| 1 | Carriage of Materials By Mechanical Transport including loading,unloading and stacking Manure , sludge or garbage Lead up to 1 to 2.0 - km |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 4 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil |
| 5 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 9 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars |
| 11 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate |
| 12 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter |
| 13 | Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion.Single tee without door 110x110x110 mm |
| 14 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) |
| 15 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) |
| 16 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 17 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 18 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 19 | Brick work with FLY ASH BRICK in Foundation & plinth in cement morter 1:6( 1 Cement: 6 coarse sand) etc. complete as per instruction of the EIC. |
| 20 | Half brick masonry withFLY ASH bricks in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand) |
| 21 | Cleaning of main drain including desilting of drain and stacking the malaba/garbage at the area marked place all complete as per instrucyion of engineer in charge.Above 300x300 mm |
| 22 | Cleaning of small drain including desilting of drain and stacking the malaba/garbage at the area marked place all complete as per instrucyion of engineer in charge.up to 300x300 mm |
| 23 | Cleaning of septic tank of 20 to 50 users capacity with tools and tackies including disposal of sludge materials outside of the colony as suitable place with all leads as per instruction of engineer in charge. |
| 24 | Cleaning of Inspection Chember with tools and tackies including disposal of sludge materials outside of the colony as suitable place with all leads as per instruction of engineer in charge. |
| 25 | Disposal of Big dead animals like cow, baffellow,calf etc including transportation to the specified place making earth pit and disposed into pit and covered it with earth as per instruction of engineer in charge. |
| 26 | Disposal ofsmall dead animals like dog,cat,pig etc including transportation to the specified place making earth pit and disposed into pit and covered it with earth as per instruction of engineer in charge. |
| 27 | day to day maintenance of ECO PARK near VTC like replacement of plant , watering , grass cutting and plant maintenance (01 labour per day) |
| 28 | Day to day sweeping, cleaning of toilet ,bathroom , officers club, staff club, and also cleaning of chocked toilet, bathroom of residential quarters of Vindhya Colony on regular basis minimum 01 sweeper deployed per day. |
| 29 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) : Screened through sieve of I.S. designation 20 mm |
| 30 | Providing and Displaying Marigold jaffri dwarf in different colour well developed with fresh & healthy foliage with 12 to 15 flowers in full bloom specimen plant 23 to 30 cm ht. in 20 cm Earthen Pot/Plastic Pot and as per directionof the officer-in-charge. |
| 31 | Providing and Displaying Zinnia hybrid double in different colour well developed fresh & healthy 30 to 45 cm ht. (3 to 4 in each pot) full bloom in 25 cm Earthen Pot/Plastic Pot and as per direction of the officer-in-charge. |
| 32 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |