| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | 8 M. long STP-410 SP-10 (BPHD Gal) |
| 3 | 8.5M. Long STP 410 SP-21 (BPHD Gal). |
| 4 | Earthing Rod MS 20x2500mm. |
| 5 | GI wire 5mm/6 SWG. |
| 6 | Stay set GI 16x1800mm. |
| 7 | Stay wire GI 7/3.15mm 7/10 SWG. |
| 8 | LT XLPE cable 3.5x50Sq.mm. |
| 9 | LT XLPE Cable 1x70 Sq.mm. |
| 10 | LT XLPE AB Cable 3x95+1x70 Sq.mm. |
| 11 | Dead End Calm with I Hook AB Cable SP-10. |
| 12 | LT Calmp with Nut and bolt ST Pole SP-21. |
| 13 | LT Calmp with Nut and Bolt ST Pole. SP-10. |
| 14 | Earth wire Clamp for SP-10 with Nut and bolt. |
| 15 | Stay Clamp for SP-10 with nut and bolt. |
| 16 | Suspension clamp with J Hook. |
| 17 | Stay Insulator. |
| 18 | B type Piercing connector for ABC. |
| 19 | LT distibution box 03 Phase 04 Wire. |
| 20 | PG Clamp. |
| 21 | Distribution box clamp. |
| 22 | LT XLPE cable 1x35 sq.mm. |
| 23 | LT AB Cable 1x35+1x25 sq.mm. |
| 24 | LT distibution box 1 Phase. |
| 25 | Al . Crimping type Lugs 25 sqmm. |
| 26 | Annexure-B (Following work as per UPCL norms) |
| 27 | Erection of Earthing Rod. |
| 28 | Excavation of pit for stay set. |
| 29 | Erection of LT stay set. |
| 30 | Grouting of stay set. |
| 31 | Excavation of pit for pole. |
| 32 | Erection of single SP-10 pole. |
| 33 | Erectin of single SP-21 Pole. |
| 34 | Grouting of pole. |
| 35 | Muffing of pole. |
| 36 | Dismantling of LT line 1 Phase 2 wire (Weasel). |
| 37 | Dimantling of LT line 3 Phase 4 Wire (Weasel). |
| 38 | Cartage o fSP-10 Pole., 70-100 Km. |
| 39 | Cartage of SP21/23 Ple, 70-100 Km. |
| 40 | Cartage of petyy material, 71-100 Km. |
| 41 | Headload cartage of SP-10 pole, 1-3 Km. |
| 42 | Headload cartage of SP-21/23 pole, 1-3 Km. |
| 43 | Headload cartage of matrial, 1-3 Km. |
| 44 | Resagging of LT AB cable. |
| 45 | Disconnection and reconnection of consumer. |
| 46 | Back cartage of petty material, 71-100 K. |
| 47 | Laying and fixing of LT XLPE cable. |
| 48 | Installation of ACB LT Distribution box. |
| 49 | Erection of Dead End Clamp. |
| 50 | Erection of Suspension Clamp. |
| 51 | Back Headload cartage of petty material, 1-3 Km. |
| 52 | Laying of 1x35 Sq.mm. XLPE insulated cable. |
| 53 | Fixing of piercing connector 95-35 Sq.mm. |
| 54 | Laying of LT AB Cable 3Cx50+1x35. |
| 55 | Laying of LT XLPE ABC 3x95+1x70+16 Sq.mm. |
| 56 | Erection of stay clamp. |
| 57 | Fixing of piercing connector 50-25 Sq.mm. |
| 58 | Fixing of PG Clamp 70-25 Sq.mm. |
| 59 | Lopping and Chaopping of tree branchases. |
| 60 | Dismantelling ETC & Assembling ETC of CSS. Please Enable Macros to View BoQ information |