| 1 | SH:C/o RCC Retaining Wall. |
| 2 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. |
| 3 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering.a) Foundation and plinth |
| 4 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size |
| 5 | Reinforced cement concrete in retaining wall (any thickness) including attached pillasters, buttresses, plinth and string courses, fillets etc from top of foundation up to floor two level excluding cost of centring,shuttering and reinforcement in :a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 6 | Reinforcement of RCC work including bending, binding and placing in position complete.Tar/ TMT steel |
| 7 | Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete. |
| 8 | b) Walls(any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 9 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification i) Granular material |
| 10 | Carriage of Materials |
| 11 | SH: Dismantling of Old Parking Shade & Carriage of Debris |
| 12 | Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) |
| 13 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000metres) |
| 14 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) |
| 15 | Removal of Telephone / Electric Poles and Lines (Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately) |
| 16 | Demolishing RCC Work including stacking of steel bars and disposal of un-serviceable materials within 50 metres lead |
| 17 | Extra for cutting reinforcement bars in RCC or RB work. |
| 18 | Demolishing brick work in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 19 | Dismantling dry brick pitching in floors, drains etc including stacking of serviceable materialand disposal of unserviceable material within 50 m lead. |
| 20 | Dismantling CI or asbestos, rain water pipes with fittings and clamps including stacking thea) 75 mm dia pipe |
| 21 | b) 100 mm dia pipe |
| 22 | Carriage Charges |
| 23 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) |
| 24 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) Please Enable Macros to View BoQ information |