|
| 1 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.60 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M 4.2.1 distance as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine con not reach/move) SOR-20/253(A) |
| 2 | Cartage of earth or fly ash when added to schedule item no. 253. |
| 3 | IInd Km and beyond. SOR-20/261(c) /4.08 |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine con not reach/move). For Building work only (SOR-251a) |
| 5 | Depth from 0.00 to 1.50M below. |
| 6 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12mm mud mortar including filing joints with jamuna sand with common burnt clay non-modulor bricks. DSR-18/11.2 AR |
| 7 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-281) |
| 8 | Providing and laying 80mm Thick ISI mark factory made Cement Concrete interlocking paver block made by block making machine with strong vibratroy compaction of approved size, design, shape, laid in required coloured of M-40 & pattern over and including averege 50mm Thick Compacted bed fine sand and filling the joints with fine sand all complete as per direction of engineer-in-charge with conforming to ISI - 15658 & IRC : SP : 63 DSR-18/16.68/GNIDA A.R. |
| 9 | M-150 Brick Work in 1:4 cement & Coarse sand 2.2 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. SOR-305a |
| 10 | M-150 Brick Work in 1:4 cement & Coarse sand 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work.SOR-20/305(A) |
| 11 | As in item 303 to 307 above but in superstructure including necessary Cutting & moulding of brick as required thickness of walls not to be less than 1% brick. Add extra labour to above items.SOR-20/309 |
| 12 | As in item 309 above but for walls of one brick thick, add for extra labour to the rate of item no. 309.SOR-20/310 |
| 13 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant transit mixer & manual placing . |
| 14 | MORTH-9.06 E/Case-II |
| 15 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump. For T-beam & slab, Height upto 5m |
| 16 | MORTH-14.01 B Case-II (ii) (p) |
| 17 | 12mm cement plaster of mix 1:6 (1cement:6 corse sand) DSR-18/13.4.2 AR |
| 18 | Cement Concrete with 2 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |
| 19 | SOR-279a |
| 20 | Plain/ Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M25 using batching plant transit mixer & manual placing . |
| 21 | MORTH-9.06 D/Case-II |
| 22 | Finishing wall with water proof cement paint of approved make and quality on new wood with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. |
| 23 | SOR-660 |
| 24 | Steel work welded in built up sections/framed work including cutting, hoisting, fixing inposition and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 25 | In gratings,frames,guard bar, ladder, raillings, brackets,gates and similar works.DSR-18/10.25.2 AR |
| 26 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: |
| 27 | Two or more coats on new work DSR-18/13.61.1 AR |
| 28 | Providing corrugated G.S.sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.l. limpet washers or with G.l. impet washers filled with white lead and including a coat of approved steel primer and two coats of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surfaces) excluding the cost of purlins, raffers and trusses and including cutting to size and shape wherever required. |
| 29 | 1.00mm thick with zinc coating not less than 275gm/Sqm DSR-18/12.1.1/P-204 |
| 30 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all coomplete. |
| 31 | Thermo mechanically Treated bars of grade Fe-500D or more. DSR-18/5.22.6AR (SAIL - JULY) |
| 32 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. DSR -2018/15.3 |
| 33 | Labour Cess andGST will be paid extra as per govt. orders Please Enable Macros to View BoQ information |