| 1 | Chairs : Steel pipe pedded chair 1st Day |
| 2 | Chairs :Steel pipe pedded chair Subsequent days(per Day) |
| 3 | Wooden stage height 120 to 180 cm.with steps made of 50 mm dia iron pipe frame with adjustable height system and having smooth top wooden board complete . 1st Day |
| 4 | Wooden stage height 120 to 180 cm.with steps made of 50 mm dia iron pipe frame with adjustable height system and having smooth top wooden board complete . Subsequent days(per Day) |
| 5 | white cotton cloth cover for padded chair inculding ribbon 1st Day |
| 6 | white cotton cloth cover for padded chair inculding ribbon Subsequent days(per Day) |
| 7 | Barricading with Sal ballies as per design including tying with vertical post by coconut strings including digging out holes in all types of soil complete in all respect with two horizontal members height 1.2 m upto 1.5m above ground level and vertical supports upto 2.5 centre and upto 3 days period including removal and cleaning the site complete in all respect & including dressing of sides and providing retro reflective tapes for traffic safety as per direction of Engineer-in charge in all types of soil. |
| 8 | Tables :Wooden Table 6' x 3' (Babool). 1st Day |
| 9 | Tables :Wooden Table 6' x 3' (Babool). Subsequent days(per Day) |
| 10 | Tables :Centre Table Glass Top 2'x4' 1st Day |
| 11 | Tables :Centre Table Glass Top 2'x4' Subsequent days(per Day) |
| 12 | Add extra for item No. 5.18 & 5.19 in barricading for each subsequent day after 3 days Subsequent days(per Day) |
| 13 | Making of holes in cement concretee/ Bitumenous road by power driven hammer for barricating work as per direction of Engineer in charge Ist Day |
| 14 | VIP Chair with cushion 1st Day |
| 15 | VIP Chair with cushion Subsequent days(per Day) |
| 16 | Add extra for hire charge for providing welded mesh size 25x25 mm (16SWG) over barricating (excluding hire charge of barricating) 1st Day |
| 17 | Add extra for hire charge for providing welded mesh size 25x25 mm (16SWG) over barricating (excluding hire charge of barricating) Subsequent days(per Day) |
| 18 | Water proofing canopy with ornamental frill, inner ceiling & curtains Above size 20'x20' 1st Day |
| 19 | Water proofing canopy with ornamental frill, inner ceiling & curtains Above size 20'x20' Subsequent days(per Day) |
| 20 | Deluxe sofa Three Seater 1st Day |
| 21 | Deluxe sofa Three Seater Subsequent days(per Day) |
| 22 | Deluxe sofa Two Seater 1st Day |
| 23 | Deluxe sofa Two Seater Subsequent days(per Day) |
| 24 | Chemical toilet with house keeping arrangement and providing liquid soap, tissues, comb, freshener etc. 1st Day |
| 25 | Chemical toilet with house keeping arrangement and providing liquid soap, tissues, comb, freshener etc. Subsequent days(per Day) |
| 26 | Floor Covering : Non woven Synthetic carpet (Red/Green) (New) 1st Day |
| 27 | Floor Covering :Non woven Synthetic carpet (Red/Green) (New) Subsequent days(per Day) |
| 28 | Curtain cloth (View cutter ) made out of steel pipe frame covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete . 1st Day |
| 29 | Curtain cloth (View cutter ) made out of steel pipe frame covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete . Subsequent days(per Day) Please Enable Macros to View BoQ information |