| 1 | Providing and fixing ISi marked oxidised M.S.sliding door bolts with nuts and screws etc. complete (Copper oxidised as per IS 1378) : 300x16 mm |
| 2 | Providing and fixing ISi marked oxidised M.S.sliding door bolts with nuts and screws etc. complete (Copper oxidised as per IS 1378)e : 250x16 mm |
| 3 | Providing and fixing ISi marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete (Copper oxidised as per IS 1378): 250x10 mm |
| 4 | Providing and fixing ISi marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete (Copper oxidised as per IS 1378): 150x10 mm |
| 5 | Providing and fixing ISi marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete (Copper oxidised as per IS 1378): 125 mm |
| 6 | Providing and fixing ISi marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete (Copper oxidised as per IS 1378): 100 mm |
| 7 | Kata stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1:4 (1cement :4 coarse sand) : 25 mm thick |
| 8 | Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. One coat |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work |
| 10 | Finishing walls with Acrylic Smooth exterior paint of required shade Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 11 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1 cement : 4 fine sand) |
| 12 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 13 | Providing and applying filling with cement based putty (Birla, Jk or equivalent) to the required finish complete in all respect and to the entire satisfaction of Engineer-in-charge. |
| 14 | Provding and laying water proofing coating having three coats of rain jackets @ 15 sqft/kg over a priming coat of water proofing paint @10sqft/kg including mesh of size 800 microns with total thickness of 900 to 1000 microns forming high elastic and resilient coating to UV rays and non toxic in nature with minimum life of 10 years complete in all respect as per directon and to the entire satisfaction of the Engineer in charge. Please Enable Macros to View BoQ information |