| 1 | Earth work in all kind of soil within 50 m Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the EIC. 14 |
| 2 | Earth work excavation in foundation in oridinary soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the EIC. 09 |
| 3 | Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work. 18 |
| 4 | PCC (1:3:6) with 40 mm size CBHG metal including all cost of materials, labour, conveyance, royalty, T&P, water for curing etc all complete. 37 |
| 5 | Providing, laying, spreading and compacting graded stone aggregates to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant, carriage of mixed material by tripper to site, laying in uniform layers with paver in sub-base/ base course on well prepared surface and compacting with 3 wheeled steel roller 8-10 tonnes to achieve the desired density as per clause 406 of MoSRT&H specification for Road & Bridge works (4th Revision) including cost and conveyance of materials, cess T&P etc 241 |
| 6 | PCC (1:2:4) with 12 mm size CBHGC including hosting and laying all cost of materials, labour,conveyance, royalty, Tools and Plants water for curing etc.all complete. 39 |
| 7 | Providing, spreading, laying on road surface and compacting, proper camber layer of paver inter locking blocks minimum 80 mm thickness and inscribed machine mixed and compacted having crushing strength not less then M30 including filling the interstices with sand, watering, brooming, bliding and consolidation with wooden hammer as per OPWD specification and relevent code including cost of materials, conveyance, royality, labour, cess, T&P required to the work etc. complete to finished items. 98 |
| 8 | Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete, as per OPWD specification required for the work to finished items of work. 57 |
| 9 | Requirement of HYSD/ MS rod and labour for cutting, bending,binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge. 62 |
| 10 | Rigid and smooth centering and shuttering for CC/ RCC works in foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc including false work and dismentalling then after casting including cost of materials, cess complete in ground floor. 67 |
| 11 | Painting two coats with approved paint on new work (See Page no-93,Item no 3 of AoR-06) |
| 12 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the EIC 17 |
| 13 | Cost of Primer,Paint,Painting & Letter writing over Disply board 303 Please Enable Macros to View BoQ information |