| 1 | Dismantling, clearing away and carefully stacking materials for reuse and restoring the surface into the original condition |
| 2 | Brick / stone masonry in Cement mortar walls under 3m high |
| 3 | One Course of Pressed Tile Roof finish in cement mortar |
| 4 | Finishing the top of roof with one course of machine pressed tiles of following size of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 5 | Old Terrace tile surface repair and UV Resistant hybrid waterproofing coating- Providing and Applying Polyurethane hybrid liquid applied GRIHA certified Waterproofing coating with flutyne protection technology, single component, cold applied, water based acrylic and UV resistant water proofing treatment to the Existing Roof having Tile or any non-porous surface applied @ 1.5 l/m2 in 2 coats to achieve 1mm DFT, having tensile strength with 45 gsm glass fibre mesh 4N/mm2 confirming to ASTM D 412; Elongation at break ≥ 300% and Crack bridging ability up to 3mm, SRI Index 106 as per ASTM E 1980- 01, Water permeability @5 bar – Nil as per EN12390- 8:2019, including surface preparation, priming the surface with single component high-performance waterborne tile primer which is suitable for non - porous surface at a rate of 0.14 L/m2 and spreading 45 gsm glass fibre mesh of 2.5 mm x 2.5 mm sandwiched between the first and second coat completely as per specification. The finished cost to include surface preparation, making coving at Junction, treatment of cracks completely as per specification. |
| 6 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 8 3/4\\" x 4 1/4\\" x 2 3/4\\" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. Cement Mortar 1:6 |
| 7 | In Ground floor |
| 8 | In First floor |
| 9 | In Second floor |
| 10 | Brick partition walls of 10.80cm thickness using best quality Burnt Clay Brick of size 8-3/4\\" x 4-1/4\\" x 2-3/4\\" with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) |
| 11 | In Ground floor |
| 12 | In First floor |
| 13 | In Second floor |
| 14 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 15 | Painting one coat with ready mixed plastic Interior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification |
| 16 | Hire charges for Providing Weld mesh partition arrangements.Using Weld mesh 7.5 x 2.5cm. 10 Gauge with outer frames and M.S. angles of size 35x35x5mm for the outer frames stiffeners with 32 x 6mm M.S flat is provided at 90cm intervals for Counting hall partition and way partition etc., including cost of nails, screws, binding wire and labour charges etc., and removing the same after counting is over, for maximum 40days. |
| 17 | Hire charges for supplying and fixing of plywood of 6mm thick for closing the windows, ventilator in storage rooms including cost of nails, screws and labour charges etc., and removing the same after counting is over, for maximum 40days. |
| 18 | Hire charges for Towards the charges for cost of labour for removing and re-fixing the wooden platform of size 4.90x1.80x0.30m etc as directed by the departmental officers. |
| 19 | Hire charges for Towards the charges for cost of labour for removing and re-fixing the Aluminium partition etc as directed by the departmental officers. |
| 20 | Supplying and fixing in position 15mm dia brass CP screw down tap / Pillar tap / Swan neck tap (heavy duty) of approved make conforming to BIS specifications and quality including cost of shellac, thread, etc., complete complying with standard specification and including cutting and threading wherever necessary. (Taps should be got approved by the Executive Engineer before use on the works) |
| 21 | Supplying, laying and jointing CPVC pipes OF Standard Dimension Ratio 11 (Pressure class 1) conforming to IS:15778 - 2007 of approved quality and best variety of the following dia including cutting and fixing CPVC specials using CPVC adhesives (Solvent Cement) (but excluding cost of such specials) and fixing into wall with teak wood plugs, CPVC clamps and screws making holes on the wall (or) drilling holes in the roof and making good the dismantled portion to original condition with necessary brick work / cement concrete and plastering neatly wherever necessary with necessary scaffolding charges, etc., complete complying with standard specifications and as directed by the departmental officers. (The CPVC pipes shall be got approved by Executive Engineer before use on works) - Internal water supply above ground level. |
| 22 | CPVC pipes 20mm dia |
| 23 | CPVC pipes of 25mm dia |
| 24 | Supplying and Fixing of PVC Water Tank-1000Litres capacity |
| 25 | Hire Charges for erecting Barricading with vertical of 8cm to 10cm dia in length 3.00M of which 2.40M will be above ground level and 0.60M will be below ground level spacing at 2M intervals with horizontal runners 5cm to 8cm dia the runners being fixed in Seven Rows to the verticals the horizontal being screwly fixed to the verticals Coir rope of adequate length to render to entire structure stable including digging holes 15cm dia and 0.60m deep on all surfaces (Block to concrete ground water bound mecadam boulders etc) as directed including errecting the verticals and fixing in the holes screwly & rigidity fixing the runners keeping each of the material against the fit and pit ternage removing the barricading and taken back all the materials as directed by the depamental officers including refilling all the holes and restoring the surface to the original condition and as directed by the Departmental officers.for maximum 40days. |
| 26 | Hire charges for supplying, fixing and removing Piegeon hole (Thapal box) for thapal votes. The over all size of box 1.60m wide and 0.90m height and 12 box holes are provided 0.40x0.30x0.30m size the box made out of 12mm thick ply wood are sides. The cost includes ply wood, labourers nails and screws etc, complete with, standard specifications as directed by the departmental officers.For Maximum 40 days |
| 27 | Hire charges for Providing watch Tower of size 3mx3m, 20ft height. Including cost of fixing, labours, loading unloding charges etc., assembly is rigid in nature.for maximum 40days. |
| 28 | Hire charges for Providing Red Carpet over Platform in counting hall. Including cost of fixing, labours, loading unloding charges etc., for maximum 40days. |
| 29 | Hire charges for Providing, erecting and removing GI shed Including cost of fixing, labours, loading unloding charges etc., for maximum 40days. |
| 30 | Hire charges for Providing, erecting and removing Hoist Lift of Half ton capacity Including cost of fixing, labours, loading unloding charges etc., for maximum 40days. |
| 31 | Hire charges for Providing, erecting and removing Arabian Tent Including cost of fixing, labours, loading unloding charges etc., for maximum 40days. |
| 32 | Hire charges for Plastic chairs including labour,transportation loading & unloading charges etc complete. for maximum 40days. |
| 33 | GST @ 18 % Please Enable Macros to View BoQ information |