| 1 | Total amount of Sch 'A' Sec-I (BUILDING WORKS ) Lump sum price worked out by the contractor for \\" BUILDING WORKS \\" as listed in schedule 'A' Part-I |
| 2 | Total amount of Sch 'A' Sec-II (DEMOLITION OF BUILDINGS WORKS) Lump sum price worked out by the contractor for \\" DEMOLITION OF BUILDINGS WORKS \\" as listed in schedule 'A' Part-II |
| 3 | Total amount of Sch 'A' Sec-III (SITE CLEARANCE, EARTHWORK AND EXCAVATION WORKS) Lump sum price worked out by the contractor for \\" SITE CLEARANCE, EARTHWORK AND EXCAVATION WORKS\\" as listed in schedule 'A' Part-III |
| 4 | Total amount of Sch 'A' Sec-IV (INTERNAL ELECTRIFICATION WORKS) Lump sum price worked out by the contractor for \\"INTERNAL ELECTRIFICATION WORKS \\" as listed in schedule 'A' Part-IV |
| 5 | Total amount of Sch 'A' Sec-V (INTERNAL ELECTRIFICATION, TV, TELEPHONE, INTERCOME & LAN WORKS ) Lump sum price worked out by the contractor for \\" INTERNAL ELECTRIFICATION, TV, TELEPHONE, INTERCOME & LAN WORKS \\" as listed in schedule 'A' Part-V |
| 6 | Total amount of Sch 'A' Sec-VI (SUMMER APPLIANCES AND AIR CONDITIONING WORKS ) Lump sum price worked out by the contractor for \\" SUMMER APPLIANCES AND AIR CONDITIONING WORKS \\" as listed in schedule 'A' Part-VI |
| 7 | Total amount of Sch 'A' Sec-VII ( HOT WATER SUPPLY WORKS ) Lump sum price worked out by the contractor for \\"HOT WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-VII |
| 8 | Total amount of Sch 'A' Sec-VIII (SOLAR WATER SUPPLY WORKS ) Lump sum price worked out by the contractor for \\"SOLAR WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-VIII |
| 9 | Total amount of Sch 'A' Sec-IX (EXTERNAL WATER SUPPLY WORKS) Lump sum price worked out by the contractor for \\"EXTERNAL WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-IX |
| 10 | Total amount of Sch 'A' Sec-X (EXTERNAL WATER SUPPLY WORKS Lump sum price worked out by the contractor for \\"EXTERNAL WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-X |
| 11 | Total amount of Sch 'A' Sec-XI (EXTERNAL ELECTRIC SUPPLY WORKS) Lump sum price worked out by the contractor for \\"EXTERNAL ELECTRIC SUPPLY WORKS) \\" as listed in schedule 'A' Part-XI |
| 12 | Total amount of Sch 'A' Sec-XII (SEWAGE DISPOSAL WORKS Lump sum price worked out by the contractor for \\"SEWAGE DISPOSAL WORKS \\" as listed in schedule 'A' Part-XII |
| 13 | Total amount of Sch 'A' Sec-XIII (AREA DRAINAGE WORKS) Lump sum price worked out by the contractor for \\"AREA DRAINAGE WORKS \\" as listed in schedule 'A' Part-XIII |
| 14 | Total amount of Sch 'A' Sec-XIV (COMPOUND WALL,CHAIN LINK FENCING AND GATE WORKS Lump sum price worked out by the contractor for \\"COMPOUND WALL,CHAIN LINK FENCING AND GATE WORKS \\" as listed in schedule 'A' Part-XIV |
| 15 | Total amount of Sch 'A' Sec-XV (FIRE FIGHTING WORKS) Lump sum price worked out by the contractor for \\"FIRE FIGHTING WORKS \\" as listed in schedule 'A' Part-XV |
| 16 | Total amount of Sch 'A' Sec-XVI (ARBORICULTURE WORKS) Lump sum price worked out by the contractor for \\"ARBORICULTURE WORKS \\" as listed in schedule 'A' Part-XVI |
| 17 | Supply, installation, testing and commissioning of refrigerators frost free 5 star rating, eco friendly R-134A electric driven (single phase) of capacity 190 ltrs ,direct cool single door wiith 1 hr lcing technology complete all as specified and directed. |
| 18 | Supply, installation, testing and commissioning of refrigerators frost free 5 star rating, eco friendly R-134A electric driven (single phase) of capacity 200 ltrs direct cool single door complete all as specified and directed. |
| 19 | Supply, installation, testing and commissioning of refrigerators frost free 3 star rating, eco friendly R-134A electric driven (single phase) of capacity 310 ltrs convertible ,triple inverter & fan motor technology ,with digital display bottom mounted double door complete all as specified and directed. |
| 20 | Supply, installation, testing and commissiong of desert cooler of fiber body electric driven (single phase) with tank capacitty 125 Ltr copper wound fan motor having nominal air flow capacity of 4000 cum per hour and sumercible pump for required flow of water honeycomb pad complete all as specified and directed. |
| 21 | Supply,installation, testing and commissioning Voltage stabilizer for automatic operation single phase naturally air cooled indoor type and designed for input variation between 170 V to 290 V with output voltage stabilized at 230 V with accuracy of + 2.5% of capacity 1 KVA (For Refrigrator) of water honeycomb pad complete all as specified and directed. |
| 22 | Supply,installation, testing and commissioning Voltage stabilizer for automatic operation single phase naturally air cooled indoor type and designed for input variation between 170 V to 290 V with output voltage stabilized at 230 V with accuracy of + 2.5% of capacity 2 KVA( For Water Cooler & Deep Freezer) |
| 23 | Supply,installation, testing and commissioning Voltage stabilizer for automatic operation single phase naturally air cooled indoor type and designed for input variation between 170 V to 290 V with output voltage stabilized at 230 V with accuracy of + 2.5% of capacity 4 KVA(For 1.5TR AC ) |
| 24 | Supply,installation, testing and commissioning Voltage stabilizer for automatic operation single phase naturally air cooled indoor type and designed for input variation between 170 V to 290 V with output voltage stabilized at 230 V with accuracy of + 2.5% of capacity 5 KVA(For 2.0TR AC ) |
| 25 | Road safty Convex Mirror 80cm dia made out of pc material provided with suitable MS pipe post duly powder coated, as per site requirement, complete all as specified and as directed by Engr-in-charge.(make -: SINOR, DARK EYE, CAT EYE, ROAD KNIGHT) |
| 26 | M & L for DWCPE 200mm dia pipe laid in trenches and jointed as specified |
| 27 | M & L for DWCPE 150 mm dia pipe laid in trenches and jointed as specified |
| 28 | S & F for Punched Tape Concertina Coil 750 mm dia, 300mm pitch with wire dia of 2.6mm as shown in CE CHZ Zone STD-1422(STR) Sheet No 1/4 to 4/4 and conforming to relevant IS all as per specified and directed by Engr in charge |
| 29 | M&L for laying of sweet earth including spreading , watering ,well ramming and fine dressing to required level and shape including bringing sweet earth( Free from grass , vegetation,pebbles/stone) from outside MD land including cost of earth & carriage, complete all as specified and directed by Engr-in- Charge. |
| 30 | Supply and mixing properly manure /cow dung with the excavated earth to make mixture of earth and manure to a ratio of 2:1 and surface dressing the area to a true level and required slope for grass plantation or to make plant/flower bebs. |
| 31 | Digging holes in soft/loose soil and refilling the same with mixture of clean earth and manure/ cow dung in ratio of 2:1 including watering, dressing , levelling etc complete all as specified and directed by Engr-in- Charge. |
| 32 | ditto as above but 100cm dia and 100cm deep |
| 33 | ditto as above but 60cm dia and 60cm deep |
| 34 | Plantation of bottle palm Tree including preparation of plant bed incl manuring and watering. |
| 35 | Ditto but Guava trees. |
| 36 | Ditto but Alestonia |
| 37 | Ditto but Ficus Benjamina |
| 38 | Ditto but Ashoka Please Enable Macros to View BoQ information |
| 39 | Ditto but Ashoka Please Enable Macros to View BoQ information |