| 1 | Ground Floor |
| 2 | Earthwork excavation of foundation in hard soil within initial lead & lift including rough dressing breaking of clods and leveling the bed and sides then depositing the excavated earth away from the work site etc. complete T & P required for the work as directed by the Engineer- in- Charge. |
| 3 | Filling in foundation and plinth with sand, well watered and rammed to required thickness with all leads and lifts, cost conveyance & royalty and all taxes of materials, cost of labour, T & P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. |
| 4 | Cement concrete (1:3:6) with 40 mm in foundation using 40 mm size clean hard black hand broken granite metal of approved quality from approved quarry mixing with concrete mixture laying mannually including hoisting, lowering and laying in layers not exceeding 15 cm thick to the required level, ramming, watering with cost conveyance, royalty and all taxes of materials, cost of labour, T &P and machineries etc curing etc. complete. as directed by the Engineer-In-Charge. |
| 5 | Fly ash brick massonary of size 25 cm x 12cm x 8cm in cement mortar (1:6) in F&P including cost, convayancy & royalty etc. complete. |
| 6 | Fly ash brick massonary of size 25 cm x 12cm x 8cm having a crushing strength not less than 75 Kg/sq.cm in cement mortar (1:6) in superstructure including splays cutting, circular moulding, chamfering and corbelling, and watering and curing etc. complete including cost conveyance, royalty and all taxes of materials with cost of labour, T & P etc. required for the work complete in all respect as directed by the Engineer-In-Charge..GROUND FLOOR |
| 7 | FIRST FLOOR |
| 8 | SECOND FLOOR |
| 9 | R.C.C. in CC (1:1½:3) with clean hard broken granite chips of 12 mm size consistent with strength and strengthen cover of concrete, of approved quality and from approved quarry mixing with concrete mixture & laying mannually including hoisting with and laying concrete in layer not exceeding 15cm in depth to the required thickness and compacting as per the direction of the Engineer-in-charge including rigid & smooth centering , shuttering , watering and curing for four weeks and finishing the exposed surface smooth with cost, conveyance, taxes and royalities and taxes of all materials, labour T & P, hire and running charges of machineries required for the work, but excluding cost,conveyance, of M.S/T.S Rods and direction of Engineer-in-charge.GROUND FLOOR, Plinth Bend |
| 10 | Lintle Bend |
| 11 | Columns & Beam |
| 12 | Slab & Chajja |
| 13 | FIRST FLOORLintle Bend |
| 14 | Columns & Beam |
| 15 | Slab & Chajja |
| 16 | SECOND FLOORColumns & Beam |
| 17 | Slab & Chajja |
| 18 | Supplying,straightening, cutting, bending, binding, cranking, hooking, and jointing, (if required) the HYSD rod and tying the grills, hoisting and placing in proper position as required for R.C.C. works including cost, conveyance and all taxes of HYSD. rods and binding wires of 18 to 20 gauge with cost of labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in- charge. GROUND FLOOR |
| 19 | FIRST FLOOR |
| 20 | SECOND FLOOR |
| 21 | 25 mm thick Grading concrete with (1:2:2) over roof slab to proper slope finished smooth including cost of water proof compound with watering and curing including cost, conveyance, royalty and all taxes of materials with cost of labour and T & P etc. required for the work complete in all respect as per direction of Engineer-in-Charge.SECOND FLOOR |
| 22 | 6 mm thick cement plaster in C.M (1:4) to RCC surface finished smooth including cost of water proof compound with watering and curing including cost, conveyance, royalty and all taxes of materials with cost of labour and T & P etc. required for the work complete in all respect as per direction of Engineer-in-Charge.GROUND FLOOR |
| 23 | FIRST FLOOR |
| 24 | 16 mm thick cement plaster in C.M. (1:6) over brick work (inside walls), after raking out joints finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect in all respect as per direction of Engineer-in-Charge.. GROUND FLOOR |
| 25 | FIRST FLOOR |
| 26 | SECOND FLOOR |
| 27 | 12 mm thick cement plaster in cement mortar (1:6) over stone masonary finished smooth including watering and curing, cost conveyance royalty and all taxes of materials with cost of labour and T & P etc, required for the work complete in all respect in all respect as per direction of Engineer-in-Charge.. GROUND FLOOR |
| 28 | FIRST FLOOR |
| 29 | SECOND FLOOR |
| 30 | Fixing vetrified tile in floors, trade or steps & landing on 25 mm thick cement plaster (1:1) jointed with neat cement slurry mixed with pigments to match the shade of the tiles rubing and polishing etc. Complete GROUND FLOOR |
| 31 | FIRST FLOOR |
| 32 | Fixing ceramic tiles in floors, treads on steps and landing on 25 mm thick cement plaster (1:1) jointed with neat cement slurry mixed with pigments to match the shade of the tiles rubing and polishing etc. Complete GROUND FLOOR |
| 33 | Fixing CERAMIC tiles in dado, skirting & riser of steps12 mm thick cement plaster (1:3) over brickwork for dadoes, finished smooth with proper thickness, watering, curing for seven days with cost conveyance, royality, taxes of all materials, labour etc complete.GROUND FLOOR |
| 34 | Providing fitting &fixing of granite tiles in floor including cost, conveyance etc complete.over 20mm thick cement morter (1:4) complete.GROUND FLOOR |
| 35 | FIRST FLOOR |
| 36 | Fixing of tiles of approved shade and design over 12 mm thick cement plaster (1:3) over brickwork for dadoes, finished smooth with proper thickness, watering, curing for seven days with cost conveyance, royality, taxes of all materials, labour etc complete.GROUND FLOOR |
| 37 | FIRST FLOOR |
| 38 | Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect. |
| 39 | Wall painting two coats with plastic emulsion paint of approved shade on new work over one coat of primer with approved primer on new wall surface. Complete in all respect as per direction of Engineer-in-Charge.GROUND FLOOR |
| 40 | FIRST FLOOR |
| 41 | SECOND FLOOR |
| 42 | Weather coating two coats to the wall with approved shade over a coat of wall primer on new work to give on even shade including cost of weather conveyance, taxes of all materials, labour etc complete in all respect as per direction of Engineer-in-Charge.GROUND FLOOR |
| 43 | FIRST FLOOR |
| 44 | SECOND FLOOR |
| 45 | Painting two coats with any approved paints over a coat of priming to new wood work and iron works including sand papering polishing the surface with all cost, conveyance, royalty and all taxes of materials including cost of paints and primer, cost of labour and T & P etc. required for the work complete in all respect as per direction of Engineer-in-Charge. GROUND FLOOR |
| 46 | FIRST FLOOR |
| 47 | SECOND FLOOR Please Enable Macros to View BoQ information |