| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 2 | Construction of embankment with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compacted to meet requirement of table 300-2, MORT&H Specification-305 |
| 3 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(Compaction) |
| 6 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 8 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 9 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grading-1) |
| 10 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 11 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects |
| 12 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 100 mm as per drawings and Technical Specification Clause 1504. |
| 13 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 14 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 15 | Providing Laying reinforced cement concrete in open foundations & sub-structure complete as per drawings and technical specifications Clause RCC Grade M20 using batching plant transit mixer & manual placing |
| 16 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (R.C.C. grade M-25) |
| 17 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (R.C.C. grade M-30) |
| 18 | Apply priming coat over new plaster & other surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes ,fine steel /wood scrappers sand papering and knotting including cost of all materials, labour abd T&P etc required for proper completion of the work. As per SOR new item 1B |
| 19 | Painting two coat over priming coat(but excluding cost of priming coat) on wood or steel and other metal surface with superior synthetic enamel standard make brushing to give an even shade and finish and includjng cleaning the surface of all dirt dust and other foreign matter sand papering and stripping including cost of all materials ,labour ,T&P etc required for the proper completion of the work. As per SOR new item 2 & 3 |
| 20 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. |
| 21 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications |
| 22 | Providing and laying filter material underneath pitching in slopes using Stone spalls of required size 40 mm avg size complete as per drawing and technical specifications |
| 23 | Providing and laying stone boulder pitching using 25-60 kg stone boulder on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications . (Wire crates) |
| 24 | Providing and laying stone boulder apron on river bed for protection againest scour with stone boulder weighting not less than 40 kg each complete as per drawing and technical specifications (MORT&H Specification no 2503 |
| 25 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. Please Enable Macros to View BoQ information |