| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
| 2 | Providing, Supplying, Lowering, Laying, Jointing, testing and Commissioning of PE-100 and PN-10 HDPE Pipes in standard lengths confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing material and all kinds of pipe specials including Transportation, Freight charges, Inspection charges, Loading, Un-Loading charges, jointing procedure as per relevant IS code (if applicable) complete with materials for jointing procedure with all labours and including making necessary connections where ever required as directed by Engineer in Charge as per IS 7634- Part-II, (including cost of all materials Labour and Water) for specified lengths inclusive of all kinds of taxes and carriage complete. HDPE Pipe PE-100, PN-10- 140mm dia |
| 3 | 200mm dia |
| 4 | 315mm dia |
| 5 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 6 | Dumping stone excluding cost of stones. |
| 7 | In Horizontal on level |
| 8 | On Slopes (Behind pitching) |
| 9 | Opening out old wire crates those and re-binding after filling. |
| 10 | Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%) |
| 11 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 12 | loading/unloading sand/earth filled bags in lorries lead upto 50 Mtr |
| 13 | Unloading sand/earth filled bags from boats |
| 14 | Placing in dry |
| 15 | Placing in Water |
| 16 | Engagement of Labourer (Skilled) |
| 17 | Engagement of Labourer (Unskilled) |
| 18 | Engagement of Cutting Saw Machine Including POL and Operator(Complete) |
| 19 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) |
| 20 | Suuplying and Stacking of Stone Dust at Site Including Royality(Complete) |
| 21 | Engagement of JCB including POL and driver complete for variou canal operations including removal of encroachments |
| 22 | Idle Chrages |
| 23 | Engagement of Poclain/L&T-110/70/60(Chain Driven ) Including POL and driver Complete. |
| 24 | Idle Chrages |
| 25 | Spreading, laying and fixing of LDP/HDP to check/stop the leakages of canals including the fixing/locking arrangements by any means through the entire length/breadth as per the requirement at site of work and as desired by Engineer Incharge. Complete in all respects. |
| 26 | Providing wood work in frames of false ceiling, partitions, flumes etc, sawn and fixed in position including all sorts of carriages and other incidentals /accessories etc (Complete Job). Poplar Wood |
| 27 | Providing and fixing 0. 50mm thick (zinc coating not less than 275gm's/Sqm), Plane G.S. Sheets over wooden frames for flumes incuding curved, vertical surfaces fixed with G.I. limpet washers, nails and other accessories. excluding the cost of wood work but including cutting to size and shape weherever required including all sorts of carriages as per the directions of the Engineer-In-Charge Complete Job in all respects. |
| 28 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 29 | FORM WORKCentering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 30 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded |
| 31 | Engagement of Contract Carrier for carriage of material within jurisdiction including Driver and (POL) if and when needed Upto an average lead of 20Km's Journey or a part thereof. (Complete)a) Tata Mobile Having a load carrying capacity of 1MT. |
| 32 | For additional Lead of every Km beyond 20Km Lead |
| 33 | Providing refreshment to supervisory staff for restoration of water during night /day or the participants of the Independence Day , Republic day or other official Functions complete job including packing at venue with following Menu : |
| 34 | Water Bottle One litre. |
| 35 | Boiled Egg. |
| 36 | Dal 50 g Pack. |
| 37 | Banana. |
| 38 | Tea Sugar each Cup. |
| 39 | Tea Namkeen each Cup. |
| 40 | Butter Toast |
| 41 | Bread Slice |
| 42 | Normal Chicken Biryani |
| 43 | Veg Fried Rice/Biryani Veg |
| 44 | Chicken Kanti With Naan |
| 45 | Mutton Kanti With Naan |
| 46 | Normal Mutton Kabab |
| 47 | Plain Rice Plate |
| 48 | Mutton (Rogan josh)/Rista/Gustaba etc. |
| 49 | Carriage of material from Approved Source up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport |
| 50 | Crates for an avg. lead upto 01 Kms |
| 51 | Crates for an avg. lead upto 02 Kms |
| 52 | Crates for an avg. lead upto 03 Kms |
| 53 | Crates for an avg. lead upto 04 Kms |
| 54 | Crates for an avg. lead upto 05 Kms |
| 55 | Crates for an avg. lead beyond 5 Kms upto 10 Kms (per Km) |
| 56 | Crates from an avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 57 | Crates from an avg. lead beyond 20 Kms per additional Km |
| 58 | Sand/20mm Agg/Stone Dust for an average lead of upto 01 Kms |
| 59 | Sand/20mm Agg/Stone Dust for an average lead upto 02 Kms |
| 60 | Sand/20mm Agg/Stone Dust for an average lead upto 03 Kms |
| 61 | Sand/20mm Agg/Stone Dust for an average lead upto 04 Kms |
| 62 | Sand/20mm Agg/Stone Dust for an average lead upto 05 Kms |
| 63 | Sand/20mm Agg/Stone Dust for an average lead beyond 5 Kms upto 10 Kms (per Km) |
| 64 | Sand/20mm Agg/Stone Dust for an average lead beyond 10 Kms upto 20 Kms (per Km) |
| 65 | Sand/20mm Agg/Stone Dust for an average lead beyond 20 Kms per additional Km |
| 66 | Earth for an avg. lead of upto 01 Kms |
| 67 | Earth for an avg. lead upto 02 Kms |
| 68 | Earth for an avg. lead upto 03 Kms |
| 69 | Earth for an avg. lead upto 04 Kms |
| 70 | Earth for an avg. lead upto 05 Kms |
| 71 | Earth for an avg. lead beyond 5 Kms upto 10 Kms (per Km) |
| 72 | Earth for an avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 73 | Earth for an avg. lead beyond 20 Kms per additional Km |
| 74 | Empty Cement Bags for an avg. lead of upto 01 Kms |
| 75 | Empty Cement Bags for an avg. lead upto 02 Kms |
| 76 | Empty Cement Bags for an avg. lead upto 03 Kms |
| 77 | Empty Cement Bags for an avg. lead upto 04 Kms |
| 78 | Empty Cement Bags for an avg. lead upto 05 Kms |
| 79 | Empty Cement Bags for an avg. lead beyond 5 Kms upto 10 Kms (per Km) |
| 80 | Empty Cement Bags for an avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 81 | Empty Cement Bags for an avg. lead beyond 20 Kms per additional Km |
| 82 | Stone avg. lead of upto 1 Km |
| 83 | Stone avg. lead upto 2 Kms |
| 84 | Stone avg. lead upto 3 Kms |
| 85 | Stone avg. lead upto 4 Kms |
| 86 | Stone avg. lead upto 5 Kms |
| 87 | Stone avg. lead beyond 05 Kms upto 10 Kms (per Km) |
| 88 | Stone avg. lead beyond 10 Kms upto 20 Kms (per Km) |
| 89 | Stone avg. lead beyond 20 Kms per additional Km |
| 90 | Extra Carriage of material from dumping site to actual site of work, including loading, unloading and stacking etc. complete by manual labour |
| 91 | Cement for an avg. lead upto 50 mtr. |
| 92 | Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 93 | Steel for an average lead upto 50Mtr |
| 94 | Steel for an every additionaal lead of 50Mtrs or part thereof beyond 1st 50Mtrs |
| 95 | Stones for an avg. lead upto 50 mtr. |
| 96 | stones for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 97 | Sand/20mm Agg/Stone Dust for an average lead upto 50Mtr |
| 98 | Sand/20mm Agg/Stone Dust for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 99 | Earth for an average lead upto 50Mtrs |
| 100 | Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 101 | Empty Cement bags for an average lead upto 50Mtrs |
| 102 | Empty Cement bags for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 103 | Crates for an average lead upto 50Mtrs |
| 104 | Crates for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs. |
| 105 | Providing and fixing of Sign boards/ Flex banners of required size as per the directions of Engineer In-charge attached with light wieght square section Mild steel frame including all sorts of carraige complete. Please Enable Macros to View BoQ information |