| 1 | Dismantling to concrete masonry work including stacking the useful materials for reuse and removing the debris within all leads and lifts as directed by the Engineer in-charge. |
| 2 | Dismantling brick or stone masonry in lime or cement mortar under 3M height including stacking the useful materials for reuse and removing the debris within all leads and lifts as directed by the Engineer in-charge |
| 3 | Excavation of foundation to proper profile in all kinds of soil with all leads and lifts including dressing and leveling the bed to proper slope and level and making it fit for laying concrete including depositing the excavated materials clear of work site with all leads and lifts etc. including dewatering from foundation if required etc. with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer-in-charge. |
| 4 | Filling in foundation and plinth with coarse sand of approved quality to all depth and with all leads and lift including watering and ramming including cost, conveyance, royalty and other taxes of all materials with making arrangement for carriage of water etc. complete as directed by the Engineer in-charge. |
| 5 | Cement concrete M-15 grade 20mm down graded crusher broken hard granite aggregate of approved quality from approved quarry free from weathered skin quarry rubbish and foreign materials mixing by concrete mixer including ;lifting the materials hoisting, lowering and laying the concrete to required level with all leads and lifts compacting in layers of 0.15M thick with vibrators ramming finishing to proper slope and level, finishing the exposed surface smooth including watering curing for required period etc.including cost, conveyance ;royalty and other taxes of all materials labour T&P materials required for this item including hire running charges of the machineries .complete as directed by the Engineer-in-charge |
| 6 | Cement concrete M-20 grade 20mm down graded crusher broken hard granite aggregate of approved quality from approved quarry free from weathered skin quarry rubbish and foreign materials mixing by concrete mixer including ;lifting the materials hoisting, lowering and laying the concrete to required level with all leads and lifts compacting in layers of 0.15M thick with vibrators ramming finishing to proper slope and level, finishing the exposed surface smooth including watering curing for required period etc.including cost, conveyance ;royalty and other taxes of all materials labour T&P materials required for this item including hire running charges of the machineries .complete as directed by the Engineer-in-charge |
| 7 | Straighteing cuttting bending of steel reinforcement and tying the grills as per approved design & drawing and placing in position including cost conveyance royalties and others taxes of MS Rods m binding wires of 18 t 20 gauge with supply of all labour and T&P required for the work etc complete in all respect as directed by the EIC ( Weight of the binding wire is not included in the calcuiatin for payment) |
| 8 | Providing rigid smooth centering and shuttering for R.C.C. work to all heights including false work and dismantling then after casting and curing for required time including depositing the debrices clear of work site with all leads and lifts etc.complete with all cost, conveyance, royalty and other taxes of all materials as directed by the Engineer-in-charge. |
| 9 | Providing weep holes in reinforced concrete abutment, wing wall, return wall with 100 mm dia. AC pipe, extending through the full width of the structure with slope of IV:20H towards drawing foce.etc. as per drawing and design etc including all cost, conveyance complete. |
| 10 | Excavation of approved type soil from borrow area by mechanical means loading in to the transportion by mechanical means and unloading the soil with in 1 km lead on propoerly prepared and scintifically approved surface including spreading and levelling the earth in 22.5 cm layer to make ready for watering and compaction in dam and dyke for all height including construction , maintainace , watering and lighting of haul road and borrow area etc complete as per the specification and as per direction of EIC with in an initial lead 1 KM from the place of excavation complete. |
| 11 | Rough stone Dry packing in aprons and slope and revetments to all heights with a departmental hard stones of 30cm and above size (weighing 75 kg and above of approved quality quarried and free from weathered skins and of approved quality including filling the interstices with small stones and finishing to proper slope and level with cost,conveyance,royalty and other taxes of all materials required for the work etc. complete as directed by the Engineer-in-charge |
| 12 | Rough stone Dry packing in aprons and slope and revetments to all heights with a hard stones of 30cm and above size (weighing 75 kg and above of approved quality quarried and free from weathered skins and of approved quality including filling the interstices with small stones and finishing to proper slope and level with cost,conveyance,royalty and other taxes of all materials required for the work etc. complete as directed by the Engineer-in-charge |
| 13 | Filling of Foundation with the excavated earth with all leads and lifts delfts including watering and ramming in layers complete in all respect etc completed as directed by the Engineer in Charge. Please Enable Macros to View BoQ information |