| 1 | Providing and laying Antiskid vitrified tiles in floor in diferent sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade. The tile are to be fixed with 3mm thick spacer. The tile are to be fixed with 3mm thick spacer. The grooves are to filled with cemenitious grout mixed with proporation of 0.90 kg grout and 0.10 kg of hardener for each kg of filling material complete in all respect and to entire staifaction of Engineer in Charge. Size of Tile 600x1200 mm |
| 2 | Providing and laying double charge vitrified floor tiles of specified size (thickness to be specified by the manufacturer) of 1st quality with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades. The tile are to be fixed with 3mm thick spacer. The grooves are to filled with cemenitious grout mixed with proporation of 0.90 kg grout and 0.10 kg of hardener for each kg of filling material complete in all respect and to entire staifaction of Engineer in Charge. size of tile 600 x 1200 mm |
| 3 | Providing and laying double charge vitrified floor tiles of specified size (thickness to be specified by the manufacturer) of 1st quality with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, in skirting,The tile are to be fixed with 3mm groove with spacer over 12mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including grouting the joints with white cement and matching pigments etc., complete. Double charge vitrified tile of size 1200 x 600 mm |
| 4 | Providing and fixing 2nd class teak wood (kiln seasoned) chowkhat 4 1/2\\" x 2 1/4\\"including cost of corner straps, iron hold fasts, hinges, screws,nails, fevicol etc. and spirit polish of chowkhats. Rate includes the cost of dismantling of all damaged chowkhats and making good the damage to walls plaster and floors as required including, disposal of rubbish to the dumping ground the rate further includes the cost of painting two coats synthetic enamel paint over one coat of wood primer complete in all respect and to the entire satisfaction of Engineer-in-Charge |
| 5 | Providing and Fixing 35mm thick 2nd class teak wood (kiln seasoned) wire gauge door shutter consisting of 100mm x 35 mm style and top rail 150 mm x 35 mm lock rail 200mm x 35 mm bottom rail wire mesh 22 x 12 mm gauge fixed with 1/2” x 3/4” teak wood (kiln seasoned) beading, incluuding Stainless Steel fittings and the rate further includes the cost of painting two coats synthetic enamel paint over one coat of wood primer complete fixed in position and in all respect to the entire satisfaction of Engineer-in-Charge. |
| 6 | Providing and fixing 2'-0” deep cupboard /cabinet consisting of 19mm thick commercial board and 6mm thick ply on back side, 4mm thick teak ply pasted on the exposed surface and making shelves in cabinet 0.8mm mica inside canbinet . The rate further includes the cost of lipping, piano hinges, cupboard lock, screws, nails, 2 nos. fancy s.s. handles, 2 nos. magnetic catchers, fevicol and painting two coats over one priming coat and preparation of surface on board and ply surface and spirit polishing on teak ply complete in position as per entire satisfaction of Engineer-in-charge. |
| 7 | Providing and fixing 15 to 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing of edges to give high gloss finish etc. complete at all levels. (GRANITE).Granite stone slab of colour Black, Cherry/ Ruby Red (Based on DSR 8.2.2.1) |
| 8 | Dismantling of ceramic tiles or vitrified and plaster to making the surface clean for refixing the glazed tiles including removing of malba complete in all respect and to the entire satisfaction of the Engineer in charge. |
| 9 | Providing and fixing 1.5mm thick polycarbonate sheet to be fixed on the existing MS frame with self drilling machine screws complete in all respect to the entire satisfaction of Engineer-in-charge. |
| 10 | Steel work in built up frame made of / M.S. flat / M.S. pipe / M.S. angles of various sections including cutting, hoisting fixing in position and applying a priming coat of approved steel primer and two coats of snthetic enmael paint, welded and bolted including special shaped washers etc.. The work is required for making security wall jaffery/ ladder/grills/ frame work for shed or sunshade / other mis work.The steel work is to be provided at the site of the building complete in all respect and to the entire satisfaction of Engineer-in-charge. |
| 11 | Providing and fixing 3.0 mm thick clear polycarbonate sheet to be fixed on the existing MS / wooden frame with self drilling machine screws including remove the old polycarbonate sheet complete in all respect to the entire satisfaction of Engineer-in-charge. |
| 12 | Providing & fixing P.O.P. false ceiling at all heights including poroviding & fixing of framework made of special section, power pressed from M.S. sheets and galvanised with zinc coating of 120 gms/ sq, (both side inclusive) as per IS 277 and consisting of angle cleat of size 25mm wide x 1.6 mm thick with flanges of 27mm and 37mm, at 1200mm clc, one flange fixed to the ceiling with dash fastener 12.5mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers or 25 x 10 x 0.50mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I chanels 45 x15 x 0.90mm running at the spacing of 1200 mm c'c, to which the ceiling section 0.5mm thick bottom wedge of 80mm with tapered flanges of 26 mn each having lips of 10.5mm, at 450mm cIc, shall be fixed in a direction perpendicular to G.I ntermediate channel with connecting cip made out of 2.64mm dia x 230mm long G.I wire at every junction, including perimeter channels 0.50mm thick 27mm high having flanges of 20mm and 30mm long, the perimeter of ceiling fixed to wall/ partitions with the help of Rawl plugs at 450mm centre, with 25mm long dry wall screws 230mm interval, including laying of P.O.P. ceiling of average thickness 12 to 14mm reinforced with chicken mesh with ceiling sections including the cost of making opening for light fittings/concealed lighting, sound speakers, making suspended acoustical clouds, space for Curtains/ blinds, grills, diffusers, cut outs made with frame of perimeter channels etc suitably fixed by giving required offsets, excluding the cost of painting all complete as per and direction of the Engineer in charge |
| 13 | Providing and fixing 1.0 mm thick mica (Formica, Kit, Archid or tis equivalent) of approved shade and quality on commercial surface fixed in position by means of fevicol and nails etc. (As per sample approved by the allottee) complete in all respect to the entire satisfaction of Engineer in Charge NS |
| 14 | Providing and fixing 0.8 mm thick mica (Formica, Kit, Archid or tis equivalent) of approved shade and quality on commercial surface fixed in position by means of fevicol and nails etc. (As per sample approved by the allottee) complete in all respect to the entire satisfaction of Engineer in Charge NS |
| 15 | Providing and fixing of plyboard consisting of 18 mm thick commercial ply (ISI marked) phenol bonded fixed with hard wood battens and gutties including the cost of necessary lipping screws, nails, fevicol complete in all respect and to the entire satisfaction of the Engineer in charge. N.S |
| 16 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. Please Enable Macros to View BoQ information |