| 1 | Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . |
| 2 | Carriage of Excavated earth by mechanical means with in 5km lead including loading and unloading with all cost Conveyance T&P sun dries etc.complete as per direction of Enggineer-in-charge. |
| 3 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete |
| 4 | C.C. ( 1 : 4:8 ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete |
| 5 | PCC work in M- 20 Grade of concrete with 20 mm & down graded size CBHG chips including hoisting & laying & cost, conveyance to site , royalty , Cess DMF & EMF and additinol royalty etc. All taxes of all materials complete. |
| 6 | R.C.C. work in C.C. (1:1.1/2:3 ) Grade of concrete using 12 mm & down graded size hg chips including hoisting & laying the concrete, watering and curing etc. including cost of centering and shuttering for the work etc. all complete to required levels laid in layers including cost, conveyance to site , royalty , cess DMF & EMF and additinol royalty etc. all taxes of all materials & cost of all labour complete Base of Column |
| 7 | Plinth Band |
| 8 | Lintel |
| 9 | Column |
| 10 | Roof Beam |
| 11 | Roof Slab |
| 12 | Chhajja |
| 13 | Shelves Reg Slab, Kitchen Slab |
| 14 | Cutting, Straightening coiled or bent up TOR steel, bending, binding, welding and jointing if necessary and tying the grills and placing in position including cost of binding wire 18 to 20 gauge as required for R.C.C. works and providing fan hooks, hoisting, lowering, and laying the grills in floors and others etc. including cost of steel, conveyances, labour, royalties taxes with T & P etc. all complete in all respect as per the Direction of the Engineer in charge |
| 15 | Fly ash brick masonry in cement mortar (1:4) including watering and curing etc. complete including cost conveyance, royalities, cess DMF & EMF and additinol royalty & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge in super structure. |
| 16 | In Superstructure |
| 17 | 2.5cm thick Grading Plaster in C.M (1;2:2) over roof slab with 6mm sisie h.b chips including watering & curing etc. complete with cost , conveyance, royalty,cess DMF & EMF and additinol royalty etc all taxes of all materials and cost of all labour etc. all complete |
| 18 | 12 mm thick CP (1:6) after racking out the joints including watering & curing etc. complete with cost , conveyance, royalty,cess DMF & EMF and additinol royalty etc all taxes of all materials and cost of all labour etc. all complete . |
| 19 | 16 mm thick CP (1;6) after racking out the joints including watering & curing etc. complete with cost , conveyance, royalty,cess DMF & EMF and additinol royalty etc all taxes of all materials and cost of all labour etc. all complete |
| 20 | 6 mm thick cement plaster in C.M ( 1 : 4 ) to RCC surface finished smooth including closed deep chipping and slury treatment including cost, conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour etc. all complete . |
| 21 | Fixing Granite floor tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing compelte including cost of pre-caste tiles. & cost of all labour cess DMF & EMF and additinol royalty etc required for the work complete . |
| 22 | Supplying , fitting & fixing Vetrified Tiles in floors of size 600 mm x 600 mm of approved make confirming to IS : 13755 laid on 20 mm thick cement mortar ( 1 : 4 ) and filling joints with white cement of approved quality including cost of all materials and cost of all labour , DMF & EMF and additinol royalty etc. required for the work complet |
| 23 | Supplying , fitting & fixing Vetrified Tiles in floors of size 600 mm x 600 mm of approved make confirming to IS : 13755 laid on 20 mm thick cement mortar ( 1 : 4 ) and filling joints with white cement of approved quality including cost of all materials and cost of all labour , DMF & EMF and additinol royalty etc. required for the work complet |
| 24 | Cement washing two coats to including watering and curing complete with cost of all materials and cost of all labour and cess with T & P. required for the works etc. all complete |
| 25 | Priming one coat with any approved primer to including watering and curing complete with cost of all materials and cost of all labour and cess with T & P. required for the works etc. all complete. |
| 26 | Wall painting 2 coats to walls with Water proffing Weather coat paint of any approved shade on New work after cleaning the surface including watering & curing etc. complete including cost of weather coat & cost of all labour and cess with T & P. required for the works etc. all complete . |
| 27 | Supplying , fitting & fixing of M.S. angle framed & square bar grilled and Door & Windows with Grills and shutter of approved design & size provided with horns or W.I. Clamps including cost , conveyance etc. all taxes of all materials & cost of all labour complete . |
| 28 | Priming one coat with any approved primer to including watering and curing complete with cost of all materials and cost of all labour and cess with T & P. required for the works etc. all complete. |
| 29 | Painting two coats of synthetic enamel paint over a coat of primer of approved quality and approved shade confirming to ISI on steel work to give an even shade including sand papering and making the surface smooth in all floors at all heights including cost, conveyance,taxes of all materials, labour,cess T& P scaffolding required for the work and complete. |
| 30 | Supplying, fitting, fixing up window (sliding type) made up aluminium Section 151-154, 151 - 155, as windows frame Section No.151-155, 151-153 and 151-167 as shutter frame with 5mm thick black glass as panel lfitted with rubber beading including locking arrangment including all fitting including cost of materials, alll taxes, labour, T&P etc. complete as per direction of the Engineer-in-charge. |
| 31 | Providing & laying in trenches PVC pipes (Schedule-80) of the following nominal bore & pipe fittings including testing as per specification etc. all complete 15 mm dia PVC sch-80 pipes |
| 32 | 25 mm dia PVC sch-80 pipes |
| 33 | Fixing Rotational moulded polyethylene cylindrical vertical water storage tanks conforming to IS : 12701 - 1996 including cutting holes through the tank and fixing mild steel tubes and fitting and providing extra sockets and jam nuts, fixing ball valve etc, including hoisting upto a height of 5 metres above ground level and placing the tank to the required position etc all complete as per specification and direction of the Engineer in charge. 1500 liter capacity Double layer Cylinderical |
| 34 | Supplying and fixing sanitary installations, pipes and fittings as per P H specification including cost of all materials, T&P, labour charges etc complete as per specification & direction of Engineer-in-Charge. 15 mm dia brass Bib cock (Long body) |
| 35 | 140 mm dia round grating |
| 36 | 15 mm dia brass concealed Stop cock |
| 37 | Semi Rigid PVC waste pipe for sink & wash basin 40mm dia with length not less than 700 mm with PVC waste fittings |
| 38 | S/S Kitchen sink |
| 39 | Supply of all materials, labour T&P and fitting, fixing of UPVC SWR soil, waste ventilating pipes and fittings of the following inside diameter of conforming to IS 15392/1992 to walls with nails, bobbings and wooden plugs including jopinting with supply of approved rubber lubricants by means of non heat application method all complete as per specification & direction of Engineer-in-Charge. 110 mm PVC SWR pipe |
| 40 | UPVC single equal Tee (with door) 110x110x110 mm |
| 41 | UPVC plain shoe 110 mm bend |
| 42 | Recessed wiring to light point / fan point / exhaust fan point / call bell point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metalic PVC flexible conduit with 5 Amp,250V piano type switch ISI marked and ceiling rose ISI marked mounted on MS box having front bakelite cover of suitable size, MS box with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in charge( make of wire - Finolex/L&T/Anchor/Havells/V-Guard ) Group - A - L.P - F.P - C.B.P |
| 43 | Group - B - L.P - F.P - C.B.P |
| 44 | Recessed wiring to submain in 2 x 1.5, 2 x 2.5 , 2 x 4 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked conforming to IS-694/1990 in 20mm dia non metalic heavy duty flexible conduit 1.6mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as rquired( make of wire - Finolex/L&T/Anchor/Havells/V-Guard ) |
| 45 | Supplying and fixing of batten holder /Bk Angle holder ISI marked including connection etc. as required |
| 46 | Supplying and fixing of Fan ( Make - Usha / Orient /Havells /Bajaj/ Crompton) |
| 47 | Supplying and fixing of Fan regulator ( Cona / Ancher / Usha / Bajaj) |
| 48 | Supplying and fixing of following Piano type Switch / socket on the existing switch box / cover including connection etc. as required S.P. 5 / 6 amp socket out let piano type (make - Anchor / Cona ) |
| 49 | Supply,Installation,Testing, and Commissionning of 32 Amp DP Main Switches of following Capacity (IS-13940 Part 3/1993) on existing surface / wall mountnting and complete with HRC Fuse links, interconnections,earthing,etc.as required as per direction of Engineer in Charge. Make SEIMENS / HPL / ANCHOR / L&T / HAVELS / C&S / RK (32 Amp DP Main swich with porcelain base |
| 50 | Supplying and Installation, Testing and Commissioning of CFL Bulb etc. all complete. CFL Bulb (Philips / Crompton Greaves / Bajaj) |
| 51 | Supplying all labour , T & P , etc. for preparation of Stainless steel ACP Sheet Display Board including writing charges & provision of photto graphs Pre, during & post etc. including cost of all materials & cost of all labour complete . Please Enable Macros to View BoQ information |