|
| 1 | Material & Labour for preparation plastered surfaces washing rubbing down and stopping of emulsion paint on surfaces and applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over Old surfaces of bldgs height with using safety measures complete all as specified and directed(Note : Rate inclusive of stilt + 10 floor Height of bldg) |
| 2 | Demolition of cement concrete (un reinforced) in ground floors and paving n exc 15 cm thickness (below or above ground level) complete all as specified and directed. |
| 3 | M & L for 40 mm thick cement concrete (1:2:4) type B-1 (using 20mm graded stone aggregate) as in floor surface even and smooth without using extra cement, complete all as specified and directed |
| 4 | M&L screed bed or bedding layer 15 mm thick in cement mortar (1:6) on floors for laying floor finish complete all as specified and as directed. |
| 5 | M&L for 300x300x9.80 mm thick heavy duty parking tile set jointed and pointed in neat cement slurry with grey cement and pigments as in floor complete all as specified and directed. (Note : Screed bed or bedding layer shall be measured and paid separately under respective items in this schedule). |
| 6 | Supply & Fixing for 10mm thick polycarbonate multiwall sheet as stainless steel/MS railing with UV coated fixed with SS flats top and bottom rubber gasket and screws 25mm long all as specified and directed . |
| 7 | Re-fixing/tightning the loose stainless steel railing available in balconies/stair case with screws, stainless steel dash fasteners, stainless steel bolts , washer and using the necessaries accessories complete all as specified and directed |
| 8 | M & L for easing adjusting of wooden doors either or double both and refitting of shutter section with screw including replacement of unserviceable locking arrengment/hinges/handles ,stay hook and nessessary neoprene beading complete all as specifed and as directed |
| 9 | M & L for easing adjusting of aluminium doors either or double both and refitting of shutter section with screw including replacement of unserviceable locking arrengment/hinges/handles ,stay hook and nessessary neoprene beading complete all as specifed and as directed |
| 10 | Material & Labour for providing and fixing stainless steel (Grade 304) railing made of hollow tubes,channels, plates etc., including welding, grinding, buffing, polishing and making curvature (where eve required) and fitting the same with necessar stainless steel nuts and bolts complete, includingfixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel boltsetc., of required size, on the top of floor or the side of waist slab with suitable arrangement complete all as specifed and as directed |
| 11 | Taking up or down 32mm dia CPVC pipe and connection including cleaning for re-fixing or removal to store complete all as specifed and as directed |
| 12 | Supplying and laying of 32mm bore CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified. |
| 13 | Dismantling structural steel work including doors, gates but excluding framed truss etc complete all as specifed and as directed |
| 14 | M&L for Framed work as in doors or gates of angle or other section with gusset plates, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering. Doors, etc. to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing complete all as specified as directed. |
| 15 | S&F Stainless steel wire cloth 0.36mm nominal dia of wire and average width of aperture 1.18 mm and fixed stainless steel wire staple, complete all as specified and directed. Please Enable Macros to View BoQ information |