|
| 1 | Jungle Clearance including weeding out shrubs and small trees up to 150mm dia and their removal as per specification and direction of E/I. 5.1.3.2 |
| 2 | Labour Charge for taking out disturbed boulder pitching or rip-rap or rock toe etc. and cleaning the surface and stacking the same within a lead of 100 M as per specification and direction of E/I. 7.7.41 |
| 3 | Earth work in stripping in all kinds of soils including moorum soil, soil mixed with kankar , pebbles and boulder upto 300 mm size and disposal of same along with organic materials (beyond 50 m away from he toe of the dam base in the country side 0 within initial lead of 150 m and all lifts as per specification and direction of engineer incharge 5.1.5 |
| 4 | E/W in excavation and filling in canal by hydraullic excavator as per designed section in ordinary soil (vide classification of soil type-A) and making the banks with excavated earth in proper profile and clod breaking and layong earth in 225mm layers with initial lead of 10m and all lifts all complete as per the specification and direction of E/I. 7.1.43.3 |
| 5 | E/W in excavation in canal by hydraullic excavator as per designed section in all kinds of soil,soil mixed with kankar,pebble and boulders upto 300 mm size and disposal of spoil upto 500mm with all lifts by tipper including construction and maintainance of haull road all complete as per specification and direction of E/I. 7.1.43.2 |
| 6 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the costs of material, royalty all taxes etc. but excluding the cost of carriage all complete as per the specification and direction of E/I. 5.6.4 |
| 7 | Labour charge for pitching with stone boulders duly packed in slope and apron with materials within 150m of work site and all lifts all complete as per the specification and direction of E/I. 6.6.6 |
| 8 | Dewatering of reservoir by 5HP Diesel Pump Set. |
| 9 | Earth work in Excavation of Foundation .. do-do...E/I (6.1.8) |
| 10 | Providing sand filling in foundation ..do..do..E/I. (5.1.10 BCD JH) |
| 11 | providing brick flat soling in foundation …do…do…E/I.(5.6.1). |
| 12 | Providing PCC or RCC M15 (1:2:4)…d0..do..E/I. (5.3.6) |
| 13 | Providing brick masonary with C.M (1:4) …do…do…E/I. (5.2.10) |
| 14 | Provide 12 MM thick cement plaster (1:4) …do…do..E/I.(5.7.2) |
| 15 | Centuring and shuttering including struting, proping etc and removal of form for foundation , footing , bases of columns etc for mass concrete as per specification and direction of E/i BCD item No-5.3.17.1 page no-108 |
| 16 | Centuring and shuttering including struting, proping etc and removal of form for lintel ,beams , plinth beams , girders , bressumers , and cantilevers as per specification and direction of E/i BCD item No-5.3.17.5 page no-108 |
| 17 | Providing 1.5 MM cement punning …do…do…E/I. (5.7.11) |
| 18 | Providing 25 mm thick CP (1:4)..do..do…E/I |
| 19 | Dismentling of old plaster and pointing ....do....do...E/I BCD (5.10.7) |
| 20 | Carriage of materials Boulders |
| 21 | Cement |
| 22 | Chips |
| 23 | Brick |
| 24 | Provision of GST @ 18% |
| 25 | Add 1% Labour Cess Please Enable Macros to View BoQ information ` |