| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries , T & P & all other machinaries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. |
| 2 | Filling F&P with sand well watered and rammed including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 3 | P.C.C. (1:3:6) to using 40 MM size hard granite matal including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 4 | RCC M20 using 12 mm size C.B.H.G. Chips etc including cost of all materials & labours Ground Floor |
| 5 | Supplying, fitting, fixing & placing uncoated HYSD bar reinforcement complete |
| 6 | Rigid smooth centering for RCC works including false work and dismantelling them after casting including cost of materials complete in ground floor RCC foundation, Pointh band, and footing base of column Ground Floor |
| 7 | Plinth Band (Ground Floor) |
| 8 | Lintel Beam (Ground Floor) |
| 9 | Wall Beam (Ground Floor) |
| 10 | Slab (Ground Floor) |
| 11 | Brick Work with FLY ASH 23 x 11x 8 brick having crushing strength between 35 Kg/CM2 to 149 Kg/CM2 in CM (1:6) in foundation and plinth including cost, carriage and royality etc. |
| 12 | Brick Work with FLY ASH 23 x 11x 8 brick having crushing strength between 35 Kg/CM2 to 149 Kg/CM2 in CM (1:6) in foundation and plinth including cost, carriage and royality etc.Ground Floor |
| 13 | 12 MM thick CP with CM (1:6) over brick work, including cost, conveyance of all material and labour etc complete as per the direction of EIC Ground Floor |
| 14 | 16 mm thick CP with CM (1:6) over brick work, including cost, conveyance of all material and labour etc complete as per the direction of EIC Ground Floor |
| 15 | 12 MM thick CP with CM (1:4) over brick work, including cost, conveyance of all material and labour etc complete as per the direction of EIC Ground Floor |
| 16 | Supplying fitting of MS door & Window etc Ground Floor |
| 17 | Providing, fitting and fixing of Aluminimum Door with anodized Aluminimum Door section-9202 as vertical member, 9201 as top, 9200 as bottom and middle member with frame section as 9221 with tapered clip no 4660 and frame to be completed by means of jointing angle no-1855 including all cost of labour, hire charges, drilling machine etc completed. (Ref- chapter XIX-other Building items, Sl- (6) |
| 18 | Fixing Vertified tiles in floor, treads of steps and landing on 20 mm thick bed of cement mortar (1:4) and filling joints with white cement of approved quality including cost of all meterials, labours T&P, rubbing and polishing etc all complete Ground Floor |
| 19 | Fixing Ceramic tiles in dados skirting and risers of steps on 12 mm thick bed of cement plaster (1:3) jointed with neat cement slury mixed with pigments to match the shade of the tiles including rubbing and polishing etc all complete |
| 20 | Fixing chequred tiles in floor, treads of steps and landing on 25mm thich bed of cement morter (1:1) jointed with near cement slury mixed with pigments to match the shade of the tiles including rubbing and polishing etc complete |
| 21 | Finishing surface of all with acrilic wall putty (water based) of approved make and finished smooth and even surface to received painting including cost of puty all labour T&P etc complete Ground Floor |
| 22 | Priming one coat of wall cement primer (water bound) oncluding cost of primer all labour T&P etc completed-Ground Floor |
| 23 | Distempering two coats to wall with distemper of approved shade on new work including all cost etc complete-Ground Floor |
| 24 | Finishing wall painting two coats with any approved weather seal cost paint incluidng all cost, carriage, royality etc-Ground Floor |
| 25 | Painting two coat with any approved paint on oron work over a cost of priming including all cost carriage, royalty etc complete-Ground Gloor Please Enable Macros to View BoQ information |