| 1 | Demolishing cement concrete manually by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-Charge. including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 2 | 15mm Cement plaster in single coat on the rough side of brick/ concrete/stone walls for interior plastering upto floor two level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth. in cement mortar 1:6 (one cement :six sand) including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 3 | Providing and fixing ridges or hips 60 cm overall with 0.60mm thick prepainted steel sheets in roofing with hot dipped metalic zinc coated sheets with top coat of regular modified polyster organic coating of 20 microns over 5 microns primer coating + back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts & nuts 6mm dia & prepainted G.I. limpet and bitumen washers complete with all accessories as required including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 4 | Providing and fixing valley 60 cm overall 0.60mm thick prepainted steel sheet in roofing with hot dipped metalic zinc coated sheet with top coat of regular modified polyster organic coating of 20 microns over 5 microns primer coating back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia with prepainted G.I. limpet and bitumen washers complete with all accessories as required including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 5 | Steel work welded in built up sections trusses and farmed work including cutting hoisting fixing in position and applying a priming coat of red lead paint in grattings ,guard bars ,ladders railling bracket and similar works including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government.. |
| 6 | Providing and laying granite stone in flooring 20mm thickness base of cement mortar 1:3 ( 1 cement : 3 sand ) laid over and jointed with grey cement slurry mixed with pigment to match the shade of granite stone rubbing and polishing complete 20mm thick . including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 7 | Stone soling properly hand packed filling interies with kharanja stone and consolidation with power road roller to the required gradient and camber including spreading watering and rolling of widding materuials moorum or earth etc including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 8 | Providing and laying cement cconcrete 1:2:4 for plinth production and curing complete including the cost of farmwork for plain/reinforced concrete in retaining walls, breast walls as per drawing and HPPWD technical specification. including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 9 | White glazed tiles 6mm thick in skirting riser of steps and dado 12mm thick cement mortar 1:3 ( 1 cement : 3 sand ) and jointed with cement slurry including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 10 | Brick work using common brunt clay building bricks in all heights in cement mortar 1:6 ( 1 cement : 6 sand ) in superstructureall floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. |
| 11 | Half brick work using common brunt clay building bricks in cement mortar 1:4 ( 1 cement : 4 sand ) in superstructure above plinth level upto floor two level. including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST 18% or other taxes imposed by the Government. Please Enable Macros to View BoQ information |