| 1 | Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 2 | S.T. Pole 11 mtr long |
| 3 | Other loose line materials with including conductor, Single and double Pole accessories, complete stay & earthing, insulator, diff. Channel & Angle, distribution box, x-arm, etc. from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
| 4 | ACSR Weasel Conductor |
| 5 | 11 KV XLPE Cable of size 3x70 sqmm |
| 6 | I/D & O/D Cable Jointing kit 3x70 sqmm |
| 7 | Dismantling of existing old Pole and X-arms, brackets, Insulators, Channels and all hardware fittings. |
| 8 | Fabrication/Modification of MS Items/Nuts & Bolts as requirement of site condition |
| 9 | Erection of ST double pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 10 | Supply & Fixing of following materials for above job- |
| 11 | Clamp for Top and Dropper channel with N&B |
| 12 | Grouting of ST Pole as per RESPO Norms with grouting materials. |
| 13 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 14 | Supply & Fixing of following materials for above job- |
| 15 | Stay Clamp with N&B |
| 16 | Stay Insulator |
| 17 | Laying stringing and sagging of O/H 11 KV Line Three Phase by Conductor including all associated work with joint/jumpers and binding of insulator as required. |
| 18 | Laying of 11 KV XLPE Cable of size 3x70 sqmm with sand and bricks as per RESPO Norms. |
| 19 | Fixing of cable jointing kit of diff. size |
| 20 | 11 KV Cable Hosting including jumpering etc. complete work with help of G.I. Pipe as per RESPO Norms (G.I. Pipe and other required material shall be provided by the contractor) |
| 21 | Opening of H.V./L.V. connections on existing 250 KVA Transformer and Dismantling of Transformer by hydra from existing damaged Plinth with Safe Carriage along with loading unloading and propoer stocking. |
| 22 | Fixing of 11 KV D.O. Fuse Set at Double Pole with D.O. Fuse mounting Channel, clamps and nut & bolts including all associated work. |
| 23 | Supply & Fixing of following materials for above job- |
| 24 | 11 KV D.O. Fuse Set |
| 25 | D.O. Fuse mounting Channel |
| 26 | Clamp for mounting Channel with N&B |
| 27 | Construction of masonry type T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.5 mtr x 1.5 mtr x 1.5 mtr (LxBxH) solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth as per RESPO norms. (All the material will be arranged by the contractor) |
| 28 | Placement of 250 KVA T/F by hydra on newly repaired T/Fs Plinth with installation and commissioning of T/F. All the jumpering & connection with the system are included in the scope of work. |
| 29 | Earthing of Neutral of Transformer & Transformer body by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 40 ft. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X5 mm. from the cone to the ground surface where it will be connected with G.I. pipe clamp from which Transformer neutral & Body connection being done by G.I. Strip as per RESPO norms . (All the material will be arranged by the contractor) |
| 30 | Supply & Fixing of Henley Type Tailless Unit Protection Cubical Panel 500 A, 650 V for 250 KVA DT including all associated work as per RESPO Norms. (All the material will be arranged by the contractor) |
| 31 | Fabrication and erection of Distribution Transformer fencing around Transformer and L.T. Distribution Pillar Box with 01 nos. gate & locking arrangement including cost of M.S. Angle size 40x40x5 and M.S. Flat size 25x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint in iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust as per RESPO norms. (All the material will be arranged by the contractor) |
| 32 | NOTE:-1. All the material provided by contractor shall be as per norms of UPPCL/RESPO. 2. One carriage including loading/unloading from dump site to pit site is included in scope of work. 3. During execution of work all risk will be of the contractor. 4. Contractor will provide all T & P, vehicle and man power. 5. All the old and used material should be taken on book. 6. The quantity may be vary ±20%. Please Enable Macros to View BoQ information |