| 1 | SITC/ITC for below mentioned items |
| 2 | 11/0.433kV, 200 kVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2,Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. |
| 3 | 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 4 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 5 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 6 | 240mm² single core Cable,1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type |
| 7 | GI Channel/Angle/Flat of sizes including clamps |
| 8 | Galvinized Nuts and Bolts. |
| 9 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 10 | LT Distribution Box for:- 200 kVA DTR with 315 Amp MCCB 3P 25 kA for incomer & 160 Amp MCCB 3P 16 kA 3 No.s for Outgoing Circuits. |
| 11 | 11kV Pilfer resistant metering cubicle for 3 phase 4 wire metering system with CT, PT, Bus bar, lugs etc suitable for 250kVA DT complete with pedestal etc |
| 12 | 3Ph3 Wire HT CT/PT operated Fully static Smart Tri-Vector Energymeters DLMS Compliant Category 'C' with RS 232 port for modem compatibility. 11kV/110V, Ph-Ph (3P,3W) meters for measurement of different electrical parameters including Active Energy (kWh/ MWh), Reactive Energy (kVArh/MVArh), Apparent Energy (kVAh/ MVAh) etc. (make L&T, Secure, ABB) |
| 13 | 3 Core 11 kV Aluminium cable XLPE armoured 35 mm2 including cost of clamp, for its fixing where ever required. |
| 14 | Earthing by way of 40 mm GI Pipe earthing . Job includes , excavation, enhancement materail and Main Hole Chamber (500x450x600)mm with frame and cover. |
| 15 | Cable termination kits suitable for 3 x 35 mm2 XLPE Cable (Indoor/Outdoor) |
| 16 | Sundry items like Aluminium lugs, Jumpers, Binding Tape etc |
| 17 | 9 Mtr. Long Pole,(ST-410 SP33) |
| 18 | 11 Mtr. Long Pole,(ST-410 SP56) |
| 19 | GI V cross-arm / side cross arm with top Bracket including clamp including back clamps |
| 20 | 50 mm² ACSR Conductor |
| 21 | PG Clamps for 50 mm² ACSR Conductor |
| 22 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 23 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 24 | Danger Plates with Clamps |
| 25 | Anti-Climbing Device with Clamps |
| 26 | Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm |
| 27 | Painting of Poles with Red Oxide and Aluminium Paint |
| 28 | Cement bottoming 1:2:4 mix as per Standards |
| 29 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 )mm, nut-bolts, 2 Nos turn- buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 30 | 8 Mtr. Long Pole ST-410 SP15 |
| 31 | 50 mm2 Cable (4C) from LT Line to meter,1.1kVGrade, Armoured,XLPE Insulated StrandedConductor FRLS type |
| 32 | 120 mm² AB Cable (3x120+1x25+1x95) mm² XLPE (1.1kV, 3+1 C, Al) |
| 33 | Suspension/Tension Clamp with eye hook |
| 34 | Straight Through Cable Jointing Kit |
| 35 | SMDB Boxes as per KPDCL Standards |
| 36 | Supply and fixing of IPCs |
| 37 | Dismantiling and transportation to stores at Ajar of existing poles along with accessories |
| 38 | Application of 3M brand 2inch high intensity reflective tape to poles(RYW color) |
| 39 | Dismantaling of ACSR from existing poles and its laying on New Poles Please Enable Macros to View BoQ information |