| 1 | Supplying, installation, testing & commissioning of intelligent analog addressable photothermal detector complete with mounting base complete as required. |
| 2 | Supplying, installation, testing & commissioning of addressable horn cum strobe complete as required. |
| 3 | Supplying, installation, testing & commissioning of addressable fire control module complete as required. |
| 4 | Supplying, installation, testing & commissioning of fault isolator complete with base as required. |
| 5 | Supplying, installation, testing & commissioning of addressable manual call point complete as required |
| 6 | Supplying, installation, testing & commissioning of 6 inches dia, 2 watts, 70/100 volts ceiling speaker complete as required |
| 7 | Supplying & laying of 2x1.5 sqmm fire alarm armoured cable, 600/1000V rated with annealed copper conductor having XLPE insulation, steel wire armouring & FRLS / HFFR outer sheath complete as required. |
| 8 | Rectification of fault in the speaker Zone in the existing addressable fire alarm system by checking of wire for short circuit, wire cut, proper termination, open circuit, and earth fault in existing Speaker Zone consisting of 50 devices per loop approx. complete with testing commissioning etc as required. |
| 9 | Supplying, installation, testing & commissioning of addressable fire Relay module complete as required |
| 10 | Supply, Installation, Testing and Commissioning of 12/24V DC Power Supply, input-230VAC, 50Hz, dual output-12&24V DC make-PROTEC/ GURU in exisiting FAS panel complete etc. as required. |
| 11 | Rectification of loop wiring having approx. 100 to 125 nos. detectors inside the rooms, 12-15 nos. modules i/c testing and checking of loop wiring, hooter wiring, and upto date software updation with the help of notifier software complete with testing commissioning etc. required. |
| 12 | Supplying, installation, testing & commissioning of intelligent addressable thermal detector with rate of rise cum fixed temperature thermistor complete with base as required. Please Enable Macros to View BoQ information |