| 1 | E/W in excavation foundation in ordinary soil loam,clay or sand including lift upto 1.5 m. & lead upto 30m including filling watering & ramming of excavated earth into the trenches or in to th plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. ( S.I No-251) |
| 2 | Concrete with 40mm gauge stone ballast coarse sand of 2.20 fineness modulous & Cement in proporation of 8:4:1 in foundation and under floor, includingsupply of all material labour and T&P etc. required for proper completition of the work.(S.I. No. 281) |
| 3 | Base concrete in 1:4:8 in cement fine sand and 40 mm B/ Ballast in foundation i/c all As per S I No. 275 |
| 4 | M-150 class Brick work in 1:6 Cement & course sand and course sand of 2.20 F.M. mortor in foundation & plinth including supply of all materials, labour and T&P etc. Required for proper completion of the work. (S.I No.303) |
| 5 | RCC Work With cement, approved coarse sand & 2cm gauge approved stone grit in proportions of 1:2:4 in Plinth Beam excluding supply of reinforcemnt and its bending but inculding its fixing and bending the same with 24 B.W.G.G.I, binding wire and including necessary centering and its shuttering etc. and supply of all material labour and T&P etc. required for proper completition of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.(S.I. No. 283) |
| 6 | RCC Work With cement, approved coarse sand & 2cm gauge approved stone grit in proportions of1:1.5:3 in Slab,Sunshade excluding supply of reinforcemnt and its benidn, but inculding its fixing and bending the same with 24 B.W.G.G.I, binding wire and including necessary centering and its shuttering etc. and supply of all material labour and T&P etc. required for proper completition of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.(S.I. No.284 new item) |
| 7 | RCC Work With cement, approved coarse sand & 4cm gauge approved stone grit in proportions of 1:2:4 in Column excluding supply of reinforcemnt and its bending, but inculding its fixing and bending the same with 24 B.W.G.G.I, binding wire and including necessary centering and its shuttering etc. and supply of all material labour and T&P etc. required for proper completition of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.(S.I. No. 287) |
| 8 | RCC Work With cement, approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in Column excluding supply of reinforcemnt and its bending, but inculding its fixing and bending the same with 24 B.W.G.G.I, binding wire and including necessary centering and its shuttering etc. and supply of all material labour and T&P etc. required for proper completition of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.(S.I. No. 289) |
| 9 | M-150 class Brick work in 1:6 Cement &fine sand and Coarse sand of 1.25 F.M. mortor in Super structure including necessary cutting & moulding of brick as req. thickness of wall not be less then 1.0 brick thick add extra labour supply of all materials, labour and T&P etc. Required for proper completion of the work. (S.I No.309+310) |
| 10 | M.S or iron in plain work such as R.C.C or reinforced brick work (When not included in an over all rates wrought to required shape as necessary including bending for proper completion of the work and inckludind supply of all steel and wastage and over lapping &hooks. ( SI No. 504) |
| 11 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 12 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.l. limpet washers or with G.l. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1.00 mm thick with zinc coating not less than 275 gm/m2 |
| 13 | Providing valleys of 90 cm wide overall in plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.l. limpet and bitumen washers complete : 1.60 mm thick with zinc coating not less than 350 gm/m2 |
| 14 | Extra Labour Charge for Removing malba Please Enable Macros to View BoQ information |