| 1 | Taking down cement plaster of any description on PCC/stone surface/brick surfaces including raking out joints, hacking for key scrubbing down with water etc and removal of entire debris as ordered outside MoD land complete all as specified and as directed. |
| 2 | Demolition of brickwork/PCC block or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of entire debris as ordered outside MoD land complete all as specified and as directed. |
| 3 | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for in this Schedule and removal of entire debris as ordered outside MoD land complete all as directed. |
| 4 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for (reinforcement cut as required to faciliate demolition) including removal of entire debris as ordered outside MoD land complete all as specified and as directed. |
| 5 | Dismantling of wrought iron or mild steel work of any description and from any position not otherwise provided for in this Schedule (BOQ), complete all as specified and as directed. |
| 6 | Dismantling plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings and stacking at site where directed and removal of debris as ordered outside MoD land complete all as specified & as directed. |
| 7 | Dismantling of fencing wire mesh of any type and any size complete all as specified & as directed. |
| 8 | Dismantling of post or struts (wood, steel or RCC) any section, including taking out embedded portion in concrete and making good the disturbed ground complete all as specified and as directed. |
| 9 | Dismantling of stone slabs and tiles of any description or thickness in floors, aprons etc laid bedded and pointed in any mortar, including removal of entire debris as ordered outside MoD land complete all as directed. |
| 10 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), stacking serviceable tiles at site and removal of entire debris as ordered outside MoD land complete all as specified and as directed. |
| 11 | Taking down chowkat or frame with shutters (including fittings & fixtures) area not exc 1.5 Sqm each (without taking off the shutters from the frame) of door/window including cutting holes for taking out hold fasts and making good the same including disturbed portion of jambs, cills, etc complete all as specified and as directed. |
| 12 | Taking down chowkat or frame with shutters (including grills, fittings & fixtures) area exc 1.5 Sqm but not exc 4 Sqm each (without taking off the shutters from the frame) of door/window including cutting holes for taking out hold fasts and making good the same including disturbed portion of jambs, cills, etc complete all as specified and as directed. |
| 13 | Excavating in post holes (or similar holes) each not exc 0.50 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exc 25cm, watering, and removing surplus soil to a distance exceeding 500 m and making good surface in soft/ loose soil complete all as specified & as directed. |
| 14 | M&L for post construction Anti Termite Treatment of soil under existing floors using emulsion @ one litre per hole, 300mm apart including drilling and plugging 12mm dia holes with cement mortar 1:2 (1 cement: 2 coarse sand) to match the existing floors complete all as specified and as directed. |
| 15 | M&L for PCC 1:3:6, type C2 (using 40 mm graded crushed stone aggregate) as in foundations, filling and mass concrete complete all as specified & as directed. |
| 16 | M&L for cement concrete 1:2:4 type B0, using 12.5mm graded crushed stone aggregate as in roof kerbs, mud stops, coved fillets, cills, steps, copings, kneelers, apex stones, bed plates and the like including weathering, slightly rounded, chamfered angle and throating as directed including use and waste of form work (straight or curved) all exposed surface of concrete finished fair complete all as specified & as directed. |
| 17 | M&L for plain cement concrete 1:2:4 type B1 (using 20mm graded crushed stone aggregate) as in levelling course in floor, padding over roof and similar works, laid & compacted by maintaining gradient/ undulation to a minimum consolidated thickness of 25mm as directed, finished the surface fair & even, complete all as specified and as directed. |
| 18 | M&L for factory made pre cast cement concrete 1:3:6 type C1 (using 20 mm graded crushed stone aggregate) block masonry with solid blocks, exceeding 10 cm in width and setting in cement mortar 1:4 complete all as specified & as directed. |
| 19 | M&L for factory made pre cast cement concrete 1:3:6 type C1 (using 20 mm graded crushed stone aggregate) block masonry with solid blocks or slabs, 10 cm thick (with plain or interlocking joints as directed) and setting in cement mortar 1:4 in walls complete all as specified & as directed. Please Enable Macros to View BoQ information |
| 20 | M&L for factory made pre cast cement concrete 1:3:6 type C1 (using 20 mm graded crushed stone aggregate) block masonry with solid blocks or slabs, 10 cm thick (with plain or interlocking joints as directed) and setting in cement mortar 1:4 in walls complete all as specified & as directed. Please Enable Macros to View BoQ information |