|
| 1 | Indigenous SOC: Cost of the Software & Hardware including 5 years Back-to-Back OEM Warranty / Support,Product Update and 5 years AMC |
| 2 | Software and Hardware for Indigenous SOC |
| 3 | Next Generation Security Information and Event Management (NG SIEM) |
| 4 | Security Orchestration, Automation and Response (SOAR) |
| 5 | Network Behaviour Anomaly Detection (NBAD) |
| 6 | User and Entity Behaviour Analytics (UEBA) |
| 7 | Database Activity Monitoring (DAM) |
| 8 | 2x2 55 inch Video Wall with CPU |
| 9 | 24x7 Workstation |
| 10 | Log Collectors in HA (in activepassive mode of operation) |
| 11 | Necessary Server & Storage infrastructure / Hyper Converged Infrastructure for complete SOC solution (working in HA mode at DC with minimum N-1 redundancy) along with necessary Licensing for Hypervisor Kernel and Server OS platforms |
| 12 | Firewall on HA (in active-passive mode of operation) with 5 year support & subscription |
| 13 | Server Rack |
| 14 | Switches & Router |
| 15 | Cable & accessories |
| 16 | Installation, configuration and training |
| 17 | Comprehensive AMC along with L1& L2 Resources for Indigenous SOC |
| 18 | Comprehensive Operation and Maintenance cost for SOC |
| 19 | Deputation of outsourced technicalexperts for operating the SOC 24 x 7 (1 nos of Level 1 and 1 nos of Level,2 resources round the clock) |
| 20 | Indigenous NOC: Cost of the Software & Hardware including 5 years Back-to-Back OEM Warranty / Support,Product Update and 5 years AMC |
| 21 | Software and Hardware for Indigenous NOC |
| 22 | Network Management System (NMS) |
| 23 | ITSM Tool |
| 24 | Data Diode to restrict traffic from IT to OT system |
| 25 | A.) Necessary Server & Storageinfrastructure / Hyper ConvergedInfrastructure for complete NOCsolution (working in HA mode atDC with minimum N-1 redundancy) B.) Licensing for Hypervisor Kernel and Server OS platformswith virtualization software |
| 26 | 24x7 Workstation |
| 27 | Server rack |
| 28 | Cable and accessories |
| 29 | Installation, configuration and training |
| 30 | Indigenous NOC Operational Cost |
| 31 | Comprehensive Operation and Maintenance cost for NOC |
| 32 | 01(one) No. of L1 Manpower support for NOC operations Please Enable Macros to View BoQ information |