| 1 | Design & Engineering |
| 2 | Supply of Plant & Equipment incl. Technological Structures for Complete belt conveyor system of 1,540 tph capacity at surface from bunker (200 cum each) having fire resistant conveyor, steel structure, idlers, impact rollers, drive mechanism motor, gears, drums, mono rails and other attachments.The conveyor will be covered at roof and open at sides. |
| 3 | Supply of Plant & Equipment incl. Technological Structures for Crushers, VGFs, Appron Feeder, Vibratory Feeders, EOT cranes etc. to handle 770 tph ore production each at/below (-) 60 mRL as per design including cables, switchgears, light fixtures, Including Liner of Fines ore bins (FOB) and other electrical appliances as per approved drawing |
| 4 | Supply of Plant & Equipment incl. Technological Structures for Complete belt conveyor system (3 nos.) at underground of 770 tph capacity from crusher to surge bin (FOB) of fire resistant conveyor, steel structure, idlers, impact rollers, drive mechanism motor, gears, drums and other attachments as per approved drawing. |
| 5 | Supply of Plant & Equipment incl. Technological Structures for Supply of Centrifugal pumps, Slime pump, submersible pump for Pump chambers and Sump area at -60 mRl and 240 mRl, delivery pipe and fitings. |
| 6 | Supply of Plant & Equipment incl. Technological Structures for Supply of all necessary equipments for Fire fighting and Water sysytem Facilities |
| 7 | Structural (steel) works including supplies & Erection of Fabricated Steel parts & BuildingStructures, conveyor structure,Underground Fine ore Bins, bunkers, sheeting, glazing and final painting etc. |
| 8 | Civil works including excavation of Fine ore Bins, foundation,PCC, RCC, buildings with brickwork, doors, windows as per approved drawings, drains, pits, etc., including any relevant supply & erection and painting etc. |
| 9 | Erection of equipment and commissioning of entire System and equipment including PG Test for Complete belt conveyor system of 1,540 tph capacity at surface from bunker (200 cum each) having fire resistant conveyor with erection of steel structure, idlers, impact rollers, drive mechanism motor, gears, drums, mono rails and other attachments.The conveyor will be covered at roof and open at sides. |
| 10 | Erection of equipment and commissioning of entire System and equipment including PG Test for Crushers, VGFs, Appron Feeder, Vibratory Feeders , EOT cranes to handle 770 tph ore production each at/below (-) 60 mRL as per design including cables, switchgears, light fixtures and other electrical appliances as per approved drawing. |
| 11 | Erection of equipment and commissioning of entire System and equipment including PG Test for Complete belt conveyor system (3 nos.) at underground of 770 tph capacity from crusher to surge bin (FOB) of fire resistant conveyor with erection of steel structure, idlers, impact rollers, drive mechanism motor, gears, drums and other attachments as per approved drawing. |
| 12 | Erection of equipment and commissioning of entire System and equipment including PG Test for Installation of Centrifugal pumps, Slime pump at Pump chamber and Sump area at -60 mRl and 240 mRl, installation of delivery pipe including connection of pipe with shaft pipe and establish pumping without leak. |
| 13 | Erection of equipment and commissioning of entire System and equipment including PG Test for Erection of Fire fighting and Water sysytem Facilities |
| 14 | Spares for commisioning & 2 year of operation |
| 15 | AMC for PLC (3 year) Please Enable Macros to View BoQ information |