| 1 | Earth work excavation in hard soil withen 50 met initial lead and 1.5 met lift including dressing and levelling the foundation bed….etc |
| 2 | Sand filling in foundation and plinth with well watered and and ramming ..etc |
| 3 | PCC (1:4:8) using 40 mm size CBHG metal in foundation and base including cost conveyance royality ..etc |
| 4 | RCC M20 using 12mm size C.B.H.G chips etc incl cost of all materials & Labours:- |
| 5 | Supplying, fitting,fixing & placing Uncoated HYSD bar reinforcement complete. |
| 6 | Rigid and Smooth Centering and Shuttering including all Cost, Conveyance and Royalty Etc complete RCC Foundation,plinth band,footing bases of column RCC Column from PL to RL-Column |
| 7 | Plinth |
| 8 | Lintel Beam |
| 9 | celling beam |
| 10 | Brick work with FLY ASH.25x12x8 Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in foundationin and plinth including cost, carriage and royalty etc. |
| 11 | Brick work with FLY ASH. Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in super structure including cost, carriage and royalty etc. |
| 12 | 6 mm thick Cement Plaster with C.M (1:4) on ceiling including all cost, conveyance & royalty etc. complete. A/R, Page-109, Sl - (26) |
| 13 | 12 mm thick CP with CM (1:6) including all cost, conveyance & royalty etc all complete. A/R, Page-103, Sl - (4) |
| 14 | 16 mm thick Cement Plaster with CM (1:6) including all cost, conveyance & royalty etc. complete. |
| 15 | Supplying fitting fixing of M S door & window ….etc |
| 16 | Supplying and fixing of G I pressed G I Door assembly with polymer power coated including the cost of all materials and fittings etc com. |
| 17 | Labour for fitting fixing of doors & windows etc |
| 18 | Fixing Vetrified tiles in floors,treads of steps and landing on 20 mm thick bed of cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, labours T&P, rubbing and polishing etc all complete. ( Data for 10 Sqm ) ( A/ R for other Bldg Items 2006, Sl.( 2 ) |
| 19 | Fixing vetrified tiles in dados skirting and risers of steps on 12 mm thick bed of cement plaster (1:3) jointed with neat cement slury mixed with pigments to match the shade of the tiles including rubbing and polishing etc all complete. ( Data for 10 Sqm ) A/ R Page - 90, Sl.(17) |
| 20 | Fixing Chequred tiles in floors,treads of steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigments to match the shade of the tiles including rubbing and polishing etc all complete. ( Data for 10 Sqm ) A/ R Page - 89, Sl.(16) |
| 21 | Finishing surface of wall with Acrilic Wall Putty (Water based) of approved make and finished smooth and even surface to received painting including cost of puty all labour T&P etc complete. |
| 22 | Priming one coat of Wall cement Primer (Water bound) including cost of primer all labour T&P etc complete. |
| 23 | Distempering two coats to wall with distemper of approved shade on new work including all cost etc complete. |
| 24 | Finishing wall painting two coats with any approved weather seal coat paint including all cost, carriage,royalty etc co |
| 25 | Painting two coat with any approved paint on Iron work over a coat of priming including all cost,carriage,royalty etc omplete. |
| 26 | 25mm thick grading concrete (1:2:2) on roof slab with 6 mm size hbg chips for new work |
| 27 | Supplying, fitting and fixing of Stainless Steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipes with Balustrade of size 32mm x32mmx 2mm @ 0.90m c/c and stainless square pipe bracing of 32mm x 32mmx 2mm in three rowa in stair case as per approved design and specifications buffing, polishing including cost, carriage,royalty etc complete. ( Data for 3.26 Rmt ) Revised A/ R(Building) -2012, Item no - 11. Please Enable Macros to View BoQ information |