| 1 | CHEMICAL CLEANING |
| 2 | CHEMICAL CLEANING / PICKLING / DEGREASING / PASSIVATION :- Cleaning and pickling of equipment/pipeline includng preparation of circulation loop, supply of temporary piping, pumps, heater coils, gaskets, thermometer, hydrometer, valve, test coupon, spares, laboratory facilities, with all accessories for conducting test, chemicals, safety accessories and also providing or hiring all necessary equipment and whatever else even though not expressly mentioned herein and in specificaions but required to perform the work as per job specifications and instructions of Engineer-in-Charge. |
| 3 | AMINE DEGREASING OF CS PIPING |
| 4 | NB 0.500 INCHES |
| 5 | NB 0.750 INCHES |
| 6 | NB 1.000 INCHES |
| 7 | NB 1.500 INCHES |
| 8 | NB 2.000 INCHES |
| 9 | NB 3.000 INCHES |
| 10 | NB 4.000 INCHES |
| 11 | NB 6.000 INCHES |
| 12 | NB 8.000 INCHES |
| 13 | Pretreatment cum on-stream cleaning of recirculating fresh cooling water system as per the job specification (B269-000-06-41-CCS-001) & as per the instruction of Engineer-in-Charge. |
| 14 | NB 0.50 INCH |
| 15 | NB 0.75 INCH |
| 16 | NB 1.0 INCH |
| 17 | NB 1.5 INCH |
| 18 | NB 2.0 INCH |
| 19 | NB 3.0 INCH |
| 20 | NB 4.0 INCH |
| 21 | NB 6.0 INCH |
| 22 | NB 8.0 INCH |
| 23 | NB 10.0 INCH |
| 24 | NB 12.0 INCH |
| 25 | NB 14.0 INCH |
| 26 | NB 16.0 INCH |
| 27 | NB 18.0 INCH |
| 28 | NB 20.0 INCH |
| 29 | NB 24.0 INCH |
| 30 | NB 30.0 INCH |
| 31 | 36.0 INCH |
| 32 | 40.0 INCH |
| 33 | 44.0 INCH |
| 34 | 48.0 INCH |
| 35 | 52.0 INCH |
| 36 | Chemical Cleaning of Piping and Vessels as indicated in P&ID's. Work shall include supply of all chemicals,temporary facilities (including the supply of piping components like pipes, flanges,fitings,valves,fastners and gaskets etc for the providing temperorary lines for chemical cleaning) ,auxiliaries, boilers, heating coils,thermometers, valves, pressure gauges, safety gears etc required for satisfactory completion of work. The contractor should make a preliminary assessment of the site conditions and its existing facilities especially availability of HP/MP Steam, Circulating pumps, Amine Tanks, etc to make a final assessment of the temporary facilities, auxiliaries and spares that has to be arranged by him for deployment at site. Required numbers of operating and supervisory staff for the Degreasing operation need to be deployed by the contractor so as to ensure continuous availability of manpower during the entire operation and whatever else even though not expressly mentioned herein and in specification but required to perform the work as per specifications and instructions of Owner/Engineer-in- Charge |
| 37 | Chemical cleaning as per Job Specification for external chemical cleaning and passivation of ss welds and fittings of tanks and pipes (B269-000-06-41 -CCS-011) (Unit of measurement - No. of joints) |
| 38 | NB 0.50 INCH |
| 39 | NB 0.75 INCH |
| 40 | NB 1.0 INCH |
| 41 | NB 1.50 INCH |
| 42 | NB 2.0 INCH |
| 43 | NB 3.0 INCH |
| 44 | NB 4.0 INCH |
| 45 | NB 6.0 INCH |
| 46 | NB 8.0 INCH |
| 47 | CHEMICAL CLEANING OF REACTOR / COLUMN / VESSEL:Procurement of all materials, carrying out chemical cleaning / pre-cleaning / degreasing / passivation (as applicable) of equipment, arranging labour, materials, tools and tackles, consumables, supervision etc. required to complete the work in all respects as per job specification attached with the tender document and directions of Engineer-in-charge. Refer mechanical data sheet/Scope of Supply/Work attached with the tender. |
| 48 | Pre-cleaning |
| 49 | upto 20m3 |
| 50 | Degreasing |
| 51 | upto 20m3 |
| 52 | above 20m3 to 50m3 |
| 53 | \\"NOTE:-THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, FEE, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST.\\" Please Enable Macros to View BoQ information |