| 1 | Jungle clearance and Levelling the site with JCB & Dozzar etc |
| 2 | Dismantling and clearing away and carefully stacking the materials useful for reuse only |
| 3 | Brick / stone masonry in Cement mortar walls under 3m high |
| 4 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification |
| 5 | Brick work in Cement Mortar 1:5 (One cement and five crushed stone sand) using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. |
| 6 | In Ground Floor |
| 7 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 8 | Stucco plastering 12mm thick using blue granite chips of size 10mm and below over a base plastering with cement mortar 1:5, 12mm thick, etc., complete complying with standard specifications |
| 9 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed (Exterior Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. |
| 10 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed (Interior Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. |
| 11 | Supplying and fixing 50mm dia GI pipe for post including labour charges for cutting, welding and fixing with MS flats (excluding cost of flat), etc., as directed by the departmental officers |
| 12 | Supplying and fixing Chain Link Fencing using 2” x 2” 10 Gauge Galvanised Iron Wire including cost of transportation to site of work (excluding cost of G.I. Pipe) as directed by the Departmental Officers complete complying with standard specification. |
| 13 | Supplying and fixing Mild Steel grills for windows, ventilators etc.,complete complying with standard specifications and as directed by the departmental officers. |
| 14 | Hire charges for supplying & Fixing of plywood of 6mm thick for closing the windows, Ventilator in storage rooms including cost of nails, screws and labour charges etc.., and removing the same after counting is over etc.., Complete |
| 15 | Hire charges for Cross bracings over the plywood in storage rooms including cost of nails, screws and labour charges etc.., and removing the same after counting is over etc.., Complete for a maximum period of 35 days |
| 16 | Provisions for fixing thermocol sheet with suitable adhesive the storage room for placing the votting machine 50mm thick and Numbering the Top of Thermocol Sheet including Painting terials,labour,transportation charges etc complete for a maximum period of 35 days |
| 17 | Supplying and fixing of constituency way direction name board (60cm x 30cm ) arrangements by using hollow foam sheet including materials like vertical stick with adequate support printing charges erection charges and labour charges |
| 18 | Towards charges for Name board Using with Stickering including the cost of Sticker, labour charges and fixing the board in position with necessary nail as directed by the departmental officers etc., complete and removing the same after the counting is over |
| 19 | Hire charges for Providing steel barricading arrangements of 1.20m height using 40mmx40mm MS Square pipes of 20cm Centre to centre interval etc..,place shown by the departmental officers for maximum 25 days |
| 20 | Hire charges for GI Sheet pandhal including all labour charges and conveyance chargesand removing the same after the counting is over |
| 21 | Hire charges for providing checking booth arrangements with weld mesh partition covered with cloth work including cost of fixing , labour , loading & unloading charges etc.., |
| 22 | Hire charges of Providing weld mesh partition arrangements using weld mesh 7.5 x 2.5 cm 10 Gauge with outer frames and MS angle of size 15x15x5mm for the outer frame stiffeners with 32x6mm M.S.Flat is provided at bar & Counting hall partition and way partition etc..,included cost of nails,screws,binding wire and labour charges etc.., and removing the same after the counting is over |
| 23 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. |
| 24 | Hire charges of providing platform in counting hall 30cm height using plywood sheet of 40mm thickness including cost of fixing, labours,loading & unloading charges etc.., Complete |
| 25 | Hire charges of providing Red Carpet Over platform in counting hall including cost of fixing, labours,loading unloading charges etc.., Complete |
| 26 | Hire charges for postal vote rack box in counting hall including cost of fixing, labours,loading unloading charges etc.., Complete |
| 27 | Hire charges for Country wood rack using 19mm thick ply wood with country wood scantling for storage the Ballot unit, VVPAT and control unit etc., complete. |
| 28 | Hire charges for watch tower arrangements of size 3mx3m x 20ft. Height. Including cost of fixing, labours, loading unloading charges etc. for maximum 35 days |
| 29 | Hire charges for providing of S type chairsof 22 No.s per day for six constituency counting halls including loading unloading labour charges and conveyance charges etc.., Complete |
| 30 | Counting halls |
| 31 | For observers |
| 32 | For Scrutiny |
| 33 | Hire charges for providing of plastic chairs of 1370 No.s per day for six constituency and outer side of the counting centre including loading unloading labour charges and conveyance charges etc.., Complete |
| 34 | Hire charges for providing of SS Table of 253Nos per day for six constituency and outer side of the counting centre including loading unloading labour charge and conveyancecharges etc.., Complete |
| 35 | Hire charges for providing designed table cloth using lycra designed cloth including cost of fixing , labours , loading unloading labour charges etc.., Complete |
| 36 | Scrutiny halls |
| 37 | Hire charges for 3 seater with 2 no.s of single Sofa set with teepoy for Observers & returning Officer inside the counting centre including loading unloading labour charge and conveyancecharges etc.., Complete |
| 38 | Superintendent of police Room |
| 39 | DRO Room |
| 40 | Observers & RO |
| 41 | Charges for shifting the counting table and chairs from collectorate building to VOC Engineering college including labours for loading unloading and conveyance etc.., Complete |
| 42 | Engaging the labours for cleaning the campus toilts,counting hall including moment of classroom benches before and after counting etc complete |
| 43 | Hire charges for providing ABC powder type fire Extinguisher 6.00kg including cost of fixing labour loading unloading charges etc.,complete |
| 44 | Hire charges for providing carbon-di-oxide gas type fire Extinguisher 4.50kg including cost of fixing labour loading unloading charges etc.,complete |
| 45 | GST Please Enable Macros to View BoQ information |