|
| 1 | Hardware - Field Components |
| 2 | IP Outdoor 2MP PTZ Camera, min 30X optical 10 X digital Zoom (IP 66 housing, 24VAC/POE+, 128 GB SD Card, Surge Protection Devices, all type of Cables mounting bracket with Bird spikes and all required accessories). |
| 3 | IP Fixed 4MP HD Camera with IP 66 rated housing for outdoor use, 128 GB SD Card, Surge Protection devices, Mounting Bracket, Bird Spikes, all type of cables with all required accessories |
| 4 | Galvanized Iron (GI) Standard Poles for Surveillance Cameras and PA system (minimum height of 6.5 Meters) as per industrial standards and government norms / guidelines, 160Kmph wind speed bearing capacity, load bearing capacity of minimum 15KG with foundation, fasteners / bolts, (complete in all respects including rust protection, Paint, civil work and earthing, structural design and material composition test certificate) as per Solution requirement |
| 5 | IP Fixed BOX 2MP HD Box ANPR cameras with IP 66 rated housing, 128 GB SD Card, Surge Protection Devices, Mounting Brackets, Bird Spikes, all type of cables with all required accessories |
| 6 | Galvanized Iron (GI) Cantilever poles at traffic junctions for ANPR cameras and IR Illuminators (minimum height of pole 6.5 Meters) as per industrial standards and government norms / guidelines, for ground clearance of 6 meters, 160Kmph wind speed bearing capacity, load bearing capacity of minimum 15KG with foundation, fasteners / bolts, (complete in all respects including rust protection, Paint, civil work and earthing, structural design and material composition test certificate) as per Solution requirement |
| 7 | IP Fixed 2MP HD RLVD Camera with IP 66 rated housing for outdoor use, 128 GB SD Card, Surge Protection devices, Mounting Bracket, Bird Spikes, all type of cables with all required accessories |
| 8 | External IR Illuminators for ANPR cameras with all type of cables and all required accessories. Min. 80 meters or better, adjustable angle to cover the complete field of view at specified locations for higher accuracy in performance. Power 70 – 100 W |
| 9 | Industrial LPU with minimum Intel i7 Processor, 12th Generation or better for ANPR, RLVD, SVD & Traffic applications and Video Analytics (15 days SSD storage) with all type of cables and all required accessories |
| 10 | Speed Detection Device 4 lane including both LHS and RHS capable to detect speed more than 200 kmph, complete in all aspect including 4D Radar, ANPR (Global Shutter) camera, 128 GB SD Card, Surge Protection Devices, MCB, Earthing, Speed & ANPR Licenses, Mounting Structure (Gantry/Cantilever), Field Switch, LPU, IR illuminator, all type of cables etc. and all required accessories) as per solution requirement (As per FRS and TRS, Volume II B) |
| 11 | Speed Detection Device 6 lane including both LHS and RHS capable to detect speed more than 200 kmph, complete in all aspect including 4D Radar, ANPR (Global Shutter) camera, 128 GB SD Card, Surge Protection Devices, MCB, Earthing, Speed & ANPR Licenses, Mounting Structure (Gantry), Field Switch, LPU, IR illuminator, all type of all type of cables and all required accessories) as per solution requirement (As per FRS and TRS, Volume II B) |
| 12 | Adaptive Traffic Control System (ATCS) Traffic light Controllers with 32 cycle plan , minimum 20 cycle switch per day Junction Box and all Controller modules and accessories. All type of all type of Cables, and all required accessories as per Solution Requirement (As per FRS and TRS, Volume II B) |
| 13 | Optical / Thermal video-based Vehicle Detector devices for general surveillance and evidence/RLVD image capturing. The VTDS System at any point of time, shall provide different classification levels viz. 2-wheeler, 3-Wheeler/ Autorickshaws, e-rikshaw, SCV, LMV, HMV at any given point in time. All type of all type of Cables, and all required accessories as per Solution Requirement (As per FRS and TRS, Volume II B) |
| 14 | Traffic Light Aspects - Operating voltage voltage of ‐ 12 / 24 DC / 230VAC, high power SMD LEDs in ceramic package with silicone lens, IP65, Fresnel & Coloured Distribution Lens, Fuse and Transients shall be available, Turn Off/Turn On Time: 100 milli seconds max, Minimum Luminous Intensity (measured at intensity point)(cd): Red 400, Amber 400, Green 400, Protection for current voltages spikes for all the below mentioned colours of traffic light aspects, with all required accessories as per solution requirement (A15 to A19) (As per FRS and TRS, Volume II B) |
| 15 | Traffic Signal Aspects - Red |
| 16 | Traffic Signal Aspects - Amber |
| 17 | Traffic Signal Aspects - Green Arrow |
| 18 | Traffic Signal Aspects - Pedestrian Red |
| 19 | Traffic Signal Aspects - Pedestrian Green |
| 20 | Galvanized Iron (GI) single arm cantilever poles for (minimum height of 6.5 Meters) as per industrial standards and government norms / guidelines, for ground clearance of 6.5 meters, 160Kmph wind speed bearing capacity, load bearing capacity of minimum 25KG for traffic light aspects, Speed Detection Devices (4D Radar), ANPR cameras and IR Illuminators with foundation, fasteners / bolts, (complete in all respects including rust protection, Paint, civil work and earthing, structural design and material composition test certificate) as per Solution requirement |
| 21 | Galvanized Iron (GI) standard poles (minimum height of 4 meters) as per industrial standards and government norms / guidelines, 160Kmph wind speed bearing capacity, load bearing capacity of minimum 25KG for traffic light aspects with foundation, fasteners / bolts, (complete in all respects including rust protection, Paint, civil work and earthing, structural design and material composition test certificate) as per Solution requirement |
| 22 | Vehicular Adaptive Countdown Timer (ACDT) for ATCS Junctions, 320 x 320 mm (min), RGB panel to display Red, Green & Amber perfectly, 12/24V DC or 230V AC ~ 50Hz, viewing angle minimum Horizontal >160° Vertical >140°, IP 65, Shall be able to dynamically show timings by direct interfacing from the controller, with all required accessories as per solution requirement (As per FRS and TRS, Volume II B) |
| 23 | Pedestrian Count Down Timer for ATCS Junctions, 300mm (min), Dual Colored (Red & Green), 12/24V DC or 230V AC ~ 50Hz, viewing angle minimum 23° to 30° , IP 65, Shall be able to dynamically show timings by direct interfacing from the controller, with all required accessories as per solution requirement |
| 24 | Outdoor Variable Message Signboards / Displays Minimum size 2.8 m x 1.9m , Pixel Pitch 7 mm or better, Min 22000 pixels per sqm or higher, brightness- 5500 cd/m² or better, power consumption - 850 w/sqm or lower, 100 ~ 240 VAC power input, Front and rear IP65 Complete in all respects, including MCB, 6 KVA UPS for 30 mins backup, Surge Protection Devices, all type of Cables, Earthing, etc. with all required accessories as per solution requirement as per Solution Requirement. (As per FRS and TRS, Volume II B) |
| 25 | Mounting Structure for Variable Message Signboard / Display, Considering height clearance as per Government Guidelines, 160Km/hour wind speed bearing capacity, with foundation, fasteners / bolts (complete in all respects including paint, civil work and earthing, structural design and material composition test certificate) as per Solution Requirement Suitable for above mentioned Variable Messaging Signboard (Size 2.8 x 1.9 Mtrs) |
| 26 | Outdoor Variable Message Signboards / Displays Minimum size 3.8 m x 1.9m , Pixel Pitch 7 mm or better, Min 22000 pixels per sqm or higher, brightness- 5500 cd/m² or better, power consumption - 850 w/sqm or lower, 100 ~ 240 VAC power input, Front and rear IP65 Complete in all respects, including MCB, 8 KVA UPS for 30 min.s backup, Surge Protection Devices, Cables, Earthing, Field Switch, Junction box etc. as per Solution Requirement (As per FRS and TRS, Volume II B) |
| 27 | Mounting Structure for Variable Message Signboards / Displays, Considering height clearance as per Government Guidelines, 160Km/hour wind speed bearing capacity, with foundation, fasteners / bolts (complete in all respects including paint, civil work and earthing, structural design and material composition test certificate) as per Solution Requirement Suitable for above mentioned Variable Messaging Signboard (Size 3.8 x 1.9 Mtrs) |
| 28 | PA System for Public announcement system for outdoor use, Minimum 4 Speakers at each location with 30 W capacity each, 50Hz to 15000 Hz for Amplifier, IP amplifier with minimum 250 Watts, Class D. Redundant power supply provision inbuilt in Amplifier, Main power supply: 100 – 240 VAC, with Central Software based server application capable of working with 100% redundancy |
| 29 | Emergency call box (ECB), ethernet connectivity, IP66 / IP65, IK09 Protection, Speaking Distance minimum 5 ft, Inbuilt Amplifier, Minimum 3 Inputs ad 2 Output relay contacts, Call Button: Watertight, Push Button, Visual Feedback for button press and call indication with acoustic hood to filter background noise with its Application-Two way communication |
| 30 | Galvanized Iron (GI) Standard Pole for ECB (minimum height of 2.5 Meters) as per industrial standards and government norms / guidelines, 160Kmph wind speed bearing capacity, load bearing capacity of minimum 25KG with foundation, fasteners / bolts, (complete in all respects including rust protection, Paint, civil work and earthing, structural design and material composition test certificate) as per Solution requirement |
| 31 | Ground mountable Main Junction Box IP 55 Outdoor. Thickness ranges minimum 1.5mm, 15U rack or more as per site requirement with load bearing capacity of 40KG or more and one-fold door type. 3 point high quality locking system with compression manual Lock to accommodate Power Supply, UPS, Network Switch other field equipment with Earthing. (As per FRS and TRS, Volume II B) |
| 32 | Pole mountable Distribution Junction Box IP 55 Outdoor, Thickness ranges minimum 1.2mm, one-fold door type. 3 point high quality locking system with compression manual Lock to accommodate LPU, Switches etc. with Earthing. |
| 33 | Online UPS, Pure Sine wave IGBT based PWM Technology, output voltage 208 /200/ 220VAC /230VAC. BIS standard, CE Certified, ROHS Certified, Govt. of India EPR (E-Waste) certification. There shall be min 6 AMP x 3 Nos./ 5 AMP x 2 Nos./ Terminals as per OEM STD with 1 KVA load rating to provide 1 hour power backup to all the connected devices with Surge Protection, Earthing and required accessories. (As per FRS and TRS, Volume II B) |
| 34 | Online UPS, Pure Sine wave IGBT based PWM Technology, output voltage 208 /200/ 220VAC /230VAC. BIS standard, CE Certified, ROHS Certified, Govt. of India EPR (E-Waste) certification. There shall be min 6 AMP x 3 Nos./ 5 AMP x 2 Nos./ Terminals as per OEM STD with 1.5 KVA load rating to provide 1 hour power backup to all the connected devices with Surge Protection, Earthing and required accessories. (As per FRS and TRS, Volume II B) |
| 35 | Online UPS, Pure Sine wave IGBT based PWM Technology, output voltage 208 /200/ 220VAC /230VAC. BIS standard, CE Certified, ROHS Certified, Govt. of India EPR (E-Waste) certification. There shall be min 6 AMP x 3 Nos./ 5 AMP x 2 Nos./ Terminals as per OEM STD with 2.0 KVA load rating to provide 1 hour power backup to all the connected devices with Surge Protection, Earthing and required accessories. (As per FRS and TRS, Volume II B) |
| 36 | Edge level (Field) 24 Port (PoE) Industrial Grade Managed network switch with Power Supply, 24 X 10M/100M/1G RJ45 POE Port ,4 X 1G SFP Port , 1 X RJ45 console port, SFP and other accessories at each main junction Box as per Solution Requirement |
| 37 | Edge level (Field) 16 Port (PoE) Industrial Grade Managed network switch with Power Supply, 16 X 10M/100M/1G RJ45 POE Port , 2 X 1G SFP , 1 X RJ45 console port, SFP and other accessories at each main junction Box as per Solution Requirement |
| 38 | Edge level (Field) 8 Port (PoE) Industrial Grade Managed network switch with Power Supply, 8 x 10/100/1000Base‐T Ports POE + 2 x 1G SFP slot + 1 Console Ports, SFP and other accessories at each main junction Box as per Solution Requirement (As per FRS and TRS, Volume II B) |
| 39 | Edge level (Field) 4 Port (PoE) Industrial Grade Managed network switch with Power Supply, 4 x 10/100/1000Base‐T Ports POE + 2 SFP Slots + 1 Console Port, SFP and other accessories at each main junction Box as per Solution Requirement (As per FRS and TRS, Volume II B) |
| 40 | Cautionary, Warning and Informatory Road signages (Like U-turn Prohibited, Roundabout, Speed limit, No parking, traffic signal ahead, Pedestrian Crossing, under surveillance etc.) - Shape: Circular/ Triangular / Square, Background: White, Border: Red Symbol/Letter: As per government guidelines, Complete with Civil work with 3 mtrs of GI standard pole, wind bearing capacity of 160Kmph, Load bearing Capacity of 5Kg, Complete with rust protection, paint, fixtures in all respects |
| 41 | Workstation Desktop with 1 monitor, intel i7, min. 16 GB RAM, 8 GB Graphic Card including minimum 20 Meter HDMI/ DVI/ DP cables |
| 42 | Workstation Desktop with 4 monitor, intel i7, min. 16 GB RAM, 8 GB Graphic Card including minimum 20 Meter HDMI/ DVI/ DP cables (9 for SSP office, 3 for HO ) |
| 43 | 65\\" Smart LED Display / TV, Full HD with WiFi and Bluetooth for SSP office and HO) |
| 44 | 40\\" Smart LED Display / TV, Full HD with WiFi and Bluetooth for SSP office and HO) |
| 45 | UAVs, rotorcraft / VTOL fixed-wing drones for ariel surveillance (As per technical specification mentioned in Volume IIB) |
| 46 | Pink booth with civil work including following components1 no. 2 KVA Invertor with minimum 1 hour backup1 no. RO Water Filter with disposable glasses1 set of Medical First Aid Kit1 no. Discussion Table2 no. Discussion chair2 no.s. Storage / Wardrobe1 no. Notice Board1 no. White Board1 no. Work station with 1 monitor2 CCTV dome cameras with recording2 KVA UPS with 30 mins backup10 ltrs Room Cooler (water)2 no. Emergency Rechargeable Light for the booth with charger1. no. Handheld public Announcement System1 no. WiFi router1 Set Utensils (Plates, Glass, Cups, etc)Note: Clean closed space will be provided by Greater Noida with attached washroom |
| 47 | Mobile Command and Control Vehicle. (MCCV) including all the below components (2.01 to 2.27) - Please don't mention separate rates for below components |
| 48 | Mini Bus with Chassis: Wheel Base 3050 mm (approx.) from reputed OEM like TATA, Eicher, Ashok Leyland, Force motors etc. |
| 49 | Split Air Conditioner (1Ton) |
| 50 | Interiors design (as per the requirement)- for 1 Vehicle with external branding |
| 51 | Mobile Command and Control Vehicle. (MCCV) including all the below components (2.01 to 2.27) - Please don't mention separate rates for below components |
| 52 | Mini Bus with Chassis: Wheel Base 3050 mm (approx.) from reputed OEM like TATA, Eicher, Ashok Leyland, Force motors etc. |
| 53 | Split Air Conditioner (1Ton) |
| 54 | Interiors design (as per the requirement)- for 1 Vehicle with external branding |
| 55 | Seating Arrangement Tables and chairs for two Operator and small couch with shock & vibration isolators for stability and safety |
| 56 | Console with provision for monitor / display |
| 57 | Inter- communication Service Console |
| 58 | 19\\" Rack with shock & vibration isolators for electronic |
| 59 | Hydraulic Mast to mount PTZ Camera and Light (Min 4 Mtrs extended height from ground) |
| 60 | Vehicle mount IP Outdoor 2 MP PTZ Camera, minimum 30X optical 10 X digital Zoom (IP 66 housing, 24VAC/POE+, 128 GB SD Card, Surge Protection Devices, all type of Cables mounting bracket with Bird spikes and all required accessories) with keyboard and joystick |
| 61 | IP Fixed 4MP HD Bullet Camera with IP 66 rated housing for outdoor use, 128 GB SD Card, Surge Protection devices, Mounting Bracket, Bird Spikes, all type of cables with all required accessories |
| 62 | Medium Storage (Wooden Cupboard) |
| 63 | Industrial grade PC with 1 monitor support, intel i7, min. 16 GB RAM, 8 GB Graphic Card including minimum 3 Meter HDMI/ DVI/ DP cables and all accessories. With storage of 4 TB for camear recording. |
| 64 | 32 ”LED Full HD TV with fire stick for live TV footage |
| 65 | Modular true online UPS with adequate capacity 3KVA with 30 minutes backup 30 meter raw power inlet cable. |
| 66 | Min. 4.5 or above KVA Portable Inverter Generator set, Fuel type: Unleaded Petrol, salient design and Higher efficiency. Monitor equipped engine control panel display with Self-start feature. |
| 67 | Video Management Software with licenses for min. 3 cameras |
| 68 | 5G based 4 SIM Aggregator Device with SIM with recurring charges to be provided by GNIDA |
| 69 | Network Hardware Management GigE Switch |
| 70 | LED Flood Lights with 120-degree coverage (Mast Mounted) |
| 71 | Top Bar Light with Siren |
| 72 | Public Address System (PAS) with 2 vehicle mount outdoor Speakers |
| 73 | Min. 5Kg ABC powder Fire Extinguishers |
| 74 | Medical First-Aid Box |
| 75 | Mini drinking water dispenser for 20 litre bottle |
| 76 | Integration, Testing, Installation, Commissioning & Training |
| 77 | Interoperable Communication System with Operator Display, Pedal PTT, Speakers, PTT Desk Mic & Record-Replay features. 2 Base Station Radios and 2 SIM cards for this will be provided by GNIDA |
| 78 | 4G Aggregator/ Bonding Receiver with Unlimited bonding License |
| 79 | Hardware - ICCC Components |
| 80 | Workstation Desktop with 3 monitor, intel i7, min. 16 GB RAM, 8 GB Graphic Card including minimum 3 Meter HDMI/ DVI/ DP cables and all accessories |
| 81 | Workstation Desktop with 1 monitor, intel i7, min. 16 GB RAM, 8 GB Graphic Card including minimum 3 Meter HDMI/ DVI/ DP cables |
| 82 | LASER DLP based Rear Projection Video wall DLP Cubes of minimum 70” diagonal in a configuration. Resolution minimum full HD or better with controller, software and all accessories |
| 83 | Joystick to control PTZ Cameras with all all accessories |
| 84 | 48 Port Gigabit Switch for ICCC (As per FRS and TRS, Volume II B) |
| 85 | Minimum 2 ton Air conditioner for ICCC (Approx 5000 Sq. Ft. area) |
| 86 | ICCC interior, Furniture & fixtures including 1 reception, 1 visitor room, 2 meeting rooms,1 viewing gallery construction, complete civil, interior work and furniture (tables, chairs, cubicle, storage racks, separator etc), Electrical Lightning and Fitting (Approx. 3000 Sq. Ft area) considering 30 staff for monitoring, 10 person meeting / war rooms, 6 person visiting room, 10 Person Viewing gallery and single person reception area with all other utilities and fixtures like Signages (Fire, Entry - Exit, Utilities etc) |
| 87 | Hardware - Data Center Components |
| 88 | 48 Port Core Switch in High Availability (HA) Mode (As per FRS and TRS, Volume II B) |
| 89 | Internet Router in High Availability (HA) Mode (As per FRS and TRS, Volume II B) |
| 90 | 48 Port Aggregation Switch in High Availability (HA) Mode (As per FRS and TRS, Volume II B) |
| 91 | Networking Racks (42U) as per Solution Requirement (As per FRS and TRS, Volume II B) |
| 92 | Networking Racks (12U) as per Solution Requirement (As per FRS and TRS, Volume II B) |
| 93 | KVM Switch with Display/ Manageable 24 Port Switch |
| 94 | Network and Cyber Security Audit (Every year) for 5 years |
| 95 | Servers Required for all the Applications and software including but not limited to Database, Video Management System, Video Analytics, ISTMS System (ANPR, RLVD, SVD, Traffic Video Analytics), RLVD, ATCS, ISTMS, Speed Detection, e-Challan, Variable Message Signboard, Database Server, FRS server with GPU, EMS Server, Web Server, Virtualisation Server |
| 96 | 48 port Gigabit, Layer 3 Switch in HA Mode (As per FRS and TRS, Volume II B) |
| 97 | 24 Port L2 TOR Switch in HA Mode (As per FRS and TRS, Volume II B) |
| 98 | 48 Port L2 TOR Switch in HA Mode (As per FRS and TRS, Volume II B) |
| 99 | 24 port Gigabit, Layer 2 Switch (As per FRS and TRS, Volume II B) |
| 100 | 48 port Gigabit, Layer 2 Switch (As per FRS and TRS, Volume II B) |
| 101 | Antivirus, Syslog & EMS Server (As per FRS and TRS, Volume II B) |
| 102 | SAN RAID 5 for Virtualisation and database |
| 103 | NAS for Video and log Storage, RAID 5 or better for 90 days of video and alarm data for 1300 Cameras at 25FPS, 1080p resolution |
| 104 | Backup Appliance (D2D) along with Backup solution for 90 days and Logged / Flagged data for 180 days for 1300 Cameras at 25FPS, 1080p resolution |
| 105 | Precision Air Conditioning for minimum 9 racks in Data Centre |
| 106 | Miscellaneous Components (Common for ICCC and Data Center) |
| 107 | 2MP day and night Dome cameras with 128 GB SD Card for internal surveillance in ICCC and Data Center |
| 108 | Network Video Recorder (NVR) with storage for 30 days, rack mount with all accessories for 10 dome cameras |
| 109 | Biometric (Finger print based) + Smart Card based for time and attendance, Access control system minimum 200 users for ICCC and DC Area for all the doors (50 no.s Smart Cards, Controller, readers, locks with software and all accessories) |
| 110 | 55\\" Smart LED Display / TV, Full HD with WiFi and Bluetooth for 2 war room, reception, cafeteria, visitor gallery, 2 meeting rooms |
| 111 | IP based Unified Communication Solution with 20. no.s of High-End IP Phones (desktop type) for ICCC helpdesk, receptionist, office administrators, operators and other staff. With intuitive 4 inch or bigger color-screen LCD notification display, modern design, with rich functionalities, integrated PoE, complete with all accessories |
| 112 | PA System dialling console with licenses with integration for ICCC area |
| 113 | Modular true online UPS with adequate capacity minimum 250 KVA with 30 minutes backup (1+1 Redundancy) for ICCC and Data Center equipment. |
| 114 | Water proofing and Water Leak detection(WLD) system for Data Centre (400 Sq. Ft.), UPS Room (100 Sq. Ft.) and ICCC (3000 Sq. Ft.) |
| 115 | Rodent Prevention and control for ICCC and Data Centre |
| 116 | Heavy duty Color Laser Printer (All in one Printer , scanner, copier) compatible with WiFi, PC, Desktop and mobile devices with all accessories |
| 117 | Software and applications |
| 118 | ICCC Software |
| 119 | ITMS Application Software |
| 120 | Video Management Software |
| 121 | Video Management Licenses with failover |
| 122 | Facial Recognition Software with Base License and Channel License |
| 123 | Mobile app. (Android and iOS platform) for citizens and Staff in the single app. |
| 124 | VA (Video Analytics) licenses - Citizen Safety |
| 125 | Video Analytics Software- Citizen Safety Use cases |
| 126 | Crowd Detection and estimation |
| 127 | Person Collapse detection |
| 128 | Object abandoned detection |
| 129 | Person Fighting detection |
| 130 | Animal / Person detection |
| 131 | Vandalism detection |
| 132 | Loitering detection |
| 133 | Fire Detection |
| 134 | VA (Video Analytics) licenses - Traffic Management |
| 135 | ANPR per camera licenses |
| 136 | Red light violation software |
| 137 | Red light violation License |
| 138 | eChallan software (integrated with Vahan database of NIC) |
| 139 | Accident and Incident Reporting system (AIRS) for 15 mobile client licences |
| 140 | Video Summarization Software for video synopsis for 50 online and 50 off line licenses with 5 concurrent users |
| 141 | No Parking violation detection License |
| 142 | Triple riding violation detection License |
| 143 | No Helmet violation detection License |
| 144 | No Seat belt detection |
| 145 | Wrong Direction Driving violation detection License |
| 146 | Variable message signboard software |
| 147 | Public announcement system Software |
| 148 | ATCS Software including Simulation Model |
| 149 | ATCS controller License |
| 150 | VTDS / ATCC Software Central Application (As per BoQ) |
| 151 | Integration with RTO DB and other interfaces |
| 152 | Other Software |
| 153 | Server Virtualization Software (As per BoQ) |
| 154 | Server OS (As per BoQ) |
| 155 | Application/ Appliance for Anti-Virus, Internet firewall, SIEM , WAF, DDoS etc as per cyber security section, mentioned in RFP.(VAPT should be done at the time of UAT) |
| 156 | DB Software (As per BoQ) |
| 157 | Enterprise Management System (EMS / NMS) with Helpdesk, SLA, Asset, Report Management |
| 158 | Unified platform for database integration with customized business Intelligence (BI) |
| 159 | GIS MAP base software with required licenses for Geo Spatial application |
| 160 | Manpower - Operations and maintenance phase (60 Months) This is minimum Manpower, however MSI shall provide the adequate manpower for Project O&M support |
| 161 | Project Director No. of man months and availability at site as per RFP requirement and project completion time lines. |
| 162 | Project Director No. of man months and availability at site as per RFP requirement and project completion time lines. |
| 163 | System and NW Administrator for Data Centre No. of man months and availability at site as per RFP requirement and project completion time lines. |
| 164 | System and NW Administrator for Data Centre No. of man months and availability at site as per RFP requirement and project completion time lines. |
| 165 | System and NW Administrator for Data Centre No. of man months and availability at site as per RFP requirement and project completion time lines. |
| 166 | Field and data center Networking / Bandwidth |
| 167 | Dedicated optical fiber networking for all field devices at all locations and datacentre with required bandwidth (including supply, digging, trenching, laying and maintenance for 5 years) as per above mentioned device quantities in all respects to make the solution complete including PoP locations for network distributionNote: Closed rooms for PoP will be provided by GNIDA however interiors, and IT equipment shall be provided by the bidder with required hardware, software, other passive components, power backup and HVAC), Measurement will be based on digging length. Pre laying of OFC, IA to ensure physical survey using GPR (Ground Penetration Radar) to ensure non-destructive detection of utilities to identify underlying features or buried services and detailed report to be submitted in both soft and hardcopy to the Authority) |
| 168 | Labour Cess and GST will be paid extra as per govt. orders Please Enable Macros to View BoQ information |