| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil. DSR 2.6.1 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR No 2.25 A |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm (nominal size) DSR No 4.1.6 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR No 5.1.2 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR No 5.2.2 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources).DSR 4.1.3 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for column (DSR 4.3.1) |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level/ above plinth (TMT bars of grade Fe-500D or more.DSR 5.22.6 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) DSR No 6.1.2 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of super structure class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) DSR 6.4.2 |
| 11 | 12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and DSR 13.4.1 |
| 12 | Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) : Light shade pigment using white cement DSR 11.19.1 |
| 13 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR 13.80 |
| 14 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) DSR 13.46.1 |
| 15 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.. DSR 10.2 |
| 16 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture.DSR 13.48.3 |
| 17 | Making ornamental (2D) Painting with spacial design make by specialist painter laying of two coat Birla White putty and design by Asian paint including all material etc. all complete as per Engineer in Charge (MR) |
| 18 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineerin- charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). DSR 16.69 |
| 19 | Providing and Fixing Plantation work etc all complete as per Engineer In Charge. (M.R.) |
| 20 | Providing and Fixing Cast Iron Power Coating Garden Bench 3 Seater etc all complete as per Engineer In Charge. (M.R.) |
| 21 | Providing and Fixing Garden Melalic Decorative Pole With all complete as per Engineer In Charge. (M.R.) |
| 22 | Provision for other misc works not shown properly in Drawing and required at site such as Sign Board, electrification / Solar lighting etc. |
| 23 | Disposal of Malva 05 Km Cartage Loading & Unloading as directed by Engineer In Charge. |
| 24 | P&F of inauguration Granite stone with letter embedded on smooth surface. |
| 25 | Add 1 % Labour Cess |
| 26 | Add 18 % GST Please Enable Macros to View BoQ information |