| 1 | SH:- Earth filling & levelling :- 23875 Cum |
| 2 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) |
| 3 | SH :- Granular Sub-base :- 0.600 Km |
| 4 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) (ii) for grading- I Material |
| 5 | SH :- SH:- W.B.M. - II :- 0.600 Km |
| 6 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) A-By Manual Means, (ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel) a) Using Scrining Crushable type such as Moorum or Gravel |
| 7 | SH:- DGBM :- 0.350 Km |
| 8 | Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) (ii) for GradingII(19 mm nominal size) |
| 9 | SH:- BC :- 0.350 Km |
| 10 | Bituminous Concrete (Providing and laying bituminous concrete with 100- 120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) (i) for Grading-I ( 13 mm nominal size ) |
| 11 | SH :- Pavement (Paver Block) :- 0.600 Km |
| 12 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 13 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in- Charge. b) 80 mm thick C.C. paver block of M-30 grade with approved colordesign and pattern. |
| 14 | SH :- CC Footh Path :-350 mtr |
| 15 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil, Manual Means, upto 3 m depth |
| 16 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 17 | SH :- CC Drain with cover :- 350.00 mtr |
| 18 | Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m. |
| 19 | Centring and shuttering including strutting, propping etc and removal of form work for : b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 20 | Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size) |
| 21 | Reinforcement of RCC work including bening binding, placing in position completeb) TMT steel |
| 22 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 23 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : 1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).(M20) |
| 24 | SH :- RCC Protection wall - 4.00 mtr. Height :- 300.00 Mtr |
| 25 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil, Manual Means, upto 3 m depth |
| 26 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 27 | Plain/reinforced cement concrete in open foundation complete as per drawing and technical specifical. A) PCC grade M15 |
| 28 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 29 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. Sandy materials |
| 30 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 31 | SH ;- Boundary wall - 405m length |
| 32 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. |
| 33 | Providing and laying cement concrete 1:3:6( 1 cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shutteringin. a) Foundation and plinth. |
| 34 | Reinforcement of RCC work including straightening, cutting, bending, placing in position and bending all complete. b) TMT steel |
| 35 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : 1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).(M20) |
| 36 | Reinforced cement concrete work in columns,pillars, piers,abutments,post and struts etc up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in : 1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).(M20) |
| 37 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 and even surface but excluding cost of centering, shuttering and reinforcementcement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth 1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).(M20) |
| 38 | Centring and shuttering including strutting, propping etc and removal of form work for : |
| 39 | a) Foundation, footings, bases of columns etc. and mass concrete. |
| 40 | b) Column, pillars, piers, abutments, posts and struts etc. |
| 41 | c) Lintels,beams,girders,bressumers and cantilevers etc. |
| 42 | Masonry with pre-cast cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone shingle 20 mm nominal size) blocks in cement mortar 1 : 4 (1 cement : 4 fine sand) in foundations and plinth |
| 43 | 12mm cement plaster of mixed. a) 1 : 4 (1 cement : 4 fine sand). |
| 44 | Providing and fixing MS grills of required pattern in wooden frames of windows etc with MS flat, square or round bars with round headed bolts and nuts or by screws. b) Ornamental grill |
| 45 | Applying one coat of cement primer of approved brand and manufacture on wall surface. |
| 46 | Finishing walls with water proofing cement paint of approved brand and manufacture and required shade on new work (three or more coats) to give an even shade. |
| 47 | SH ;- Traditional Gate -2 Nos |
| 48 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. |
| 49 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. |
| 50 | Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel. |
| 51 | Centring and shuttering including strutting, propping etc and removal of form work for : |
| 52 | a) Foundation, footings, bases of columns etc. and mass concrete. |
| 53 | e) Column, pillars, posts and struts etc. |
| 54 | d) Lintels, beams, girders, bressumers and cantilevers etc. |
| 55 | c) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas(3.5 m height). |
| 56 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : b) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).M20 |
| 57 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. c) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). M20 |
| 58 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. c) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). M20 |
| 59 | Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).M20 |
| 60 | M S Gate (Ornamental) |
| 61 | Traditional desiging and painting Please Enable Macros to View BoQ information |