AREA DRAINAGE, ROAD, PATH, HARD STANDING & CULVERT, SEWAGE DISPOSAL, COMPOUND WALL & FENCING, AIR CONDITIONING & REFRIGERATION, LIFT, FIRE ALARM AND DETECTION SYSTEM, EXTERNAL FIRE FITTING SYSTEM, LIGHTNING PROTECTION and EOT CRANE]: [To be quoted by the bidder.] |
| 20 | PILE FOUNDATION |
| 21 | M&L for Reinforced Ready Mixed Cement Concrete M–40 (Design Mix) as in bore hole using Portland Slag cement and admixture Auramix 400 of Fosroc/ Smartcare maximo Plast PX Range of Asian Paint or equivalent approved make for piles in tremie method including necessary dewatering, formwork, concrete mixed in RMC plant, transporting, placing, compacting, vibrating etc., complete all as specified and as directed by Engineer-in-Charge.Notes:(i) Design mix shall be as per IS-456-2000, max size of aggregate shall not exceed 20mm and the slump shall be 150 to 180mm. (ii) Reinforcement shall be measured and paid separately.(iii) Unit rate shall be deemed to include interalia for preliminary design mix, works test cubes as specified. Please Enable Macros to View BoQ information |
| 22 | M&L for Reinforced Ready Mixed Cement Concrete M–40 (Design Mix) as in bore hole using Portland Slag cement and admixture Auramix 400 of Fosroc/ Smartcare maximo Plast PX Range of Asian Paint or equivalent approved make for piles in tremie method including necessary dewatering, formwork, concrete mixed in RMC plant, transporting, placing, compacting, vibrating etc., complete all as specified and as directed by Engineer-in-Charge.Notes:(i) Design mix shall be as per IS-456-2000, max size of aggregate shall not exceed 20mm and the slump shall be 150 to 180mm. (ii) Reinforcement shall be measured and paid separately.(iii) Unit rate shall be deemed to include interalia for preliminary design mix, works test cubes as specified. Please Enable Macros to View BoQ information |