| 1 | Hire charges for hydraulic Excavator (JCB) front end loader for emergent works during floods or heavy rains as and when needed including opertational charges and fuel for working hours involved . |
| 2 | Hire charges for pokelean for emergency works during floods or heavy rains as and when needed including opertational charges and fuel for working hours involved . |
| 3 | Providing of Sumo/ Taverra for emergency works during floods or heavy rains, as and when required including cost of fuel and other allied charges etc. |
| 4 | Hire charges fo min truck to be hired during floods / heavy rains including cost of fuel etc for working hours as and when needed for assorted tasks , as per SSR. |
| 5 | Hiring of TRACTOR for emergency works during floods or heavy rains, as and when required incl. cost of fuel and other allied charges etc. |
| 6 | Supply and stacking of earth including loading, unloading and carriage upto site of work by all means commplete job. 5 km |
| 7 | Filling of EC bags with earth/ sand/ stone dust including stitching with thread but excluding the cost of sand/ stone/ dust/ sand. |
| 8 | Placing of earth/ sand/ stone dust filled bags in dry . |
| 9 | Placing of earth/ sand/ stone dust filled bags in wet/ water . |
| 10 | Carriage of EC bags from lethpora to Divisionssal store Marwal avg 12 km by mechanical transport. |
| 11 | Carriage of EC bags from flood store kakapora to various sites including loading, unloading/ complete job 12 km |
| 12 | Wages for unskilled labourers for working hours as and when needed as per SSR-2022 |
| 13 | Taking of Photographs, editing & printing hard & soft copies (before, during & after) of the vulnerable spots were flood precautionary measures will be done, complete job. |
| 14 | Add. Cost of Ec. Bags as prevalent as per stock rate |
| 15 | Loading / unloading sand/ earth filled/ stone dust filled bags.including all carriages. |
| 16 | Provision for welding repairs complete job |
| 17 | Provision for oiling and greasing. |
| 18 | Supply of B.A wire Crates (4mm dia) of size 16' x 16' (mesh size 4\\" x 4\\") weight not less than 50kg including carriage and headload and provide manufacturer report as desired by Engineer incharge. |
| 19 | Supply of Quarry Stones |
| 20 | Hand-packing stones in wire-crates; excluding cost of crates and stones. |
| 21 | Dumping stones |
| 22 | Carriage of material ( stones) from source to site of work/ road site uto 12 km avg. for actual carraige distance the J&K schedule rate shall be adjusted by contractors quoted tae. |
| 23 | Extra Carriage of materials from road side to site of work 50m .For actual headload distance the j&k schedule rates shall be adjusted by contractor qouted rate. |
| 24 | Providing and driving of Kikar piles as directed by engineer inchare including all means for driving enaganement of machinery boats all as complete job. Please Enable Macros to View BoQ information |