| 1 | Dismantling of ceramic tiles or vitrified and plaster to making the surface clean for refixing the glazed tiles including removing of malba complete in all respect and to the entire satisfaction of the Engineer in charge. |
| 2 | Providing and laying double charged vitrified floor tiles of size 600 x 1200 mm (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved brand & manufacturer, in all colours and shade. The tiles are to be fixed with 3mm grove using spacers. The tiles are to be laid on 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3kg/sqm The grove are to be filled with cementitious grout mix with proportion of 0.90 kg grout and 0.10 kg of hardener for each kg of filling material. |
| 3 | Providing and laying vitrified floor tiles of specified size (thickness to be specified by the manufacturer) of 1st quality with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm single charge |
| 4 | Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix of 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg), including filling I grouting and finishing complete as per direction of Engineer-in-charge. Size of Tile 600x600 mm |
| 5 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixingin position and applying a priming coat of approved steel primer all complete. |
| 7 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) |
| 8 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound )content less than 50 gram/ litre, of approved brand and of required said and colour complete to give and even said. Old work (one or more coats) |
| 9 | Wall painting with prernium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound )content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.One coats |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work |
| 11 | French spirit polishing : One or more coats on old work |
| 12 | Finishing walls with Acrylic Smooth exterior paint of required shade Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 13 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 14 | Providing and applying cement based putty (Birla, Jk or equivalent) to the required finish complete in all respect and to the entire satisfaction of Engineer-in-charge. Please Enable Macros to View BoQ information |