| 1 | Scrapping out old paints from wall with scrapper, sand papering, washing with soap or soda water including scaffolding charges etc. complete in all respect as per specification & direction of Engineer-in-Charge. |
| 2 | Finishing the wall surface with Acrylic Wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding staging charges with cost, conveyances, taxes of all materials, cost of labour, T&P required for the work etc. complete as per specification & direction of the Engineer-in-charge. |
| 3 | Painting two coats with approved plastic emulsion paint over a coat of wall primer to inside surface of walls after cleaning the surface including watering, curing with cost, conveyance, taxes of all materials, labour, T&P required for the work etc. complete as per specification & direction of Engineering-in-charge. (a)Ground floor |
| 4 | (ii)First floor |
| 5 | (iii)Second floor |
| 6 | (iv)Third floor |
| 7 | Dismantling & removing the Old Doors & windows and Stacking the useful materials for re-use & removing the debris away from the worksite including all cost of labour, T&P required for the work etc. complete as per direction of the Engineer-in-charge. |
| 8 | Providing 12mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to out side smooth surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge. (i)Ground floor |
| 9 | Supplying, fitting and fixing of 2Track UPVC sliding window of approved make with 6mm thick glass of approved quality including all taxes of materials, conveyances, T&P required for the work etc complete as per direction of Engineer-in-charge. |
| 10 | Supplying, fitting and fixing of Roller Blind of approved quality including cost, conveyances, taxes of all materials, labour & T&P required for the work etc complete as per direction of Engineer-in-charge. |
| 11 | Painting two coats with approved synthetic enamel paints of approved colour, shade to old/new wood & iron work including cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. (i)Ground floor |
| 12 | (ii)First floor |
| 13 | (iii)Second floor |
| 14 | (iv)Third floor Please Enable Macros to View BoQ information |