| 1 | Providing, laying spreading and compacting stoneaggregates of specific sizes 53 mm to 22.4 mm towater bound macadam specification includingspreading in uniform thickness, hand packing |
| 2 | Providing and laying tack coat with bitumin usingbitumin VG-10 pressure distributer at the rate of0.25 par sqm on the prepared bituminous surfacecleaned with mechanical broom as per MORTHspecification clause No.503. |
| 3 | Providing and laying dence graded bituminousmacadam with higher capacity batch HMP usingcrushed aggregates of specified grading, premixedwith bituminous binder @ 4.5 percent by by weightof total mix and filler, transporting the hot mix towork site,laying with a hydrostatic paver finishaerwith sensor control to the required grade, level andalignment, rolling with smooth wheeled, vibratoryand tandem rollers to achieve the desiredcompaction as per MORTH & specification clauseNo. 505 complete in all respect. |
| 4 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing anaverage output of 75 tonnes per hour using crishedaggregates of specified grading, premixed withbituminous binder VG-30 @ 5.40 percent of mixand filler, transporting the hot mix to work site,laying with a hydrostatic paver finishaer withmechanical control to the required grade, level andalignment, rolling with smooth wheeled, vibratoryand tandem rollers to achive the desiredcompaction as per MORTH specification clause No.509 |
| 5 | Brick masonry work in 1:3 cement mortar insubstructure complete excepting pointing andplastreing as per drawing and technicalspecification Clauses 602, 603, 604, 1202 & 1204i/c all cess, labour cess, lavy, toll fee, royalty,Contractor profit but excluding GST. S.I.NO. 12.1 |
| 6 | Plastering with cement mortar (1:4), 12 mm thickon brickwork in substructure as per technicalspecification Clauses 613.4 & 1204 i/c all cess,Labour cess, lavy, toll fee, royalty, Contractor profitbut excluding GST. S.I.NO. 12.3 |
| 7 | Plain / reinforced concrete in (P.C.C. grade M-20)substructure complete as per drawings andtechnical specifications clause 802, 804, 805, 806,807, 1202 & 1204 i/c all cess, labour cess, levy, tollfee, royalty, Contractor profit but excluding GST Please Enable Macros to View BoQ information |