| 1 | Part A : Restoration and Conservation WorkRemoving lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. |
| 2 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. |
| 3 | Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete. |
| 4 | Lowering down carefully existing brick masonry of the monument manually in proper order including shifting the bricks up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete. |
| 5 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works |
| 6 | Removing Pointing to brick work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 7 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means |
| 8 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. |
| 9 | Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. |
| 10 | Providing Brick Masonry First Class in superstructure of first quality bricks of size 9″ x 4½″ x 2½″ in lime mortar 1:1½, as per detailed specifications and drawings or as directed including the bricks to be of uniform size, moulded on tables, thoroughly well burnt and sound, ringing clearly when stuck with trowel, the bricks to be soaked in water for 12 hours before used, the bricks are to be laid flush in mortar in such bond as directed, as far as possible, bricks of uniform colour are to be selected for the face work when it is not to be plastered, the joints are not to exceed 9.5 mm. (⅜″), no bats or half brick to be used in the work, racking out joints where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 11 | Providing ornamental / artwork plaster 12 to 18 mm thick Lime Plaster in single coat in lime mortar 1½:1 in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Art Work Plaster |
| 12 | Providing 12 mm. thick Rough Cast Lime Plaster in single coat in lime mortar 1½:1 in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 13 | Providing Lime Pointing to brick work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 14 | Providing Brick Flooring Laid Flat in lime mortar 1:1½, with size of bricks 43 x 23 x 7.5 cm, as per detailed specifications and drawings or as directed the bricks shall be selected well-burnt bricks of good colour and shape with rubbed joints, the bricks shall be thoroughly wetted and set flat in mortar on concrete bed, the paving joints shall not be more than 10 mm. (⅜″) in thickness, the whole surface should be kept wetted for three weeks, preparing the lime mortar in lime miller, watering and all flooring work when handed over to be perfectly clean and free from all mortar stains etc. |
| 15 | Providing and applying melamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scrapping, applying French polishing, scaffolding if required etc. complete. Note:The work to be executed on prior approval of Superintending Engineer will be necessary |
| 16 | Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete. |
| 17 | Providing and applying 2 coats of Liquid Cleaner with strong anti-biological growth properties applied to the surface to remove biological stains from a variety of natural stones, cement bound surfaces, brick walls or masonry etc. including Washing the surface thoroughly by pressure water by water jet machine and then application of 2 coats of the chemical as directed by engineer in charge etc. complete |
| 18 | Part B : Site Development WorksClearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . |
| 19 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means |
| 20 | Providing second class Burnt Brick masonry with conventional / I.S. type bricks in cement mortar 1:6 in foundations and plinth of inner walls / in plinth external walls including bailing out water manually, striking joints on unexposed faces, raking out joints on exposed faces and watering etc. Complete. |
| 21 | Filling in plinth and floors with approved excavated material in 15cm. To 20 cm. Layers including watering and compacting etc. complete |
| 22 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 23 | Providing Brick Flooring Laid Flat in lime mortar 1:1½, with size of bricks 43 x 23 x 7.5 cm, as per detailed specifications and drawings or as directed the bricks shall be selected well-burnt bricks of good colour and shape with rubbed joints, the bricks shall be thoroughly wetted and set flat in mortar on concrete bed, the paving joints shall not be more than 10 mm. (⅜″) in thickness, the whole surface should be kept wetted for three weeks, preparing the lime mortar in lime miller, watering and all flooring work when handed over to be perfectly clean and free from all mortar stains etc. |
| 24 | Providing flush grooved pointing with cement mortar 1:3 for brick work including scaffolding and curing etc. complete. |
| 25 | Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm with iron bars at 150mm C/C and diagonal flats as per the detailed drawing including hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kilogram/Smt. |
| 26 | Part C: Allied WorksDisposing off / conveying the dismantelled materials of stone masonry / brick masonry/ concrete/ debris/ excavated material / soil murrum / rubbish material or vegetation / grass / shrubs etc. from site to 5 Km as directed by Engineer incharge |
| 27 | Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5\\" X 7\\" Size outdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shooting, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete |
| 28 | Book Designing, Publishing and Printing: The work involves printing of a book / guidebook on the fort / monuments and its various aspects, which would provide authentic and precise tourism oriented information. This work involves important photographs of the site, art objects, antiquities, inscriptions etc., which would be useful for educating the masses of the rich cultural heritage of the site, region and state. providing 100 pages coloured books as directed by engineer in charge / ADA |
| 29 | Carrying out Chemical Analysis of Existing material used in the construction of Monument etc. complete Please Enable Macros to View BoQ information |