Tender For Lump Sum Price Worked Out By The Contractor For Building Works As Listed In Schedule A Part-I Representing Percentage (+ Or - Denomination) Derived Under Last Column Of This Schedule Above/ Below The Lum Sum Price Prepriced By The Mes B/, Ahmedabad-Gujarat
TDR : 54773327
Tender Notice
BOQ
24 Days Left
Ahmedabad
Gujarat
Tender for lump sum price worked out by the contractor for building works as listed in schedule a part-i representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the mes b/
Lump sum price worked out by the contractor for \\"BUILDING WORKS\\" as listed in SCHEDULE 'A' PART-I representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 21
2
Lump sum price worked out by the contractor for \\" EXCAVATION & EARTH WORK \\" as listed in SCHEDULE 'A' PART-II representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 22
3
Lump sum price worked out by the contractor for \\"INTERNAL WATER SUPPLY\\" as listed in SCHEDULE 'A' PART-III representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 25
4
Lump sum price worked out by the contractor for \\"INTERNAL ELECRIFICATION\\" as listed in SCHEDULE 'A' PART-IV representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 29
5
Lump sum price worked out by the contractor for \\"HARD STANDING/ PATH\\" as listed in SCHEDULE 'A' PART-V representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 30
6
Lump sum price worked out by the contractor for \\"SEWAGE DISPOSAL\\" as listed in SCHEDULE 'A' PART-VI representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 32
7
Lump sum price worked out by the contractor for \\"EXTERNAL WATER SUPPLY\\" as listed in SCHEDULE 'A' PART-VII representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 28
8
Lump sum price worked out by the contractor for \\"EXTERNAL ELECTRIFICATION\\" as listed in SCHEDULE 'A' PART-VIII representing percentage (+ or - denomination) derived under last column of this schedule above/ below the lum sum price prepriced by the MES B/F from SERIAL PAGE NO 34
9
SCHEDULE 'A' PART-IX (MISCELLANEOUS ITEMS)NOTES:-(i) This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under column 5 signifies this fact only.(ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under respective schedule.
10
(INTERNAL ELECTRIFICATION)S&F in Bldg security light LED light fitting including fixing arrangement on wall with suitable size of GI pipe bend into shape, clamps and nut & bolts for fitting capacity of LED 30 watt, with pressure diecast aluminum housing & polycarbonate having top opening seperate driver compartment with IP66 protection and impact resistance IK07 duly prewired connection complete all as directed. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.