|
| 1 | Providing and Fixing of German hanger 100x150, 50x34x2 Complete in all respects. Proper Completion of work as per direction of E/I. |
| 2 | Providing and Fixing of Carpet 100x150, 50x34x2 Complete in all respects. Proper Completion of work as per direction of E/I. |
| 3 | Providing and Fixing of Swiss cottage. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 4 | Providing and Fixing of Mozo Barricading. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 5 | Providing and Fixing of Steel Mozo D (ft) Complete in all respects. Proper Completion of work as per direction of E/I. |
| 6 | Providing and Fixing of Plastic Chair Complete in all respects. Proper Completion of work as per direction of E/I. |
| 7 | Providing and Fixing of Stage scaffolding 52x24 Complete in all respects. Proper Completion of work as per direction of E/I. (40 x 60 = 2400 Sqft) |
| 8 | Providing and Fixing of Chair VIP with cover Complete in all respects. Proper Completion of work as per direction of E/I. |
| 9 | Providing and Fixing of Ceiling cloth work 100x150, 50x34x2 Complete in all respects. Proper Completion of work as per direction of E/I. |
| 10 | Providing and Fixing of LED wall 20 x 80 x 1 Nos, 10 x 8 x 12 Nos. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 11 | Providing and Fixing of Sofa 2 seater. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 12 | Providing and Fixing of Table Complete in all respects. Proper Completion of work as per direction of E/I. |
| 13 | Providing and Fixing of Table cover Complete in all respects. Proper Completion of work as per direction of E/I. |
| 14 | Providing and Fixing of Frill. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 15 | Providing and Fixing of Media stage 12 x 16 Complete in all respects. Proper Completion of work as per direction of E/I. |
| 16 | Providing and Fixing of Deepdan with material. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 17 | Providing of Podium decoration (5 flower bead (ft).Complete in all respects. Proper Completion of work as per direction of E/I. |
| 18 | Providing of Stage decoration ( 4 flower bead ft). Complete in all respects. Proper Completion of work as per direction of E/I. |
| 19 | Providing of LED decoration ( 3 flower bead ft). Complete in all respects. Proper Completion of work as per direction of E/I. |
| 20 | Tabel bookie. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 21 | Gendha ladi(ft). Complete in all respects. Proper Completion of work as per direction of E/I. |
| 22 | Providing and Fixing of Mix flower ladi (ft). Complete in all respects. Proper Completion of work as per direction of E/I. |
| 23 | Providing of Wall arrangement bunches. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 24 | Providing and Fixing of Gantry and Flex. (Pillar Size 4 x 4 x 16 x 2 Nos and Top 4 x 4 x 20 x 1 Nos.) x 8 Proper Completion of work as per direction of E/I. (One Time) (LMR) |
| 25 | Providing and Fixing of Standy Structure with Flexy (ize 5 x 8 x 300 = 12000 and 2 x 10 x 200 = 40000) = 52000 Sqft. Proper Completion of work as per direction of E/I. (One Time) (LMR) |
| 26 | Providing and Fixing of Wooden Flooring Proper Completion of work as per direction of E/I. (One Time) (LMR) |
| 27 | Providing and Laying of Single Phase Submain size of 2.5 Sq.mm to 6.00 Sq.mm. Complete in all respects.Proper Completion of work as per direction of E/I. |
| 28 | Providing and Laying of Three Phase Submain Size of 10 Sq.mm to 35 Sq.mm .Complete in all respects.Proper Completion of work as per direction of E/I. |
| 29 | Providing and Fixing of Main Pannel Distribution bord 1 No. 63 Amp. 230 volt SPN, Incoming and Out going as per Site required. Per Day. |
| 30 | Providing and Fixing of Main Pannel Distribution bord 1 No. 100 Amp. 440 volt TPN, Incoming and 4 Nos, 32 Amp. Out going. .Complete in all respects.Proper Completion of work as per direction of E/I. |
| 31 | Providing and Fixing of Change over switch 200 Amp. TPN. Complete in all respects.Proper Completion of work as per direction of E/I. |
| 32 | Providing and Laying of 95 Sq.mm 3.5 core/ 4 Core Aluminium Cable |
| 33 | Providing and Laying of 70Sq.mm 3.5 core/ 4 Core Aluminium Cable |
| 34 | Providing and Fixing of Column Speaker /Horn |
| 35 | Providing and Fixing of buffer Speaker 300-600Watt |
| 36 | Providing and Fixing of Halogen LED Flood light 100Watt to 200 Watt per day |
| 37 | Providing and Instalation of Generatot 63KVA with Diesel & opretor per day.Complete in all respects. Proper Completion of work as per direction of E/I. |
| 38 | Providing and Instalation of Generatot 125KVA with Diesel & opretor per day.Complete in all respects. Proper Completion of work as per direction of E/I. |
| 39 | Providing and Fixing of RGB LED Par Light 36 watt to 90 watt. Complete in all respects. Proper Completion of work as per direction of E/I. |
| 40 | Providing and Fixing of Air Conditioner (AC) 1.5 Ton Window. Complete in all respect. (Qty as per site requirment.) |
| 41 | Providing and Fixing of Tower Air Conditioner (AC) 2 Ton Complete in all respect. (Qty as per site requirment.) |
| 42 | Supply and Fixing of Air Conditioner (AC) 5 Ton Ductable Complete in all respect. (Qty as per site requirment.) |
| 43 | Providing and Fixing of Ceiling Fan One time. Proper Completion of work as per direction of E/I. (Qty as per site requirment.) |
| 44 | Providing and Fixing of Pedestal Fan Hight Flow One time. Proper Completion of work as per direction of E/I. (Qty as per site requirment.) (Qty as per site requirment.) Please Enable Macros to View BoQ information |