| 1 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. |
| 2 | Prepairing of boring hole for pile foundation by hand ouger sat. Including of all lobour T&P etc. |
| 3 | Cement concrete with 20cm (3/4\\") gauge approved stone ballast, approved coarse sand, cement in the proportion 1:2:4 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. SI No. 281 |
| 4 | Construction of Granular Sub-Base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 5 | Cement concrete with 4cm (1/2\\") gauge approved stone ballast, approved coarse sand, cement in the proportion 1:4:8 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. SI No. 281 |
| 6 | R.C.C. Road works cement appoved coatsesand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 in Foundation excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I.Icludind 25 Mycron Polythin & shuttening etc. and also including supply of all materials, labour and tools and plants etc. requred for proper completion of the work binding wire to be supplied by the contractor free of cost. |
| 7 | Mild steel or iron in plain work such as R.C.C. / R.B.(when not included in over all rates) wrought to requied sape as necessary including bending for proper completion of the work and including supply of steel , its wastage and hooks and authorised overlapping shall be masaured. SI. No. 504 |
| 8 | Class 150 Brick work in1:3 |
| 9 | 12mm thick plaster 1:4 cement sand morter. In plain surface. Including of all material labour T&P etc. SI No. 584 |
| 10 | Earth work filling t with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. |
| 11 | Supply and Fixing of Flat Iron 100x100x6 DSR Rate |
| 12 | Supply and Fixing of GI PipePlate DSR Rate |
| 13 | Supply and Fixing of 2 Inches Pipe 6mm thicknes DSR Rate |
| 14 | Supply and Fixing of GI Sheet 6mm corrugated |
| 15 | Painting trus,purling and runner DSR Rate |
| 16 | Providing and Laying Granite Marble Stone. (SOR pg 11) |
| 17 | Sign Board |
| 18 | Providing and Fixing Photograph |
| 19 | 18% GST Please Enable Macros to View BoQ information |