|
| 1 | INDIGENOUS DEVELOPMENT OF WEAPON INTEGRATION TESTER FOR SU 30 MKI AC |
| 2 | Development cost Of Weapon Integration tester |
| 3 | Prototype cost of Weapon Integration tester ITEM RATE BOQ Tender Inviting Authority: CO 4 BRD, AF CO 1CIMD Name of Work: INDIGENOUS DEVELOPMENT OF Weapon Integration tester PROTOTYPE QTY-01 Name of the bidder/ Bidding Firm/ Company: BREAKDOWN OF DEVELOPMENT COST & PROTOTYPE COST (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant coloumns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder name and Values only) sl No Item Description Quantity Basic Rate (Rs.). Rate of GST (%) GST Amt (Rs.) Tot Amt without taxes (Rs.) Total amount with taxes(Rs.) |
| 4 | Break down of one time development cost |
| 5 | Generation of specification and Design development |
| 6 | Cost of tooling/dies/fixtures and such other one time investment |
| 7 | Cost of qualification acceptance/life cycle testing charges |
| 8 | Total Development Cost [sum of sl no 1.01 to 1.03] |
| 9 | Break down of prototype, per Unit/piece |
| 10 | Cost of Labour (per Unit/piece) |
| 11 | Cost of material (per Unit/Piece0 |
| 12 | Rework/ Scrap Coverage |
| 13 | Overhead expenditure |
| 14 | Any other factor if any |
| 15 | Profit margin |
| 16 | Total Cost of prototypes (one Unit/Piece) (sum of sl no 2.01 to 2.06) |
| 17 | Total Cost for required number of prototypes (sl no 2.7) X Total number of prototypes sought |
| 18 | Total development cost + prototype(s) cost (sl no 1.04 + sl no 3) BREAKDOWN OF FUTURE COST (DURING BULK SUPPLY) PER PIECE/UNIT Tender Inviting Authority: AOC 11BRD AF Name of Work: INDIGENOUS DEVELOPMENT OF Weapon Integration tester nil; Name of the Bidder/Bidding Firm/Company: BREAKDOWN OF FUTURE COST (DURING BULK SUPPLY) PER PIECE/UNIT This BOQ template must not be modified/replaced by the bidder and the same should be updated after filling the relevant coloumns,else the bidder is liable to be rejected for this tender.Bidder are allowed to enter the Bidder name and values only sl No Item Description BASIC Rate GST in % GST Amt IN INR Rs. Tot Amt without taxes in RS Tot amt with taxes |
| 19 | Detailed Break Down |
| 20 | Cost of Labour (per Unit/piece) for bulk supply in future |
| 21 | Cost of material (per Unit/Piece) for bulk supply in future |
| 22 | Rework/ Scrap Coverage |
| 23 | Overhead expenditure |
| 24 | Any other factor if any |
| 25 | Profit margin |
| 26 | Total future Cost per Unit/Piece (sum of sl no 1.01 to 1.06) |
| 27 | Total Future Cost Per Piece/ Unit (For future Bulk procurement . Govt duties/taxes would be at Govt rates as applicable at the time of procureement) |
| 28 | minimum Order Quantity (MOQ) (if any) to be placed by IAF during Future Bulk Supply |
| 29 | The MOQ sought by IAF is Qty 01As required |
| 30 | Likely Delivery Period during Future Bulk Supply |
| 31 | Discounts,if any in Future Bulk Supply (Only discount rates are given.Applcable Taxes at the time of actual supply would be over and above the discount rates quoted below) |
| 32 | 6-10 11-30 |
| 33 | ABOVE 30 Note: Rates of IOQ will be derived from MOQ slab |
| 34 | Validity of Future Cost |
| 35 | The Future cost is appicable for the next 05 years from the date of certification |
| 36 | Note: |
| 37 | (i) GST IF ANY MUST BE MENTIONED WITH SLAB RATE & HSN CODE (II) GST REGISTRATION CERTIFICATE AND LAST PAYMENT DETAILS OF GST TO BE ENCLOSED ALONG WITH BID (III) ANY FAILURE OF THE PROTOTYPE ,IAF IS NOT LIABLE FOR ANY PAYMENT ITEM RATE BOQ Tender Inviting Authority: CO 4 BRD, AF CO 1CIMD Name of Work: INDIGENOUS DEVELOPMENT OF MAIN UNIT INSTALLATION DEVICE PROTOTYPE QTY-01 Name of the bidder/ Bidding Firm/ Company: BREAKDOWN OF DEVELOPMENT COST & PROTOTYPE COST (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant coloumns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder name and Values only) sl No Item Description Quantity Basic Rate (Rs.). Rate of GST (%) GST Amt (Rs.) Tot Amt without taxes (Rs.) Total amount with taxes(Rs.) |
| 38 | Break down of one time development cost |
| 39 | Generation of specification and Design development |
| 40 | Cost of tooling/dies/fixtures and such other one time investment |
| 41 | Cost of qualification acceptance/life cycle testing charges |
| 42 | Total Development Cost [sum of sl no 1.01 to 1.03] |
| 43 | Break down of prototype, per Unit/piece |
| 44 | Cost of Labour (per Unit/piece) |
| 45 | Cost of material (per Unit/Piece0 |
| 46 | Rework/ Scrap Coverage |
| 47 | Overhead expenditure |
| 48 | Any other factor if any |
| 49 | Profit margin |
| 50 | Total Cost of prototypes (one Unit/Piece) (sum of sl no 2.01 to 2.06) |
| 51 | Total Cost for required number of prototypes (sl no 2.7) X Total number of prototypes sought |
| 52 | Total development cost + prototype(s) cost (sl no 1.04 + sl no 3) BREAKDOWN OF FUTURE COST (DURING BULK SUPPLY) PER PIECE/UNIT Tender Inviting Authority: AOC 11BRD AF Name of Work: INDIGENOUS DEVELOPMENT OF MAIN UNIT INSTALLATION DEVICE IOQ-2 Name of the Bidder/Bidding Firm/Company: BREAKDOWN OF FUTURE COST (DURING BULK SUPPLY) PER PIECE/UNIT This BOQ template must not be modified/replaced by the bidder and the same should be updated after filling the relevant coloumns,else the bidder is liable to be rejected for this tender.Bidder are allowed to enter the Bidder name and values only sl No Item Description BASIC Rate GST in % GST Amt IN INR Rs. Tot Amt without taxes in RS Tot amt with taxes |
| 53 | Detailed Break Down |
| 54 | Cost of Labour (per Unit/piece) for bulk supply in future |
| 55 | Cost of material (per Unit/Piece) for bulk supply in future |
| 56 | Rework/ Scrap Coverage |
| 57 | Overhead expenditure |
| 58 | Any other factor if any |
| 59 | Profit margin |
| 60 | Total future Cost per Unit/Piece (sum of sl no 1.01 to 1.06) |
| 61 | Total Future Cost Per Piece/ Unit (For future Bulk procurement . Govt duties/taxes would be at Govt rates as applicable at the time of procureement) |
| 62 | minimum Order Quantity (MOQ) (if any) to be placed by IAF during Future Bulk Supply |
| 63 | The MOQ sought by IAF is Qty 01As required |
| 64 | Likely Delivery Period during Future Bulk Supply |
| 65 | Discounts,if any in Future Bulk Supply (Only discount rates are given.Applcable Taxes at the time of actual supply would be over and above the discount rates quoted below) |
| 66 | 6-10 11-30 |
| 67 | ABOVE 30 Note: Rates of IOQ will be derived from MOQ slab |
| 68 | Validity of Future Cost |
| 69 | The Future cost is appicable for the next 05 years from the date of certification |
| 70 | Note: |
| 71 | (i) GST IF ANY MUST BE MENTIONED WITH SLAB RATE & HSN CODE (II) GST REGISTRATION CERTIFICATE AND LAST PAYMENT DETAILS OF GST TO BE ENCLOSED ALONG WITH BID (III) ANY FAILURE OF THE PROTOTYPE ,IAF IS NOT LIABLE FOR ANY PAYMENT Please Enable Macros to View BoQ information |