| 1 | Earth Excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of Engineer. |
| 2 | Supply fillimg sand in F & P including cost, conveyance & royalty od sand cost of all labour cess, Watering, raming etc |
| 3 | Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete |
| 4 | Cement Concrete (1:2:4) using 12mm size B.H.G. (C. B.) Chips including cost, conveyance , royalty & taxes of all materials etc. complete |
| 5 | Brick work with Fly Ash Brick having crossing Strength between 100kg/cm2 to149kg/cm2 in C.M.( 1:6) in foundation and plinth |
| 6 | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification |
| 7 | 12mm. thick cement plastering (1:6) |
| 8 | Cement punning incuding cost of all complete and finished. |
| 9 | Providing and laying 80 mm thick factory made cementconcrete interlocking paver block of M.40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per thedirection of Engineer-in-charge. |
| 10 | Fixing Tiles in Floor, treads or steps on 25mm thick bedof C.M.(1:1) jointed with neat cement slurry mixed with pigment to |match the shades of the tile including rubbing & polishing including cost of precast tiles. |
| 11 | Painting two coats to wall surface with Weather paint of approved shade to give an even surfaceincluding cost Conveyance etc |
| 12 | Iron work wroucnt & put up in trusses as per direction of Engineer-in -charge including cost of all labour,T&P, cost of |
| 13 | Priming one coat en Iron work with any approved primer |
| 14 | Painting two coatswith any aaproved paint of new wood/iron work |
| 15 | S/F of 1 x12w LED tube light with |
| 16 | S/F of roof fan with |
| 17 | S/F of roof fan with |
| 18 | labor for drilling hole of 125 x 100 mm |
| 19 | supplying all labour T & P for lowerin th following size GI/ PVC pipes with or without slotted pipes as per the neccessity from ground level and fitted and fixed up in |
| 20 | basin Please Enable Macros to View BoQ information |