| 1 | 5.1.2Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b)Hard / dense soil |
| 2 | 4.21.1.4Hydraulic excavator/ loader like JCB/ Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity upto 0.40 cum Idle charges (in Rs.) |
| 3 | 2.27Cost of Diesel |
| 4 | 7.1.4Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. (d) In cement sand mortar 1:6 |
| 5 | 9.8.49.8 Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 9.8.4 20 mm |
| 6 | 9.2.49.2 Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 400 kg/ cum of concrete) 9.2.4 20 mm |
| 7 | 9.7.49.7 Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 9.7.4 20 mm |
| 8 | 7.1.47.8.1Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. (d) In cement sand mortar 1:6 Add extra over item no. 7.1.1 to 7.7.3 for (a) Masonry work in superstructure |
| 9 | 8.2.1 Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: (a) 20 mm |
| 10 | 18.28.2.218.28.2.4 Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. (diametre) 200mm ( Excluding Labour Charges ) NP-3 Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints.(diametre) 200mm (Labour Charges only) |
| 11 | 18.28.7.218.28.7.4Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. (diametre) 900mm ( Excluding Labour Charges ) NP-3 Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints.(diametre) 900mm (Labour Charges only) |
| 12 | 4.21.1.1 Hydraulic excavator/ loader like JCB/ Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity upto 0.40 cum Hire charges without diesel but with operational staff M.oil, spares and lubricants (in Rs) Please Enable Macros to View BoQ information |