|
| 1 | Civil work: |
| 2 | Cleaning of single lane roads and their side patteries alternate day including sweeping removing garbage and vegetation from patteries, if any and its disposal to dust bins. (Road length is 1.70 KM.) C.S.I. No. 22.74b-2012) |
| 3 | Cleaning of side back lane approaches. roads and their side patteries alternate day including sweeping removing garbage and vegetation from patteries, if any and its disposal to dust bins. (Length is 2.50 KM.) (based on C.S.I. No. 22.74c/-2012) |
| 4 | Cleaning of main drain or width more than 300 mm.including disposal of waste refuses sludge out side the board's area including washing and cleaning by clean water completely as per direction of the Engineer-in-charge including cost of all labour,T&P etc.required for proper completion of the work.(NSI 20.14) |
| 5 | Cleaning of main drain or width less than 300 mm.including disposal of waste refuses sludge out side the board's area including washing and cleaning by clean water completely as per direction of the Engineer-in-charge including cost of all labour,T&P etc.required for proper completion of the work.(NSI 20.15) |
| 6 | Cleaning and opening of chocked W.C./ bath / kithchen pipe line including opening and refixing of chamber cover including washing etc. complete.(Analysis based on NBO - 11 25.020.(NSI 20.19) |
| 7 | Cleaning of inspection chamber including disposal of waste out side the UPPCL area as per direction of the Engineer-in-charge including cost of all labour,T&P etc.required for proper completion of the work.(NSI 20.13) |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.(CSI 15.60) |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.(CSI 2.6.1) |
| 10 | Supply and sprinkling of lime in all drains of colony and water logged area including cost of all labour,materials,and T&P etc, as required for proper completion of the work.(NSI 22.19) |
| 11 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.(CSI 2.31) |
| 12 | Attending to petty maintenance service like plumbing service,welder service, mansion service and carpenter service required as below. (Job attending by one no. Plumber/welder/mason /carpenter with one no. helper per hour or part of an hour.)(NSI 22.18) Please Enable Macros to View BoQ information |